1. SUMMARY OF COMPLAINT AND RELIEF REQUESTED
    2. Violations Alleged in Second Amended Complaint
      1. Count I – Alleged Groundwater Violations
        1. Count II – Alleged Failure to Monitor and Control Leachate
          1. Count III – Alleged Refuse in Water
          2. Count IV – Alleged Permit Violations
          3. Count V – Alleged Failure to Provide Adequate Cover on Refus
          4. Count VI – Alleged Financial Assurance Violations
          5. Count VII – Alleged Violations of Closure Requirements
          6. Count IX – Failure to Have a Chief Operator with Prior Condu
    3. Relief Requested in Second Amended Complaint
    4. FACTS
    5. Overview of the Site and Witness Testimony
      1. Site Permits
        1. Groundwater Monitoring Wells
        2. Agency Inspections
          1. Groundwater Monitoring
          2. Leachate Control
          3. Erosion and Above Ground Water Control
          4. Permit Requirements
          5. Open Burning and Presence of Landscape Waste
          6. Status of Landfill Cover
          7. Closure Requirements
          8. Chief Operator
    6. PRELIMINARY MATTERS
    7. Motion for Sanctions
    8. On September 9, 2004, the People moved for sanctions and req
    9. Jersey Sanitation responded, after the expiration of the res
    10. Procedural Objections at Hearing
    11. The People’s Objections
    12. Objection to Continuance of Hearing. At hearing, the People
    13. Objection to Late Disclosure of Witnesses. Jersey Sanitatio
      1. Jersey Sanitation’s Response
        1. Board Analysis
    14. Previously Adjudicated Violations
      1. Jersey Sanitation’s Arguments
        1. People’s Arguments
          1. Board Discussion
          2. NO LONGER CONTESTED COUNTS
    15. Alleged Violations Struck by Board’s Partial Summary Judgmen
      1. Background
        1. Summary Judgment Granted in Favor of Jersey Sanitation Regar
          1. Violations Jersey Sanitation Concedes it Committed
          2. Count II: Admitted Failure to Monitor and Control Leachate
          3. Count III: Admitted Presence of Refuse in Flowing Water
          4. The People allege that refuse was present in flowing water a
          5. Count V: Admitted Failure to Provide Adequate Cover
          6. Count VI: Admitted Failure to Meet Financial Assurance Requ
    16. Burden of Proof
      1. Count I: Alleged Groundwater Quality Violations – Arsenic,
        1. Applicable Law
        2. Section 620.115 of the Board’s regulations requires complian
        3. Section 620.420 of the Board’s regulations sets forth the sp
          1. People’s Arguments
          2. Jersey Sanitation’s Arguments
          3. People’s Reply
        4. Count IV: Alleged Violations of Permit Requirements
          1. Applicable Law
        5. No person shall:
          1. Jersey Sanitation’s Arguments
          2. People’s Arguments
          3. Board Analysis Finding Violations as Alleged
          4. Applicable Law
        6. Section 807.305(c) of the Board’s solid waste regulations re
          1. Jersey Sanitation’s Arguments
          2. People’s Reply
          3. Board Analysis Finding Violations as Alleged
        7. Count VIII: Open Burning and Air Pollution
          1. Applicable Law
        8. Section 237.102 of the Board’s rules prohibits open burning:
        9. People’s Arguments
          1. Jersey Sanitation’s Arguments
          2. People’s Arguments
          3. Board Analysis Finding Violations as Alleged
    17. REMEDY
      1. The Social and Economic Value of the Pollution Source
        1. Any Subsequent Compliance
    18. Section 42(h) Factors
      1. People's Arguments
        1. Jersey Sanitation’s Arguments
          1. In response, Jersey Sanitation disputes that it enjoyed an “
      2. ATTORNEY FEES

ILLINOIS POLLUTION CONTROL BOARD
February 3, 2005
 
PEOPLE OF THE STATE OF ILLINOIS,
 
Complainant,
 
v.
 
JERSEY SANITATION CORPORATION, an
Illinois corporation,
 
Respondent.
 
)
)
)
)
)
)
)
)
)
)
 
 
 
 
PCB 97-2
(Enforcement – Land, Water)
JANE E. MCBRIDE AND GREG RICHARDSON,
  
STEPHEN D. HEDINGER, HEDINGER & HOWARD, APPEARED ON BEHALF OF
RESPONDENT.
 
OPINION AND ORDER OF THE BOARD (by N.J. Melas):
 
On July 8, 1996, the Attorney General’s Office, on behalf of the People of the State of
Illinois (People) filed an eight-count complaint against Jersey Sanitation Corporation (Jersey
Sanitation). Jersey Sanitation operates a 10-acre site two miles from Jerseyville in Jersey
County.
 
The People filed their second amended complaint on January 8, 2001, adding a ninth
count (Sec. Am. Comp.). The People alleged that respondent Jersey Sanitation violated various
sections of the Environmental Protection Act (Act) (415 ILCS 5/1
et seq
. (2002)), the Board’s
regulations, and several conditions of its operating permit with respect to Jersey Sanitation’s
operation of a sanitary landfill in Jerseyville, Jersey County.
 
Below, first the Board presents the procedural background and the facts of the case.
Second, the Board briefly discusses the violations found by summary judgment and the
violations that Jersey Sanitation concedes in its post-hearing brief. Third, regarding the
remaining violations, the Board presents the parties’ arguments, analyzes the arguments, and
makes a determination on each. The Board finds that Jersey Sanitation knowingly and willfully
violated 15 provisions of the Act and 16 Board regulations. The Board also finds that
groundwater violations lasted 13 years. Finally the Board discusses remedy, imposes a $65,000
civil penalty, and awards the Attorney General $24,100 in attorney fees.
 
PROCEDURAL BACKGROUND
 
As stated above, the People filed this enforcement action on July 8, 1996. On October 5,
1999, the Illinois Environmental Protection Agency (Agency) granted Jersey Sanitation a post-

 
 
2
closure permit for its sanitary landfill. Jersey Sanitation appealed the permit, challenging several
conditions of its 1999 post-closure permit. Jersey Sanitation Corp. v. IEPA, PCB 00-82, slip op.
at 15 (June 21, 2001);
aff’d
IEPA v. Jersey Sanitation Corp., 271 Ill. Dec. 313, 784 N.E.2d 867
(4th Dist. 2003). The People amended the complaint on August 14, 2000, and again on January
8, 2001, to allege additional violations. On June 21, 2001, the Board granted Jersey Sanitation’s
motion for summary judgment in the permit appeal and directed the Agency to strike the
contested conditions. In its final opinion and order, the Board found that Jersey Sanitation had
demonstrated that, absent the conditions, the permit would not violate the Act or Board’s
regulations.
Id
.
 
On November 5, 2001, Jersey Sanitation filed a motion for summary judgment in this
enforcement action. In its motion, Jersey Sanitation moved the Board to strike portions of two
counts (counts IV(d) and IX) in the complaint relating to alleged violations of permit conditions
that were struck by the Board in the related permit appeal. On April 4, 2002, the Board granted
Jersey Sanitation’s motion for summary judgment.
 
Hearing Officer Carol Webb (
nee
Sudman) held hearing on September 23 and 24, 2003.
At the September hearing, five witnesses testified on behalf of the complainant: Mrs. Joyce
Munie, Mr. Blake Harris, Mr. Rich Johnson, Mr. Charlie King, and Mrs. Karen Nelson. Two
witnesses testified on behalf of Jersey Sanitation: Mrs. Pam Shourd and Mr. Andy Rathsack.
 
The hearing reconvened on October 17, 2003, to allow Jersey Sanitation to call its final
witness. Counsel for Jersey Sanitation appeared at hearing with two new witnesses that had not
been previously disclosed, Mr. Ken Liss and Mr. Bradley Hunsberger. The People requested the
opportunity to depose the witnesses, and respondent did not object. The hearing was continued
and reconvened again on January 13, 2004, where Mr. Liss, Mr. Hunsberger, and Mrs. Nelson,
as a rebuttal witness, testified. After close of all the hearings, Hearing Officer Webb found all
the witnesses credible.
 
On April 20, 2004, the People filed a post-hearing brief. Jersey Sanitation filed a post-
hearing brief on October 22, 2004. The People replied on November 10, 2004.
 
SUMMARY OF COMPLAINT AND RELIEF REQUESTED
 
Under the Act, the Attorney General may bring actions before the Board to enforce
Illinois’ environmental requirements on behalf of the People.
See
415 ILCS 5/31 (2002); 35 Ill.
Adm. Code 103. In this case, the People brought a nine-count against Jersey Sanitation for
alleged violations at a sanitary landfill in Jerseyville, Jersey County. Each of the nine counts is
summarized below, followed by a description of the People’s requested relief.
 
Violations Alleged in Second Amended Complaint
 
Count I – Alleged Groundwater Violations
 
In count I of the complaint, the People allege that Jersey Sanitation violated Sections
12(a) and (d) of the Act and Sections 620.115, 405, and 420(a) and (d) of the Board’s regulations

 
 
3
by causing violations of Class II groundwater quality standards at the site. 2nd Am. Compl. at 1-
9.
 
Count II – Alleged Failure to Monitor and Control Leachate
 
In count II of the complaint the People allege that Jersey Sanitation violated Sections
12(a) and (d) and 21(o)(2) and (3) of the Act and Sections 807.313, 314(e), and 315 of the
Board’s solid waste rules for failing to install and maintain controls at the landfill so as to
prevent and control leachate seeps and flows. 2nd Am. Compl. at 9-12.
 
