ILLINOIS
ENVIRONMENTAL
PROTECTION
AGENCY
1021
NORTH
GRAND AVENUE
EAST,
P.O.
Box
19276,
SPRINGFIELD,
ILLINOIS
62794-9276, 217-782-3397
JAMES
R.
THOMPSON
CENTER,
100
WEST RANDOLPH,
SUITE
11-300,
CHICAGO,
IL 60601, 312-814-6026
ROD
R.
BLAGOJEVICH,
GOVERNOR
RENEE
CIPRIANO,
DIRECTOR
RECEIVED
CLERK’S OFFICE
(217)782-5544
APD
1
TDD:
(217)782-9143
5
STATE OF ILLINOIS
Pollution Control Board
April 12, 2005
ri~’,~
O~—~c~O~-j
Dorothy Gunn, Clerk
Pollution Control Board
100 West Randolph Street
Suite
11-500
Chicago,
IL
60601
RE:
NOTICE OF PROVISIONAL VARIANCE APPROVAL
—
PV
2005-122-05
Natural Gas Pipeline Company
—
Station 311
Dear Ms. Gunn:
Pursuant to Subsection 37(b) of the Environmental Protection Act
(415
ILCS
5/37(b)),
attached is a copy of the
Illinois EPA’s recent approval of a request for provisional variance.
As you know, the Board must maintain for
public inspection copies of all provisional variances filed with it
by the Illinois EPA.
Please feel free to call me
at the number referenced above should you have any questions.
Sincerely
z~~L
~
William D. Ingersoll
Acting Chief Counsel
Division of Legal Counsel
Attachment
ROCKFORD
—4302
North Main Street,
Rockford,
IL 61103
—
(815) 987-7760
•
DES
PLAINES
—
9511
W.
Harrison
St.,
Des
Plaines,
IL 60016
—
(847) 294-4000
ELGIN
—595 South State,
Elgin,
IL 60123 —(847) 608-3131
•
PEORIA
—5415 N.
University
St.,
Peoria,
IL 61614— (309) 693-5463
BUREAU
OF LAND
-
PEORIA
—
7620 N.
University
St.,
Peoria,
IL 61614— (309) 693-5462
•
CHAMPAIGN
—2125 South
First Street, Champaign,
IL 61820
—
(217) 278-5800
SPRINGFIELD
—4500 5. Sixth
Street
Rd., Springfield,
IL 62706
—
(217) 786-6892
•
COLLINSVILLE
—2009 Mall
Street, Coliinsville,
IL 62234
—
(618) 346-5120
MARION
—
2309 W. Main St.,
Suite
116, Marion, IL 62959 —(618) 993-7200
PRINTED
ON
RECYCLED
PAPER
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY E~:
April
12,2005
~-~t
~
Natural Gas Pipeline Company
—
)
STATE
OF
ILL1N~~
Station 311
)
-
Pollution Control
Board
)
Petitioner,
)
v.
)
IEPA-
~S-oo~
)
ILLINOIS ENVIRONMENTAL PROTECTION
)
(Provisional Variance
-
RCRA
-Land)
AGENCY,
)
)
Respondent.
)
)
RE:
PROVISIONAL VARIANCE APPROVAL
-
PV 2005-122-05
Natural Gas Pipeline Company
—
Station 311
1470255001/ILT18001509
1/Piatt
County/Compliance
On April
8, 2005, the
Illinois EPAreceived the attached request in which Natural Gas Pipeline Company
(“NPGL”) requested a provisional variance from the accumulation time limitations of
35
Ill. Adm. Code
722.134(b) forthe above-referenced facility. The Illinois EPA has reviewed the information provided and
has decided to grant a provisional variance from the accumulation time limitations of 35
Ill. Adm. Code
722.134(b) due to unforeseen, temporary and uncontrollable circumstances.
Compliance
with
the
accumulation time limitations of 35
Ill. Adm. Code 722.134(b) would impose, under these circumstances,
an arbitrary or unreasonable hardship.
The grant of this provisional variance appears consistent with 40
CER 262.34(b)
(1991), adopted pursuant
to the Resource Conservation and Recovery Act of 1976
(P.L.
94-5
80),
which authorizes the Regional
Administrator for the United States Environmental Protection Agency to grant similar extensions when
hazardous wastes must remain on-site for longer than 90 days due to unforeseen, temporary, or
uncontrollable circumstances.
