ILLINOIS POLLUTION CONTROL BOARD
April 21, 2005
PEOPLE OF THE STATE OF ILLINOIS,
Complainant,
v.
ACI ENVIRONMENTAL CORPORATION
and ASBESTOS CONTROL, INC.,
Respondents.
)
)
)
)
)
)
)
)
)
)
PCB 05-180
(Enforcement - Air)
ORDER OF THE BOARD (by G.T. Girard):
On March 29, 2005, the Office of the Attorney General, on behalf of the People of the
State of Illinois (People), filed a two-count complaint against ACI Environmental Corporation
and Asbestos Control, Inc. (respondents).
See
415 ILCS 5/31(c)(1) (2000); 35 Ill. Adm. Code
103.204. The People allege that respondents violated Sections 9(a) and 9.1(d) of the
Environmental Protection Act (Act) (415 ILCS 5/9(a) and 9.1(d) (2002)), 35 Ill. Adm. Code
201.141, and 40 C.F.R. §61.145(c)(3) and (c)(6). The People further allege that respondents
violated these provisions by conducting renovations in the boiler room of the Oak Meadows Golf
Course, located at 900 Wood Dale Road, Addison, DuPage County.
The Board accepts the complaint for hearing.
See
35 Ill. Adm. Code 103.212(c). A
respondent’s failure to file an answer to a complaint within 60 days after receiving the complaint
may have severe consequences. Generally, if respondents fails within that timeframe to file an
answer specifically denying, or asserting insufficient knowledge to form a belief of, a material
allegation in the complaint, the Board will consider respondents to have admitted the allegation.
35 Ill. Adm. Code 103.204(d). The Board directs the hearing officer to proceed expeditiously to
hearing.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on April 21, 2005, by a vote of 5-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board