Count III – Alleged Refuse in Water
 
The People allege in count III of the complaint that Jersey Sanitation violated Sections
12(a) and (d) and 21(o)(1) of the Act by causing or allowing flowing waters and erosion streams
at the site to contain refuse . 2nd Am. Compl. at 12-13.
 
Count IV – Alleged Permit Violations
 
In count IV of the complaint, the People allege that Jersey Sanitation violated Section
21(d)(1) and (2) and 21(e) of the Act and Sections 745.181, 201, 807.301, 302, 315, and 524(a)
of the Board’s regulations for failing to fulfill several conditions of its supplemental permits.
2nd Am. Compl. at 14-28.
 
Count V – Alleged Failure to Provide Adequate Cover on Refuse
 
In count V of the complaint, the People allege Jersey Sanitation violated Section 21(o)(5)
of the Act and Section 807.305(a) of the Board’s rules for failing to place a compacted layer of
six inches of cover material on exposed refuse at the end of the operating day. 2nd Am. Compl.
at 28-30.
 
Count VI – Alleged Financial Assurance Violations
 
In count VI of the complaint, the People allege that Jersey Sanitation violated Sections
21(d) and 21.1(a) of the Act, Sections 807.302, 601, 603(b)(1), and 623 (1993) of the Board’s
financial assurance regulations, Section 807.302, and its supplemental permit for failing to
provide updated financial assurance information and for failing to maintain financial assurance in
accordance with then-current cost estimates. 2nd Am. Compl. at 30-33.
 
Count VII – Alleged Violations of Closure Requirements
 
The People allege in count VII of the complaint that Jersey Sanitation violated Sections
21(d)(1), (2), (o)(6) and 22.17 of the Act and Sections 807.305(c), 318(b) and (c), and 502
(1993) of the Board’s solid waste regulations for failing to: (1) install and maintain adequate
final cover; (2) adequately abate gas problems; (3) file a detailed site description upon closure of
the site; and (4) adequately control post-closure releases in order to prevent threats to human
health or the environment. 2nd Am. Compl. at 33-37.

 
 
4
 
Count VIII – Alleged Open Burning of Landscape Waste at Jersey Sanitation
 
The People allege in count VIII of the complaint that Jersey Sanitation violated Sections
9(a) and (c) and 21(o)(4) of the Act and Section 237.102(a) of the Board’s regulations by open
burning landscape waste not exempt from regulation on the site without a permit. 2nd Am.
Compl. 37-40.
 
Count IX – Failure to Have a Chief Operator with Prior Conduct Certification
 
In count IX of the complaint, the People allege that Jersey Sanitation violated Section
21(d)(2) of the Act and Sections 745.181 and 201 of the Board’s regulations for failing to have a
chief operator with prior certification at the facility. 2nd Am. Compl. at 40-42.
 
Relief Requested in Second Amended Complaint
 
The People ask the Board to impose a civil penalty of $65,000 against Jersey Sanitation,
award the People $24,100 in costs and attorney fees, and order Jersey Sanitation to perform a
trend analysis of groundwater sample results, submit a groundwater assessment plan to the
Agency for approval and implement the plan within 30 days of approval by the Agency. If the
sampling and assessments demonstrate violations, then the People request that Jersey Sanitation
submit a corrective action/remediation plan to the Agency for approval and implement the plan
within 30 days of that approval.
 
The People also ask the Board to order Jersey Sanitation to cease and desist from all
violations of the Act and Board regulations. Accordingly, the People also request that the Board
order Jersey Sanitation to comply with its permit by submitting a biennial revision to its cost
estimates within 60 days of the date of the Board’s final disposition of this matter.
 
FACTS
 
Overview of the Site and Witness Testimony
 
Jersey Sanitation Corporation owns and controls the Jersey Sanitation Landfill (variously,
site, landfill, or facility). AG Br. at 6; citing Tr. at 326-42. Jersey Sanitation Landfill is a 10-
acre site located approximately two miles from Jerseyville in Jersey County. Parties Exh. 10.
The Agency issued to the former owner of the site, Mr. Ralph Johnson, development and
operating permits in 1974 (Development Permit Number 1973-044-DE and Operating Permit
Number 1973-044-OP). Parties Exh. 1. Mr. Johnson opened the facility in 1975. Tr. at 331.
 
Mrs. Pam Shourd, President of Jersey Sanitation, testified regarding all matters
concerning Jersey Sanitation Corporation including facts and circumstances bearing upon the
penalty amount. In the late 1980’s, neighbors living nearby the Jersey Sanitation landfill decided
to purchase the landfill through a stock purchase from Mr. Johnson with the intention of cleaning
up the site and closing it. Tr. at 341, 342, 346. Mrs. Shourd, stated that when the current
shareholders met Agency Inspector Johnson in 1989, he advised them not to purchase the landfill

 
5
because the Agency intended to enforce against the owner, Mr. Ralph Johnson. Tr. at 344-45.
Nevertheless, the current five shareholders acquired Jersey Sanitation Corporation and the
landfill in November 1989. AG Br. at 6; citing Tr. at 346.
 
Mrs. Shourd testified that because Jersey Sanitation did not have enough funds to close
the landfill immediately, the corporation operated the facility to generate enough income to shut
it down. Jersey Br. at 3; citing Tr. at 346. Jersey Sanitation accepted waste at the landfill until
September 17, 1992. Tr. at 346; Parties Exh. 42. Over the first two years that Jersey Sanitation
owned the landfill, it acquired ten pieces of equipment to cover and compact trash, and to haul
and compact dirt. The Agency certified closure of the facility on October 5, 1999, with issuance
of supplemental permit No. 1999-209-SP. Parties Exh. 42. The permit indicates that post-
closure care began September 30, 1994.
Id
.
 
Mr. Andy Rathsack, of Andrews Environmental Engineering, testified about the
background and history of the Jersey Sanitation landfill, including its permitting history, surveys
and boundary controls, and industry standards during the relevant time period of the closure and
post-closure of the facility. Mr. Rathsack stated that new Part 807 landfill regulations became
effective in 1990. At that time, facilities such as Jersey Sanitation could choose whether to close
within two years under the old regulations, or remain open and be subject to the newer, more
stringent Part 811 regulations. Jersey Sanitation chose to close within the two-year transition
period. Mr. Rathsack stated he was involved in drafting Jersey Sanitation’s 1999 application for
certification of closure. Tr. at 390-91. The post-closure permit estimated groundwater
monitoring costs at $480 per year, but according to Mr. Rathsack, that estimate would not cover
a statistical analysis. Tr. at 395-97; Parties Exh. 41, Attach. 5. Mr. Rathsack contends he quoted
Jersey Sanitation an estimate of $9,000 to do a more sophisticated groundwater assessment. Tr.
at 395.
 
Mr. Ken Liss, the Springfield office director of Andrews Environmental Engineering,
testified about sampling and analyzing groundwaters at the Jersey Sanitation site. Mr. Bradley
Hunsberger also testified on behalf of Jersey Sanitation. Mr. Hunsberger is a professional
geologist and director of hydrogeological services for Andrews Environmental Engineering. Mr.
Hunsberger helped put together the permit application for RCS Landfill located approximately
500 feet south of the boundary of Jersey Sanitation Landfill. 2004 Tr. at 50.
 
On behalf of the People, Mrs. Joyce Munie, manager of the permit section for the Bureau
of Land, related’s 1999 post-closure permit requirements. Mr. Blake Harris, an accountant for
the Agency, testified regarding financial assurance issues. Mr. Rich Johnson, Assistant Regional
Manager, Bureau of Land for the Agency, testified regarding inspections, site history, permit
background, alleged violations, and conversations with Jersey Sanitation employees and agents.
Mr. Charlie King, environmental inspection specialist with the Agency’s Bureau of Land, also
testified regarding site inspections. Mrs. Karen Nelson, a geologist and Manager of Training and
Certification Unit for the Bureau of Land, testified regarding groundwater issues.
 
At the January 2004 hearings, the Agency’s Mrs. Nelson stated that she inspected the
Jersey Sanitation site on May 16 through May 18, 1994. Tr. at 227. According to Mrs. Nelson,
Jersey Sanitation Landfill was the first site she visited under a “groundwater enforcement

 
 
6
initiative” the Agency began in 1994. Tr. at 227-28. Mrs. Nelson’s groundwater sampling and
analysis results showed exceedences of Class II groundwater quality standards in the
downgradient wells for several parameters. Tr. at 249.
 
Site Permits
 
The Agency granted Mr. Ralph Johnson a permit to develop the site, now the Jersey
Sanitation Landfill, on August 6, 1973 (Permit No. 1973-44-DE). Parties Exh. 1. The Agency
issued Mr. Johnson the operating permit on August 27, 1973 (Permit No. 1973-44-OP).
Id
.
Jersey Sanitation obtained a supplemental permit (Permit No. 1989-177-SP) that modified the
development and operating permit on November 17, 1989. Parties Exh. 6. The supplemental
permit approves the groundwater monitoring well program.
 