This provisional variance from the accumulation time limitations of 35 Ill. Adm. Code 722.134(b) is
granted for the time period from April
13, 2005 through May
13, 2005
subject to the following
conditions:
A.
NPGL shall notif~’
Brian White of the Agency by telephone at 217/782-9987 when the
waste has been delivered to the TSD facility. Written
confirmation of this notice shall be
sent within five
days to the following address:
.
Illinois Environmental Protection Agency
Bureau of Land
—
Compliance
Section
Attention: Brian White
1021
North Grand Avenue East, MC #24
P.O.Box 19276
Springfield, Illinois 62794-9276
B.
NPGL shall sign a certificate of acceptance of this provisional variance and forward that
certificate to Brian White at the address indicated above within ten days ofthe date of
this order. The certification should take the following
form:
I(We)
_____________________,
hereby accept and agree to be bound by all terms and
conditions of the provisional variance granted by the Agency in
__________________
dated
Petitioner
.
Authorized Agent
.
Title
Date
The Illinois EPA grants
this
provisional variance in
accordance with
its authority contained
in
Sections
35(b),
36(c)
and
37(b)
of the~EnvironmentalProtection
Act (415
ILCS
5/35(b),
36(c) and 37(b), (2004)).
The
decision
to
grant
this provisional
variance
is
not intended
to
address compliance with
any other
applicable law and regulation.
~,,
Attachment
cc:
Illinois Pollution Control Board
Williani D. Ingersoll
Acting Chief Counsel
Division ofLegal Counsel
APR—O8—2O~5
15:G2
DLC
LEGAL
P.~1/O2
04/08/2005
FRI
3:58
FAX
620
793
5521
T & C ~FG
~O01/002
Kinder Morgan, Inc.
1020
Hoover Street
Great Bend, Kansas
67530
EA.CSIMILE COVER SHEET
TO:
William Ingersoll
11 linois Environmental Projection Agency
Division ofLegal
Counsel
FROM:
Scott M. Yount, P.G.
COMPANY:
Kinder Morgan, Inc.
PHONE:
(620) 793-5858
FAX:
(620)793-5521
DATE:
April
8, 2005
PAGES
INC1.~U
DING COVER SHEET:
2
COMMENTS:
-~
As we discussed on the telephone, enclosed is Natural Gas Pipeline Company’s request
for a 30-day extension to
the
90-day
on ~1te
accumulation peilod concerning
itS
Station
311
facility in
Hammond, IL.
Should you have any questions regarding the attached
request, please contact me at the number provided above.
Qsnfidon(ialily Notiac
This
informiithm
,ntIlined
in
this fhx is
ijflciidcd
for thc
~
of
(1)c
jndiv~duator ~ntky
inniect
and may
ContOin
in
ft,rm~ition
that is
APR—08—2005
15:02
DLC
LEGAL
P.
04/08/2005
FRI
3:58
FAX
620 793 5521 T & C ~FG
~002/002
KINDERIè;M0RGAN
7/
INC
1020 IThover Street
Orcat
Bend, KS
67530
Via i~acshnilc
April
8, 2005
Ill
IflOJS
Environmental Projection Agency
Division ofLegal Counsel
Attn:
William Ingersoli
1021
North
Grand Avenue East
P.O.
Box
19276
Springfield, IL
63794-9270
Re~
Natural Gas Pipeline
Company
—
Station 3
11
Hammond,
Illinois
EPA ID 1/ILTI800 15091
Dear Mr.
Ingersoll:
As provided for under 415
ILCS
5\35
and
Title 35
Part 722.134(b), Natural Gas Pipeline
Company (NGPL), a subsidiary of Kinder Morgan,
Inc., respeetMly.rcqucsts a 30 day
exEen~iøn
to The 90-day on
site
accumulation
period.
The 90-day period is set
to
expire
April
13, 2005, however
the
TSD
1~aciiity
has recently intbrmed
NGPL
that due to
scheduling issues at their f~tei1i1ythey would not he able ~oaccept the tank truck into their
fiiciity
Oil
the original
shipment
date ofApril
13th,
The waste currently
on
site contains
PCBs.
Due to
the presence of PCBs
in
the waste,
the
number offacilities that will
accept
-~
this waste is very linijied (~OPL
is aware of~
only two facilities that will accept this type
ofwaste).
i’he scheduled date for pickup
at our facility is now set for April
19,
2005.
Should you
have any questions or concerns, please contact mc at 620-793-5858.
Thank
you in advance
ror
your assistance with this matter.
Sincerely,
KINDER
MOR
1’.G.