The Agency granted Jersey Sanitation supplemental permits 1990-448-SP and 1990-459-
SP on January 4, 1991. Permit 1990-448-SP changed the permitted operating hours of the
facility, and 1990-459-SP revised the closure, post-closure care plan and cost estimates to
increase the post-closure care period from 5 to 15 years. Parties Exh. 9. On February 8, 1993,
the Agency granted Jersey Sanitation supplemental permit 1992-350-SP that modified the
closure and post-closure care plan and cost estimates for the landfill and approved a groundwater
monitoring plan. Parties Exh. 30. Jersey Sanitation was issued another supplemental permit,
No. 1999-209-SP, on October 5, 1999, to acknowledge the receipt of certification of completion
of closure, approve the revision of final contours, and approve the biennial revision of the
closure and post closure care estimates. Parties Exh. 42.
 
Groundwater Monitoring Wells
 
Jersey Sanitation Landfill has four groundwater monitoring wells onsite. Well MW-1
(G103)
1
is an upgradient well and MW-2 (G104), MW-3 (G105), and MW-4 (G106) are
downgradient wells. Parties Exh. 28, section IV; Parties Exh. 39.
 
Agency Inspections
 
The record shows that on only one occasion, June 14, 2001, did an Agency inspector
investigate Jersey Sanitation Landfill and find no apparent violations. Parties Exh. 45.
 
Groundwater Monitoring
 
On February 17, 1994, the Agency noted Jersey Sanitation had not yet provided the
Agency with sampling procedures and detection monitoring methods required by its 1992
permit. Parties Exh. 31. On November 19, 1998, the Agency noted that Jersey Sanitation had
not submitted a narrative demonstration that the revised groundwater monitoring program is
adequate. Nor had Jersey Sanitation submitted sampling procedures and detection monitoring
methods to the Agency as required by the permit. Parties Exh. 40. The Agency’s November 19,
1998 inspection report states G103 is not hydraulically upgradient of the site and is not
1
Illinois Environmental Protection Agency designations are in parentheses.

 
 
7
monitoring the same geologic zone as the downgradient wells.
Id
. Further, well G102, a well
not included in Jersey Sanitation’s approved monitoring plan, was not properly abandoned and
plugged.
Id
. On June 6, 2000, an Agency inspector stated Jersey Sanitation must submit a
groundwater evaluation including established background confidence limits to concentration
levels of these parameters, a historical trend analysis of the data, groundwater flow maps over
the last four consecutive monitoring quarters, and if necessary, an assessment monitoring plan in
accordance with special condition 8(b) of Attachment A of Jersey Sanitation’s 1992 permit.
Parties Exh. 43. Groundwater monitoring violations were also observed on May 17, 2002.
Parties Exh. 47.
 
Leachate Control
 
During January 23, 1991 and May 21, 1991 inspections, Mr. Johnson saw leachate seeps,
flows, and ponds on the north and west sides of the landfill. Parties Exh. 10 and 18. On
January 23, 1991, Jersey Sanitation described seeing some liquid leaving a rusty-colored deposit
and having a slight sulfur odor. Mr. Johnson determined the liquid was in contact with waste
and was, therefore, leachate. At the May 21, 1991 inspection, Mr. Johnson saw black leachate
seeps that became flows and pooled in areas on the north side of the site. Parties Exh. 18 at 5. A
separate area of exposed refuse showed leachate seeps flowing into a pond that was brown and
olive in appearance. Small frogs were nearby and jumped into the leachate ponds when
Inspector Johnson approached.
Id
. Above-ground leachate seeps were also observed on
November 19, 1991, February 25, 1992, February 17, 1994, and June 6, 2000. Parties Exh. 21,
25, 31, and 43.
 
Agency inspectors found leachate flow leaving the boundaries of the landfill and entering
nearby Sandy Creek on four occasions: January 23, 1991, May 21, 1991, February 17, 1994, and
June 6, 2000. Parties Exh. 10, 18, 31, and 43.
 
Erosion and Above Ground Water Control
 
May 21, 1991 and November 19, 1998 inspection reports show that the landfill operation
and filled areas were not adequately protected from runoff along the north boundary of the
ravine. Parties Exh. 18 and 40. On February 17, 1994, Inspector King noted “hundreds of
erosion crevices on the slopes of the filled areas.” Parties Exh. 31. That same day, Mr. King
saw “numerous runoff streams in the hundreds of crevices on the north side of the filled area.”
Id
. On June 6, 2000, Mr. King observed ponded water in marsh-like conditions near the south
center of the landfill. Parties Exh. 42.
 
Permit Requirements
 
Hours of Operation.
On August 30, 1990, Mr. Johnson concluded from conversations
with landfill employees that Jersey Sanitation had been accepting refuse outside the permitted
hours of operation. Parties Exh. 7 at 10.
 
Elevation and Contour Limits.
Inspectors noted on several occasions that the elevation
of the landfill appeared higher than indicated by the permitted site plans in both the ravine and

 
 
8
the lift in the central region. Elevation and contour violations were observed on: May 21, 1991,
November 19, 1991, February 25, 1992, September 21, 1992, and January 21, 1994. Parties Exh.
18 at 3; Parties Exh. 21; 25; 27, and 31.
 
Financial Assurance.
Inspection reports allege Jersey Sanitation also had neither
submitted documentation of updated financial assurance nor revised cost estimates for closure
and post-closure care in accordance with its supplemental permits.
See
Parties Exh. 18, at 4,
Parties Exh. 21, 25, 31, 40, and 47.
 
Uncovered Refuse.
Mr. Johnson, along with Agency inspector Charlie King, inspected
the site again on November 19, 1991 saw bags of refuse on the bed of a small dump truck at the
site. The site operator said the refuse was received the previous evening. Parties Exh. 21 at 4.
Mr. Johnson noted bags of refuse again on February 25, 1992 and February 17, 1994. Parties
Exh. 25 and 31.
 
 
Well Maintenance.
On February 17, 1994, Mr. King’s report noted that the cover of
monitoring well G104 was unlocked and the monitoring well designations were not clearly
identified. Parties Exh. 31. On November 19, 1998, well G106 was not properly marked.
Parties Exh. 40.
  
Open Burning and Presence of Landscape Waste
 
Agency inspectors first observed landscape waste, consisting of leaves and tree clippings,
and the burning of landscape waste at the Jersey Sanitation landfill on August 30, 1990. Parties
Exh. 7. On January 23, 1991, south of the equipment shed, Mr. Johnson observed piles of
landscape waste, composed of tree and shrub trimmings and bags of leaves. Parties Exh. 10 at 3.
 
In response to the previous inspection when Mr. Johnson informed Mrs. Shourd of the
need for a supplemental permit to conduct a composting operation, Mrs. Shourd wrote a letter to
the Agency stating that the compost was not located within the landfill boundaries. In his report,
Inspector Johnson stated that drawings of the landfill show the landscape waste is located within
the landfill boundaries. He also told Mrs. Shourd that the landfill required a supplemental permit
in order to conduct any composting operation. Parties Exh. 10 at 3.
 
Landscape waste was also observed on May 21, 1991 (Parties Exh. 18 at 2) and
November 19, 1991 (Parties Exh. 21). Agency Inspector Johnson observed a single pile of
landscape waste remaining on February 25, 1992, and was informed by the site’s chief operator,
Mr. Laird, that no new landscape waste had been accepted since the last inspection. Parties Exh.
25.
 
Status of Landfill Cover
 
On many occasions, beginning with the August 30, 1990 inspection, Agency inspectors
observed large areas of uncovered and inadequately covered refuse in the permitted landfill.
Parties Exh. 7. On January 23, 1991, Inspector Johnson observed inadequate spreading and
compacting of refuse, uncovered refuse, inadequate depth of daily cover, and failure to collect

 
 
9
and contain litter from the site at the end of the day. Parties Exh. 10. Mr. Johnson stated he saw
a “large exposed face of refuse” covering an area about 413 feet long and varying from about 46
feet to 170 feet wide.
Id
. at 6. Inadequate cover was also recorded on May 21, 1991,
November 19, 1991, February 25, 1992, and February 17, 1994. Parties Exh. 18 at 4; Parties
Exh. 21 at 5; Parties Exh. 25; and 31.
 
No exposed refuse was observed on November 19, 1998. Parties Exh. 40. Then again at
a June 6, 2000 inspection, the inspector observed cracks in the final cover. Parties Exh. 43.
 
Closure Requirements
 
The purpose of the September 21, 1992 inspection was to determine whether Jersey
Sanitation had discontinued disposal at the site and initiated closure at the end of business on
September 18, 1992 as set forth in the site’s closure and post-closure plans. Parties Exh. 27. Mr.
Conlon observed that the site appeared closed for business. In his report, Mr. Conlon noted,
however, that onsite waste was deposited outside of landfill boundaries. The elevation of the
waste still appeared above permitted landfill boundaries, although by the date of the inspection,
Jersey Sanitation indicated it had applied for siting approval and intended to seek a permit for the
extended elevations.
Id
.
 
The site, with the existing final contours, received siting approval from the Jersey County
Board on March 8, 1999. Parties Exh. 41. Even after Jersey Sanitation received siting approval
for the increases in elevation and contours, the site was again observed to be out of compliance
with those limits at the May 17, 2002 inspection. Parties Exh. 47.
 
On several occasions, inspectors noted that Jersey Sanitation failed to take necessary
action to abate gas problems or file a description of the site, both requirements of Jersey
Sanitation’s closure plan.
See
Parties Exh. 31, 43.
 
Chief Operator
 
After conversing with officers of the Jersey Sanitation landfill at a January 23, 1991
inspection, Mr. Johnson discovered that the previous operators with prior conduct certification
were terminated or had quit, and a chief operator had not been officially named for the site.
Parties Exh. 10. Mr. Johnson’s report stated that those actually operating the permit did not have
prior conduct certification. Parties Exh. 10 at 7.
 
PRELIMINARY MATTERS
 
Motion for Sanctions
 
On September 9, 2004, the People moved for sanctions and requested that the Board
close the record because Jersey Sanitation had not yet filed a post-hearing brief . The People
asserted that the deadline for Jersey Sanitation to file its post-hearing brief was August 2, 2004,
and Jersey Sanitation had not yet requested an extension nor filed a brief. The complainant
claims it was prejudiced by the delay because it “will now be forced to re-familiarize itself, once

 
 
10
again, after the passage of the time, with the extensive record that exists in this matter, including
all facts and arguments.”
 
Jersey Sanitation responded, after the expiration of the response time with permission
from the hearing officer, on October 8, 2004. In response, Jersey Sanitation opposed the motion
for sanctions raising all of the previous delays in this proceeding. Specifically, Jersey Sanitation
noted that the People filed their 138-page post-hearing brief five weeks late. In addition to the
extreme length of the People’s post-hearing brief, Jersey Sanitation contends that emergencies
have arisen and other projects have interfered with the counsel for the respondent meeting the
post-hearing deadline. Accordingly, Jersey Sanitation requested that the Board not impose
sanctions and allow Jersey Sanitation until October 22, 2004, to file a brief. The hearing officer
granted Jersey Sanitation until October 22, 2004, to file a post-hearing brief in a hearing officer
order dated October 15, 2004.
 
The People moved for leave to reply, accompanied by a reply, on October 19, 2004. The
complainant restated it was significantly prejudiced by Jersey Sanitation’s delay throughout this
proceeding. The complainant disagrees that it was responsible for the delays cited by Jersey
Sanitation in this proceeding stating “Complainant is not responsible for one hour, one minute,
not even one second of Respondent’s delay.”
 
The Board’s procedural rules allow for sanctions for unreasonable failure to comply with
procedural rules, board orders or hearing officer orders. 35 Ill. Adm. Code 101.800. In
determining what sanction to impose, if any, the Board must consider factors such asthe past
history of the proceeding, the degree to which the proceeding has been delayed or prejudiced,
and the existence or absence of bad faith on the part of the offending party. 35 Ill. Adm. Code
101.800(c). After considering these factors, the Board finds no sanctions are warranted. The
People filed the complaint in this matter on July 8, 1996, and to date, both parties have caused
delays in the proceeding. The Board finds that in this case, Jersey Sanitation did not ask for an
extension in bad faith, and that a two-month delay is not prejudicial in a matter that has been on-
going for over eight years. The Board denies the People’s motion for sanctions.
 
Procedural Objections at Hearing
 
The People’s Objections
 
Objection to Continuance of Hearing.
At hearing, the People presented an assemblage
of available groundwater sample results compiled by the People’s expert Mrs. Nelson.
See
 
Parties Exh. 16. Jersey Sanitation argued the information was new and asked that the hearing be
continued at a later date allowing Jersey Sanitation time to review and respond to the
information. The hearing officer continued the hearing and reconvened it on October 17, 2003.
The People argue that none of the information was unfamiliar to Jersey Sanitation and, therefore,
objects to the hearing being continued to October 17, 2003. AG Br. at 7-8.
 
Objection to Late Disclosure of Witnesses.
Jersey Sanitation disclosed two new
witnesses the day before the continued hearing began on October 17, 2004. At the beginning of
the hearing on October 17, 2004, the People objected to the late disclosure.
See
Tr. at 219-20.

 
 
11
The hearing officer postponed the continuance to allow time for the People to depose the new
witnesses. The People renew the objection in their closing brief. AG Br. at 9.
 
 
  
Objection to Surrebuttal Testimony of Respondent’s Witness.
Near the conclusion of
hearing on January 13, 2004, the hearing officer allowed Jersey Sanitation to call Mr. Brad
Hunsberger to provide a surrebuttal in response to rebuttal testimony presented by Mrs. Nelson.
In support of its request for a surrebuttal, Jersey Sanitation argued that Mrs. Nelson’s testimony
contained new opinions and conclusions. AG Br. at 12. The People argue that as the party
having the burden of proof, the complainant is allowed rebuttal testimony, not the respondent.
Id
. The People objected to Jersey Sanitation calling a surrebuttal witness at hearing and renew
the motion in their closing brief. AG Br. at 11.
 
Jersey Sanitation’s Response
 
Jersey Sanitation contends that by maintaining the objections raised at hearing, the
People are “elevating these matters into a sideshow, probably in order to deflect attention from
weakness of Complainant’s groundwater case.” Jersey Br. at 18. Jersey Sanitation contends, in
turn, that it was predjudiced by receiving the groundwater sample results (Parties Exhibit 16,
drafted by Mrs. Nelson) four days before the beginning of the September 2003 hearings.
Id
. at
19. Rather than move to bar the document, Jersey Sanitation contends it sought more time to
respond to the new information.
Id
. at 20.
 
Further, Jersey Sanitation contends that at the hearing in January 2004, Jersey Sanitation
only sought to present surrebuttal because Mrs. Nelson raised a new opinion in her testimony.
Specifically, Jersey Sanitation refers to Mrs. Nelson’s opinion that the groundwater monitoring
wells were improperly located in a sand seam. Jersey Br. at 21; citing 2004 Tr. at 84-85. Jersey
Sanitation argues that the contested hearing officer’s rulings contested were all proper.
 
Board Analysis
 
The Board finds neither party was prejudiced by the contested hearing officer’s rulings.
The People had the opportunity to depose and cross-examine the witnesses presented by Jersey
Sanitation. Accordingly, no material prejudice resulted from calling Mr. Liss and Mr.
Hunsberger as witnesses. Further, the Board finds no prejudice resulted from Mr. Hunsberger’s
surrebuttal, as his brief surrebuttal responded directly to two opinions given by Mrs. Nelson.
The Board affirms the hearing officer’s rulings.
 
Previously Adjudicated Violations
 
Jersey Sanitation’s Arguments
 
Jersey Sanitation argues that the People cannot seek enforcement of violations in this
proceeding alleged in inspection reports that were already used to prosecute prior administrative
citations. Jersey Sanitation contends that as a matter of law the People cannot proceed both on
the basis of administrative citation and straight enforcement. Jersey Br. at 9.
 

 
 
12
People’s Arguments
 
The People contend they are not seeking relief for the alleged violation of Section
21(o)(2), “leachate flows entering waters of the State,” observed in the January 23, 1991
inspection report.
See
415 ILCS 5/21(o)(2) (2002). The People assert that the Agency already
pursued enforcement of that violation by administrative citation, docketed as AC 91-10. In the
same administrative citation, the Agency inspector observed an alleged violation of uncovered
refuse. The People note that Jersey Sanitation did not petition the Board for review. By default
order, this Board assessed the statutory civil penalty.
 
As discussed above, Jersey Sanitation did not file a petition for review and paid the
statutory penalty on April 29, 1991. The People claim they are not seeking relief for either
allegation, rather they reference the violations as evidence that subsequent similar violations are
ongoing and repeated.
 
The People argue there is nothing that prohibits them from enforcing the other violations
of Section 21 cited in the January 23, 1991 inspection report that have not yet been adjudicated.
Other observed violations in the report include: failure to comply with permit conditions,
inadequate spreading and compacting of refuse, failure to collect and contain litter at the end of
the operating day, causing water pollution, and inadequate measures to monitor and control
leachate. In support of this argument, the People cite Section 31.1(a) of the Act, in pertinent
part:
 
(a) The prohibitions specified in subsection (o) and (p) of Section 21 of this
Act shall be enforceable either by administrative citation under this
Section or as otherwise provided by this Act.
 
Board Discussion
 
The Board finds that the Agency can properly pursue enforcement of any alleged
violations observed in the 1991 inspection report that have not been included in any prior
administrative citation. Administrative citations differ from Section 31 enforcement actions in
several respects. Section 31.1(b) of the Act provides that an administrative citation must be filed
within 60 days of an inspection. However, there is no time limit on filing a formal enforcement
proceeding under Section 31. Statutory penalties for administrative citations
 
are set in the Act,
and the Board has no leeway to consider mitigating or aggravating factors in determining penalty
amounts as it does in Section 31 actions.
See
415 ILCS 5.42(b)(4-5) (2002). The administrative
citation process is designed for prompt and efficient enforcement of “direct observation” of a
limited group of violations specified in Section 31(a) of the Act.
See
IEPA v. Wright, AC 89-
227, slip op. at 8 (Aug. 30, 1990). The formal enforcement process is designed to cover all
provisions of the Act and Board rules and is lengthier and more legally complex.
Id
.
 
In the past, the Board has held that Section 31.1(a) prevents the use of both a formal
enforcement action and the administrative citation process for the same violation. Tazewell
County and IEPA v. Zimmerman and Waste Ltd., Inc., AC 90-40 (Dec. 20, 1990); citing IEPA v.
Blackwell, AC 90-27 (Dec. 20, 1990). However, here, the People do not claim to enforce the

 
 
13
same provisions of the Act and Board regulations that have already been resolved by
administrative citation. Accordingly, the Board finds that the People are not barred from
enforcing alleged violations in an inspection report different than violations in the same report
that have already been the subject of a prior administrative citation.
 
NO LONGER CONTESTED COUNTS
 
Alleged Violations Struck by Board’s Partial Summary Judgment Order
 
As discussed above, the Board granted partial summary judgment in favor of Jersey
Sanitation on April 4, 2002. Before discussing the alleged violations struck by summary
judgment, below the Board sets forth the background for the Board’s decision, which was based
on the related permit appeal.
 
Background
 
In a related permit appeal, Jersey Sanitation appealed several conditions of its 1999
supplemental permit (No. 1999-209-SP). On June 1, 2001, the Board granted summary
judgment in favor of Jersey Sanitation, finding that the contested conditions were unnecessary.
Jersey Sanitation Corp. v. IEPA, PCB 00-82 (Jun. 21, 2001). Specifically, the Board directed the
Agency to strike supplemental permit conditions A.4, B.6, C.1 through C.4, and C.8. Parties
Exh. 44. Conditions B.6 and C.1 through C.4 all dealt with groundwater monitoring and analysis
requirements. The Board found that Jersey Sanitation’s own plan for monitoring was sufficient.
Jersey, PCB 00-82, slip op. at 12-14. The Board found that those conditions were unnecessary to
accomplish the purposes of the Act and the Board’s regulations.
 
Condition A.4 of Jersey Sanitation’s 1992 supplemental permit requires that the person
responsible for post-closure care at a sanitary landfill have a valid prior conduct certification.
Generally, a facility operating under Part 807 of the Board’s rules must have a chief operator
with a prior-conduct certification. The Board found that Jersey Sanitation had ceased day-to-day
operations since the landfill had received a certificate of closure and was in post-closure care.
Thus, Jersey Sanitation was not required to have a chief operator as defined by Part 745, and
Condition A.4 was unnecessary. Jersey Sanitation Corp., PCB 00-82,
 
slip op. at 7, 9.
 
The Agency appealed and the appellate court affirmed the Board’s decision. IEPA v.
Jersey Sanitation Corp., 336 Ill. App. 3d 582, 784 N.E.2d 867 (4th Dist. 2003).
 
Summary Judgment Granted in Favor of Jersey Sanitation Regarding Groundwater
Monitoring and Analysis Issues and Chief Operator Certification
 
In this enforcement proceeding, Jersey Sanitation moved the Board for partial summary
judgment in its favor urging the Board to find that supplemental permit conditions A.4, and C.2
through C.4 are not, and never were, applicable. The Board granted Jersey Sanitation’s motion
for partial summary judgment, finding that “Jersey did not violate the stricken conditions A.4.,
C.2., C.3., and C.4. of its Supplemental Permit No. 1999-209-SP.” People v. Jersey Sanitation
Corp., PCB 97-2 (Apr. 4, 2002). The Board also granted Jersey Sanitation summary judgment

 
 
14
on the alleged violations of the Act and the Board’s regulations related to the alleged permit
violations: Sections 21(d)(1), 21(d)(2), 22.17(a) and 22.17(b) of the Act; and 35 Ill. Adm. Code
745.181 and 745.201. The stricken conditions and related alleged violations of the Act and
Board’s regulations are found in two counts (IV(D) and IX) of the second amended complaint.
The People concede that the section of counts IV and count IX in its entirety are no longer at
issue in this matter and did not address them in their closing briefs. AG Br. at 6-7.
 
Violations Jersey Sanitation Concedes it Committed
 
In its post-hearing brief, Jersey Sanitation concedes several of the alleged violations.
Jersey Sanitation admits that it committed the violations alleged in count II, count III, and the
count IV allegations that Jersey Sanitation failed to maintain surface water ditches on the north
and south sides of the landfill and kept the facility open outside the site’s permitted hours of
operation (special conditions 22 and 24 of Jersey Sanitation’s 1989 supplemental permit). Jersey
Sanitation also admits to count IV allegations that it failed to monitor and sample in accordance
with the facility’s groundwater monitoring program and failed to provide adequate final cover on
the landfill (special conditions A.3, A.4, and B.6 of Jersey Sanitation’s 1992 permit). Jersey
Sanitation further concedes the daily cover and financial assurance violations in count V and VI.
Below the Board summarizes and finds each of the conceded violations.
 
Count II: Admitted Failure to Monitor and Control Leachate
 
In count II of the complaint, the People allege that Jersey Sanitation failed to install and
maintain controls at the landfill sufficient to prevent and control leachate seeps and flows. 2nd
Am. Compl. at 9-12. Jersey Sanitation concedes that it failed to monitor and control leachate at
the Jersey Sanitation Landfill, in violation of Section 807.314 of the Board’s solid waste rules, as
alleged in the complaint. 35 Ill. Adm. Code 807.314(e). In their post-hearing reply, the People
note that Section I of the complaint alleges seven instances of violations, and that the violations
alleging the discharge of leachate onto the surface of the landfill and into the waters of the State
so as to cause water pollution were repeat violations. AG Reply at 6. The People further state
that Section J alleges six instances of four violations each; therefore, five of the observations
constitute repeat violations.
Id
. Because Jersey Sanitation concedes to the allegations and they
are supported by the record, the Board finds that Jeresy failed to control and monitor leachate at
the site.
 
Count III: Admitted Presence of Refuse in Flowing Water
 
The People allege that refuse was present in flowing water at the Jersey Sanitation
landfill during an inspection on February 17, 1994. Jersey Sanitation admits the alleged
violations of Sections 12(a) and (d) and 21(o)(1) of the Act, and the Board finds the violations.
415 ILCS 5/12(a), (d), and 21(o)(1) (2002).
 
Count IV: Admitted Violation of Permit Requirements
 
In this count, the People allege violations of various special conditions of its 1989 and
1992 supplemental permits. 2nd Am. Compl. at 14-28. Jersey Sanitation concedes that it

 
 
15
violated a permit condition concerning the landfill’s elevation and contours as alleged in the
amended count IV. According to condition 3 of Jersey Sanitation’s 1989 permit, there shall be
no deviations from the approved plans and specifications. Engineers for Jersey Sanitation
submitted the plans for elevation and contours to the Agency on July 18, 1989. Jersey Sanitation
concedes that it failed to adequately maintain water ditches and violated permit conditions
regarding the hours of operation (conditions 22 and 24 of Jersey Sanitation’s 1989 supplemental
permit). Jersey Sanitation also admits that it failed to monitor and sample in accordance with the
facility’s groundwater monitoring program and failed to provide adequate cover (conditions A.3,
A.4, and B.6 of Jersey Sanitation’s 1992 supplemental permit).
 
Section 807.301 of the Board’s solid waste rules requires any operator of a sanitary
landfill to comply with all applicable Board regulations (35 Ill. Adm. Code 807.301), and
Section 807.302 requires compliance with all conditions and provisions of each permit (35 Ill.
Adm. Code 807.302). Sections 21(d)(1) and (2) and 21(e) of the Act also require compliance
with all permit conditions, the Act, and any applicable Board regulations. Here the Board finds
that Jersey Sanitation violated the three conditions of its 1989 permit and three conditions of its
1992 permit as discussed above. As a result, the Board also finds Jersey Sanitation violated
Sections 21(d)(1) and (2) and Section 21(e), and Sections 807.301 and 302 of the Board’s
regulations. 415 ILCS 5/21(d)(1), (2), 21(e) (2002); 35 Ill. Adm. Code 807.301, 807.302.
 
Count V: Admitted Failure to Provide Adequate Cover
 
Jersey Sanitation concedes the violations of Section 21(o)(5) of the Act and Section
807.305 of the Board’s solid waste rules regarding cover alleged in count V. Jersey Br. at 8; 415
ILCS 5/21(o)(5) (2002); 35 Ill. Adm. Code 807.305. Count V alleges that Jersey Sanitation
failed to place a compacted layer of six inches of cover on exposed refuse at the end of the
operating day at four different inspections. AG Reply at 6. Accordingly, the Board finds the
violations alleged in count V.
 
Count VI: Admitted Failure to Meet Financial Assurance Requirements
 
Jersey Sanitation concedes that it failed to meet financial assurance requirements as
alleged in count VI. In count VI, the People allege violations of Section 21.1 of the Act and
Section 807.601(a) and (b) of the Board regulations. 415 ILCS 5/21.1(a) (2002); 35 Ill. Adm.
Code 807.601(a), (b). The People note that Jersey Sanitation concedes to violating various
permit conditions, Sections 21(d) and 21.1(a) of the Act, and Section 807.601 of the Board’s
regulations for a total of 2,093 days by failing to maintain financial assurance in an amount equal
to its current cost estimate for closure and post-closure. In Jersey Sanitation’s 1992-350-SP
permit, condition B.3 requires that financial assurance be fully funded. Condition 6.4 requires
that the landfill provide documentation of its financial assurance funding within 90 days of the
date of the permit. Condition 6.5 required Jersey Sanitation to submit biennial cost estimates for
closure and post-closure care by March 16, 1993. Jersey Sanitation did not submit a biennial
cost estimate until October 5, 1999, when it was approved and included in its 1999 supplemental
permit. Jersey Sanitation has not submitted a revised cost estimate since that date. AG Reply at
7. Here, the Board finds the violations alleged in count VI.
 
DISCUSSION

 
 
16
 
After the Board’s April 4, 2002 granting of summary judgment in favor of Jersey
Sanitation and the Board’s findings on the violations that Jersey Sanitation admits in its post-
hearing brief, the Board will analyze and make a determination on each of the remaining
contested counts below. The violations remaining are those found in count I, count IV, count
VII, and count VIII.
 
Burden of Proof
 
Section 31(e) states the burden of proof applicable to enforcement proceedings before the
Board:
 
In hearings before the Board under this Title the burden shall be on the Agency or
other complainant to show either that the respondent has caused or threatened to
cause air or water pollution or that the respondent has violated or threatens to
violate any provision of this Act or rule or regulation of the Board or permit or
term or condition thereof. 415 ILCS 5/31(e) (2002).
 
In order to prevail in an enforcement case before the Board, the complainant must prove
by a preponderance of the evidence that the respondents have committed the violations alleged
in the complaint. Village of South Elgin v. Waste Management of Illinois, Inc., PCB 03-106
(Feb. 20, 2003); citing People v. Fosnock, PCB 41-1, slip op. at 19 (Sept. 15, 1994). A
proposition is proved by a preponderance of the evidence when it is more probably true than not.
Village of South Elgin, slip op at 19; citing Nelson v. Kane County Forest Preserve, PCB 94-244
(July 18, 1996).
 
Count I: Alleged Groundwater Quality Violations – Arsenic, Iron, TDS, and Lead
  
Applicable Law
 
Sections 12(a) and (d) provide in part:
 
No person shall:
 
(a) Cause or threaten or allow the discharge of any contaminants into
the environment in any State so as to cause or tend to cause water
pollution in Illinois, either alone or in combination with matter
from other sources, or so as to violate regulations or standards
adopted by the Pollution Control Board under this Act.
 
(d) Deposit any contaminants upon the land in such place and manner
so as to create a water pollution hazard.
 
Section 807.313 of the Board’s solid waste regulations prohibits causing,
threatening, or allowing water pollution at a sanitary landfill. 35 Ill. Adm. Code 807.313.
Section 807.315 requires any person applying to operate a sanitary landfill must prove to

 
 
17
the Agency that no damage or hazard will result to the waters of the State because of the
development and operation of the landfill. 35 Ill. Adm. Code 807.315.
 
Section 620.115 of the Board’s regulations requires compliance with all applicable
groundwater regulations (35 Ill. Adm. Code 620.115), and
 
Section 620.405 prohibits the
violation of specific groundwater quality standards (35 Ill. Adm. Code 620.405).
 
Section 620.420 of the Board’s regulations sets forth the specific Class II groundwater
quality standards:
 
a) Inorganic Chemical Constituents
 
1) Except due to natural causes or as provided in Section 620.450 or
subsection (a)(3) or (d) of this Section, concentrations of the
following chemical constituents must not be exceeded in Class II
groundwater:
 
Constituent
Standard
  
(mg/L)
Arsenic
0.2
 
  
  
 
2) Except as provided in Section 620.450 or subsection (a)(3) or (d)
of this Section, concentrations of the following chemical
constituents must not be exceeded in Class II groundwater:
 
Constituent
Standard
(mg/L)
Iron
5.0
 
Total Dissolved Solids
  
(TDS)
1,200.0
Sulfate
400.0
* * *
d) pH
Except due to natural causes, a pH range of 6.5 - 9.0 units must not be
exceeded in Class II groundwater that is within 5 feet of the land surface.
 
People’s Arguments
 
The People assert that samples collected at the site demonstrate that Jersey Sanitation
caused violations of the Board’s groundwater quality standards. To establish proof of causation
that Jersey Sanitation has contaminated the underlying groundwater, the People state that
samples taken in upgradient wells show no exceedences of the Class II groundwater standards
while results from downgradient wells do. AG Br. at 13; citing Parties Exh. 34; Tr. at 300-02.
The People further contend that the level of exceedence has increased over time, and other

 
18
contaminants found by the sampling results, for example, organics, are those commonly found in
landfill waste.
Id
.; citing Parties Exh. 34; Tr. at 256.
 
Specifically, the People allege violations of Class II groundwater standards for arsenic,
iron, total dissolved solids, and sulfate. AG Br. at 14. The People contend the arsenic and iron
violations were documented in 2000 at the G104 well. Also at well G104, tests have shown
exceedences of dissolved sulfate concentrations since 1990. AG Br. at 14. Dissolved chloride
concentrations at G104 exceeded groundwater standards at the 2003 sampling. AG Br. at 14;
Compl. Exh. 16, 20. At hearing, Mrs. Nelson testified that the exceedences are increasing in
magnitude, and concentrations of iron detected at well G105 are at a concentration level higher
that she has ever seen at a landfill. AG Br. at 15.
 
The People contend that evidence admitted at hearing and contained in the record
demonstrates that Jersey Sanitation had information that indicated it should implement controls
and practices to address leachate, drainage and gas. The People further assert Jersey Sanitation
failed to install and maintain those controls, and as a result, allowed leachate accumulations, gas
releases and drainage problems to occur at the landfill and continue to cause, threaten or allow
water pollution. AG Br. at 27.
 
Next the People argue that geologists for both parties, Mrs. Nelson and Mr. Hunsberger,
agree that because sample results showed no exceedences of the standards at well G103 or G102,
upgradient wells, background levels do not exceed the Class II standards for the purposes of the
monitoring program. AG Br. at 16; citing Tr. at 301, and Jan. 13, 2004, Tr. at 99-100.
 
An expert for the People explained that at landfills, there are two ways that contaminants
can enter the environment: through leachate or gas. AG Br. at 16. The People state the record
contains evidence that both gases and leachate have accumulated at the landfill causing seeps and
detectable odorous releases at a total of five inspections: Jan. 23, 1991; May 21, 1991; Nov. 19,
1991; Feb. 25, 1992; and Jan. 21 and Feb. 17, 2004. AG Br. at 17. Both inspectors Johnson and
King observed such releases.
Id
. Further, Mrs. Nelson observed leachate seeps and flows on
several occasions in May 1994 when she performed a groundwater analysis at the site. AG Br. at
18.
 
The People also cite three occasions where Agency inspectors observed leachate seeps
flowing into Sandy Creek, an off-site creek to the west of the landfill. AG Br. at 27.
 
The People further cite to Illinois caselaw in support of their groundwater claims. People
v. ESG Watts. Inc., PCB 96-107 (Feb. 5, 1998) (ESG Watts I). The People note that in ESG
Watts I, monitoring results showed exceedences of Class II standards for sulfate, iron and
manganese standards. The monitoring results demonstrated that the concentrations of those
contaminants were significantly higher in the downgradient wells. The People argued that
contamination found in the wells was a result of releases from the landfill. AG Br. at 29. ESG
Watts argued that all three contaminants were naturally occurring and that even concentrations of
iron upgradient exceeded regulatory limits. The Board concluded that groundwater monitoring
data showed that the landfill caused the exceedences of the Board’s groundwater quality
standards. AG Br. at 29; citing ESG Watts I, slip op. at 34. In ESG Watts, the People alleged

 
19
violations of Class I groundwater standards, but not of Class II standards. The Board held that
the People failed to prove Class I violations and did not allege violations of Class II standards.
The Board did, however, find violations of the general nondegradation provisions and general
groundwater quality standards.
 
For further support, the People cite to another case involving ESG Watts. People v. ESG
Watts, PCB 96-233 (Feb. 5, 1998) (ESG Watts II). The People claim that in ESG Watts II, the
Board held that ESG Watts operated its landfill in a manner that constituted a threat to the waters
of the State. The People contend the Board made this finding because ESG Watts failed to
install monitoring equipment, monitor groundwater beneath the landfill and submit monitoring
reports. The Board refused to find that the landfill actually caused the exceedences of organic
contaminants in the monitoring results because the results showed exceedences in upgradient as
well as downgradient wells.
 
Consistent with the decision in ESG Watts I, the People contend the exceedences of
groundwater quality standards in turn constitute violations of Section 12(a) and Section 620.115
and 620.405 of the Board’s regulations. The People assert that the alleged groundwater
contamination has impaired resource groundwater in violation of Section 620.301 of the Board’s
groundwater quality standards. AG Br. at 38. The People also assert that by causing or allowing
the contamination, as alleged, Jersey Sanitation created a water pollution hazard in violation of
Section 12(d). AG Br. at 38-39. In alleging each of the violations, the People emphasize that
Jersey Sanitation knew of the need to control and maintain the landfill in order to avoid polluting
the environment and either failed to install controls or did not properly maintain them. AG Br. at
39.
 
The People further state that Jersey Sanitation’s 1992 permit required an evaluation of the
groundwater flow direction and the hydraulic gradients at the facility, an evaluation Jersey
Sanitation never performed. AG Br. at 44; citing Parties Exh. 30.
 
The People argue that Jersey Sanitation’s permit requires Jersey Sanitation to perform a
trend analysis and development of a groundwater assessment plan that will evaluate the
appropriateness of G103 as an upgradient well. AG Br. at 52. Both Mrs. Nelson’s 1994
groundwater monitoring assessment and a November 19, 1998 Agency inspection report opined
that well G103 is not an upgradient well. For example, Mrs. Nelson’s report stated “it appears
that G103 is not hydraulically upgradient of, and unaffected by the site and is not monitoring the
same geologic zone as the downgradient wells.” AG Br. at 44; citing Parties Exh. 34. Similarly,
the inspection report stated that “Monitoring Well G103 is not hydraulically upgradient of, and
unaffected by the site and is not monitoring the same geologic zone as the down gradient wells.”
AG Br. at 46; citing Parties Exh. 40.
 
Mrs. Nelson believes that well G102, a well on the site, screened at a shallower depth, but
not part of Jersey Sanitation’s approved groundwater monitoring plan, is a more appropriate
upgradient well. AG Br. at 52-53. Mrs. Nelson testified that samples from G102 showed no
exceedences of groundwater standards, but G103, while showing no exceedences of Class II
standards, did show exceedences of Class I standards. AG Br. at 57; citing Tr. at 257-58.
 

 
 
20
Mr. Hunsberger, on the other hand, opined at hearing that G103 is an appropriate
upgradient well because he believes a continuous permeable zone runs from that well uphill to
Sandy Creek. AG Br. at 59. In response, Mrs. Nelson distinguished her view of the geology of
the site. Mrs. Nelson states that the material present at G103 is different than that at the other
wells. Mrs. Nelson claims she could find no evidence that the zone monitored by G103 is
connected to the other wells, and concluded that G103 is isolated. AG Br. at 59-60.
 
Consistent with the decision in ESG Watts I, the People contend the exceedences of
groundwater quality standards in turn constitute a violation of Section 12(a) and Section 620.115
and 620.405. The People assert that the alleged groundwater contamination has impaired
resource groundwater in violation of Section 620.301 of the Board’s groundwater quality
standards. AG Br. at 38. The People also assert that by causing or allowing contamination, as
alleged, Jersey Sanitation caused a water pollution hazard in violation of Section 12(d). AG Br.
at 38-39. In alleging each of these violations, the People emphasize that Jersey Sanitation knew
of the need to control and maintain the landfill in order to avoid polluting the environment and
failed to install controls or did not properly maintain them. AG Br. at 39. The People conclude
that Jersey Sanitation has violated five groundwater provisions for over 12 years. AG Br. at 69.
 
Jersey Sanitation’s Arguments
 
According to Jersey Sanitation, nothing in the record proves that Jersey Sanitation caused
the exceedences. Jersey Sanitation argues that ESG Watts I is distinguishable from the facts at
hand because, unlike in ESG Watts I, here the Agency’s witnesses “could not and do not
establish that Jersey Sanitation was the source.” Jersey Br. at 12. Further, Jersey Sanitation
contends that the People have not met their burden of proof that the contamination must be from
Jersey Sanitation where their own witnesses acknowledge that such an inference does not exist.
Jersey Sanitation asserts that even the People’s witness, Mrs. Nelson, admitted that the iron
levels at issue could possibly have resulted from a source other than Jersey Sanitation Landfill.
Jersey Br. at 12; citing Tr. at 305-06. Jersey Sanitation further states that Mr. Liss opined there
appears to be no public health danger at the facility (Jersey Br. at 12; citing Tr. at 28-29) and that
Mrs. Munie, head of the Agency’s Bureau of Land Permit section, also acknowledged that she
did not have sufficient information to conclude that any constituent levels coming from Jersey
Sanitation’s groundwater monitoring system were a result of Jersey Sanitation’s activities.
Jersey Br. at 12; citing Tr. at 43, 45-46.
 
Next Jersey Sanitation argues that even if the Board concludes that Jersey Sanitation is
causing the alleged groundwater violations, its own permit application defines the next step of
investigation, which is not the groundwater evaluation protocol proposed by the Agency. Jersey
Br. at 14. Without arguing
res judicata
, Jersey Sanitation contends that the People’s primary
issue in this action concerns the groundwater monitoring program at Jersey Sanitation; a program
which, Jersey Sanitation contends, both the Board and appellate court found was sufficient for
compliance with Section 12 of the Act and Part 807 of the Board’s regulations. Jersey Br. at 10.
Jersey Sanitation argues that rather than considering whether constituent levels trigger further
analysis of groundwater, the proper consideration should be whether a trend is developing.
Jersey Br. at 14. If a trend is determined, Jersey Sanitation asserts only then it must perform
additional sampling and retain a professional engineering firm. Jersey Br. at 15.

 
 
21
 
People’s Reply
 
In response, the People contend that the trend analysis and potential groundwater
assessment they recommend in light of the exceedences of groundwater standards at the site are
standard practice. In support of this argument, the People contend that experts for both sides
recommend that Jersey Sanitation implement these practices at the landfill, and that Jersey
Sanitation’s permit calls for such implementation. AG Br. at 9.
 
Next, the People contend that whether the G103 monitoring well is an appropriate
upgradient well is a long-unanswered question. The People contend that it is not at all surprising
that the geologists and engineers made recommendations similar to the conditions that existed in
Jersey Sanitation’s permit, because they are practices that geologists and engineers customarily
use to address groundwater issues such as those that the People allege exist at the Jersey
Sanitation site. AG Br. at 10. The People contend they are merely asking the Board find that
the groundwater at the Jersey Sanitation site is exceeding standards, and, consequently, to issue
an order requiring Jersey Sanitation to comply with its permit by adhering to the language in its
permit that requires it to perform a trend analysis and then, based on those results, retain a
professional engineering firm to consider the next step. AG Br. at 11.
 
The People contend the record supports a finding of Section 12(a) and (d) violations, as
well as violations of Sections 807.313 and 315. AG Br. at 12, 13. The People further state the
exceedences have increased in magnitude over the years, but Jersey Sanitation has not performed
a single assessment of the groundwater at the site. AG Br. at 13.
 
Board Analysis Finding Violations as Alleged
 
Part 807 requires landfill operators to prove that they do not and will not affect the waters
of the State. 35 Ill. Adm. Code 807.313 and 807.315. Further, Jersey Sanitation’s permit
provides:
 
Groundwater monitoring results will be evaluated each quarter against
background data, General Use Water Quality Standards, and other historic water
analysis information. If a trend is believed to be developing, more frequent
sampling (e.g. monthly) may be performed to substantiate or dismiss the
likelihood of a site impact. A professional engineering firm should be retained to
develop future actions and/or plans for subsequent IEPA approval. Parties Exh.
41, Att. 5, at 4.
 
Jersey Sanitation’s groundwater monitoring results actually showed exceedences of Class
II standards. Regardless of whether “a trend is believed to be developing,” Jersey Sanitation is
under an obligation to retain a professional engineering firm to develop future actions or plans
for Agency approval. By failing to retain a professional engineering firm to develop future
actions and/or plans for Agency approval, the Board finds that Jersey Sanitation operated its
landfill in a manner that constitutes a threat to waters of the State. Jersey Sanitation therefore

 
 
22
violated Sections 12(a) and (d) of the Act and Sections 807.313 and 807.315 of the Board’s
regulations.
 
The People’s experts state that Jersey Sanitation Landfill is the cause of the
contamination found on site because downgradient wells show exceedences while upgradient
well show none. Experts for the People question whether well G103 is a proper upgradient well.
Mrs. Nelson, for example, believes that another well on site, G102, is a more appropriate
upgradient well. Mrs. Nelson’s sampling results from G102 also showed no groundwater quality
exceedences.
 
Jersey Sanitation’s experts maintain that G103 is a proper upgradient well, but assert that
the Agency cannot prove that Jersey Sanitation is the source of the contamination.
 
In summary, the Board finds that the Agency has shown by a preponderance of the
evidence that the Jersey Sanitation landfill caused the inorganic exceedences. Groundwater
sampling results from the site have shown violations of various Class II groundwater quality
standards for over 12 years. Sampling results from the well that Jersey Sanitation’s experts
maintain is hydrogeologically upgradient show no exceedences of Class II standards, while the
downgradient wells on site do. Jersey Sanitation has provided the Board with no evidence that
the landfill is not the source or that the contamination is coming from some other source.
Accordingly, the Board finds the alleged violations of Section 620.420, the Class II groundwater
quality standards. Accordingly, the Board also finds Jersey Sanitation violated Section 620.405,
which prohibits contaminating the groundwater so as to violate a specific groundwater quality
standard.
 
Count IV: Alleged Violations of Permit Requirements
 
Applicable Law
 
Sections 21(d)(1) and (2) and 21(e) provide:
 
No person shall:
 
(d) Conduct any waste storage, waste-treatment, or waste-disposal
operation:
 
(1)
without a permit granted by the Agency or in violation of
any conditions imposed by such permit . . .
 
(2) in violation of any regulations or standards adopted by the
Board under this Act.
***
(e) Dispose, treat, store or abandon any waste, or transport any waste
into this State for disposal, treatment, storage or abandonment,
except at a site or facility which meets the requirements of this Act
and of regulations and standards thereunder.

 
 
23
 
Section 807.301 of the solid waste regulations requires compliance with the Part 807
regulations when operating a sanitary landfill (35 Ill. Adm. Code 807.301), and Section 807.302
of the Board’s solid waste rules requires compliance with all conditions and provisions of each
permit (35 Ill. Adm. Code 807.302).
 
Section 807.524(a) of the Board’s solid waste regulations requires the operator of a waste
disposal site to implement the post-closure care plan once it receives a certification of closure
pursuant to Section 807.508. 35 Ill. Adm. Code 807.524(a).
 
Jersey Sanitation’s Arguments
 
As discussed above, Jersey Sanitation concedes that it in fact violated several permit
requirements. Jersey Sanitation concedes that it violated its permit condition limiting the
landfill’s elevation and contours as alleged in count IV of the second amended complaint.
Further, Jersey Sanitation concedes that it violated a permit condition requiring maintenance of
surface water ditches on the north and south sides of the landfill as well as hours of operating as
required by the permit.
 
However, according to Jersey Sanitation, the People cannot enforce permit conditions
that were struck from Jersey Sanitation’s 1999 supplemental permit in the related permit appeal,
PCB 00-82. Jersey Sanitation argues it is not bound by the permit conditions that the Board
found were unnecessary and struck from its 1999 permit. Jersey Br. at 6. Jersey Sanitation does
not specifically list the permit conditions, but references the Board’s June 21, 2001 order in the
related permit appeal striking permit conditions: A.4, B.6, C.1 through C.4, and C.8. Jersey Br.
at 6; citing Parties Exh. 44.
 
Further, Jersey Sanitation disputes allegations that it failed to conform its monitoring
wells as required by its permit; failed to provide a narrative analysis of the effectiveness of its
groundwater monitoring program; and failed to obtain a permit to conduct landscape waste
operations. Mrs. Shourd contends the composting was done only on farm property and not on
landfill property. Jersey Br. at 8.
 
People’s Arguments
 
In the remaining allegations of count IV, the People contend that by violating various
conditions and provisions of the landfill’s permits, Jersey Sanitation violated the general
prohibitions contained in Sections 807.301 and 807.302. The People respond that Jersey
Sanitation’s repeated reference to “the ‘stricken conditions’ is an argument manufactured to
divert attention from and aggravate Complainant’s efforts to meet its objective of obtaining
compliance at the subject facility.” AG Reply at 35.
 
 
Failure to Plug Well MW5.
First, the People contend, Jersey Sanitation has not
modified its groundwater monitoring wells according to the approved monitoring plan. AG Br.
at 14. The People assert that Jersey Sanitation has failed to plug well MW5. Further, contend
the People, well MW5 is not in the current monitoring plan and Jersey Sanitation has failed to

 
24
apply for a supplemental permit to modify the program in order to maintain the MW5 well. The
People allege Jersey Sanitation is in violation of special condition 13 of Jersey Sanitation’s 1989
permit, which in turn constitutes violations of Sections 21(d)(1) and (2) and Section 21(e), and
Sections 807.301 and 302 of the Board’s regulations. AG Reply at 15. The People state this
particular violation has continued for over 13 years.
Id
.
 
Failure to Submit Narrative Groundwater Report.
Second, the People allege that
Jersey Sanitation violated special condition 11(b) of its 1989 permit for approximately two years.
The People contend that Jersey Sanitation violated this condition by failing to submit a narrative
report analyzing the effectiveness of its groundwater monitoring program. AG Reply at 15. The
People claim this violation lasted 665 days. AG Reply at 16.
 
Landscape Waste Operations on Landfill Property.
The People allege Jersey
Sanitation violated Section 21(d)(1) of the Act by accepting landscape waste at the landfill site.
AG Br. at 95. The People contend that during the August 30, 1990 inspection, the Agency
inspector observed accumulations of landscape waste. According to the People, the effective
permit at the time of the inspection did not allow compost operations. The Agency inspector
observed landscape waste at the site on two more occasions: at January 23, 1991 and May 21,
1991 inspections. The People state that regardless of whether the landscape waste was within the
boundaries of the permitted landfill or outside the boundaries yet still on the property, Jersey
Sanitation was conducting an unpermitted activity. The People claim that if the observed
landscape waste was within the boundaries, it was a compost operation not permitted under the
then applicable permit. On the other hand, asserts the People, if the observed waste was outside
of the boundaries, it was a compost operation for which Jersey Sanitation should have obtained a
supplemental permit and did not. Either way, argue the People, Jersey Sanitation violated
Section 21(d)(1) by conducting an unpermitted waste disposal operation.
 
The People contest Jersey Sanitation’s argument that the landscape waste on its property
was not located within the boundaries of the landfill. In response to Mrs. Shourd’s allegations
that landscape waste was instead collected on adjacent farm property, the People contend that
upon receipt of those claims and re-inspection, inspector Johnson determined that the landscape
was in fact partially within the landfill boundaries. AG Resp. at 16. The People contend that
Agency inspectors observed landscape waste on the landfill site in August 1990, January 1991,
and again in May of 1991, over a period of ten months. AG Br. at 16-17. On each occasion,
claim the People, Jersey Sanitation was told it had to have a supplemental permit in order to
accept and maintain waste for composting. AG Br. at 17. The People state the first violation
was observed on August 30, 1990, and last observed on May 21, 1991, for a total of 263 days.
 
Failure to Lock Well G104.
Fourth, the People claim that Jersey Sanitation did not
dispute the allegation that Jersey Sanitation violated its 1992 permit by failing to lock monitoring
well G104 during the February 17, 1994 inspection. AG Reply at 18. Because Jersey Sanitation
failed to contest, argue the People, the Board should find that Jersey Sanitation failed to comply
with Item 10 of Attachment A to its 1992 permit.
Id
.
 
Continuing Violations of Groundwater Quality Standards.
Fifth, the People also
allege that Jersey Sanitation did not dispute the alleged violation of continuing exceedences of

 
 
25
groundwater standards at the landfill. The People allege that Jersey Sanitation violated special
conditions 5(a), 6(b), 8, 16, 20, 21, and 22 of its 1992 permit and that those exceedences have
been detected in sample results from the landfill since 1991. AG Reply at 19.
 
Failure to Take Corrective Action.
In the sixth permit violation allegation, the People
contend Jersey Sanitation violated special condition C.5 of its 1999 permit. The People allege
that during the June 6, 2000 inspection, Mr. King observed ponded and standing water, gas
releases and gas odors, crevices and rills, dead and stressed vegetation and a leachate pop-out.
Condition C.5 requires Jersey Sanitation to take corrective action if various problems such as
those described above occur during the post-closure care period.
See
Parties Exh. 42, at 4.
Again, the People note that Jersey Sanitation did not dispute these allegations in its post-hearing
brief and that they constitute violations of Sections 21(d)(1) and (2) and Section 22.17 of the Act
as well as Section 807.524(a) of the Board’s regulations. AG Reply at 19.
 
Board Analysis Finding Violations as Alleged
 
The only one of the remaining six permit violations that Jersey Sanitation contests is the
allegation that Jersey Sanitation conducted landscape waste operations on the permitted landfill
property. Mrs. Shourd, on behalf of Jersey Sanitation, does not dispute that it accepted and
composted landscape waste, but argues that the composting was conducted outside the permitted
boundaries of the landfill. Jersey Br. at 9. Mrs. Shourd does not offer any evidence in support.
Agency Inspector Johnson determined the composting was conducted on the permitted landfill
site by re-inspecting the site and reviewing documented drawings concerning the facility’s
permitted boundaries. Mr. Johnson determined from his research that the landscape waste was
stockpiled partially within the landfill boundaries. The Board finds the evidence in the record
shows that Jersey Sanitation violated section 21(d)(1) by conducting landscape waste operations
without a permit.
 
Although Jersey Sanitation does not concede the remaining violations, Jersey Sanitation
also does not contest the People’s allegations. In addition to the count IV violations found
above, the Board finds that Jersey Sanitation also violated the following permit conditions: (1)
special condition 13 of Jersey Sanitation’s 1989 permit; (2) special condition 11(b) of its 1989
permit; (3) Section 21(d)(1) by conducting an unpermitted waste disposal operation; (4) Item 10
of Attachment A to its 1992 permit; (5) special conditions 5(a), 6(b), 8, 16, 20, 21, and 22 of its
1992 permit; and (6) special condition C.5 of its 1999 permit. Accordingly, the Board also finds
that each permit violation in turn constitutes a violation of Sections 21(d)(1) and (2) and Section
22.17 of the Act as well as Section 807.524(a) of the Board’s regulations.
 
Count VII: Alleged Failure to Timely Complete Closure and Comply With Closure
Requirements
 
Applicable Law
 
Section 21(o)(6) of the Act provides:
 

 
 
26
(o) Conduct a sanitary landfill operation which is required to have a permit
under subsection (d) of this Section, in a manner which results in any of
the following conditions:
 
(6) failure to provide final cover within time limits established by
Board regulations;
 
Section 22.17 of the Act regarding post-closure care of sanitary landfills requires the
owner and operator of a sanitary landfill to monitor gas, water and settling at the completed site.
415 ILCS 5/22.17(a) (2002). Pursuant to subsection (b) of Section 22.17, a landfill owner or
operator must take whatever remedial action is necessary to abate any gas, water or settling
problems which appear during such period of time specified in subsection (a) . . . . 415 ILCS
5/22.17(b) (2002).
 
Section 807.305(c) of the Board’s solid waste regulations regarding landfill cover
provides:
 
Unless otherwise specifically provided by permit, the following cover
requirements shall be followed:
***
c) Final Cover - a compacted layer of not less than two feet of
suitable material shall be placed over the entire surface of each
portion of the final lift not later than 60 days following the
placement of refuse in the final lift, unless a different schedule has
been authorized in the Operating Permit.
 
Section 807.318(b) of the Board’s regulations regarding landfill closure
 
require
 
the owner
or operator to take whatever remedial action is necessary to abate any gas, water or settling
problems which that occur during the closure period. Upon closure, Section 807.318(c) requires
the owner or operator to file a detailed description of the site, including a plat, with the
appropriate county land recording authority for the county in which the site is located. 35 Ill.
Adm. Code 807.318(b), (c).
 
Section 807.502 of the Board’s landfill closure regulations requires the site operator to
close the site in a manner that “[m]inimizes the need for further maintenance,” and “[c]ontrols,
minimizes or eliminates post-closure release of waste, waste constituents, leachate, contaminated
rainfall, or waste decomposition products to the groundwater or surface waters or to the
atmosphere to the extent necessary to prevent threats to human health or the environment.” 35
Ill. Adm. Code 807.502.
 
People’s Arguments
 
In count VII, the People allege several violations of closure requirements. AG Br. at 114.
First, the People state that Jersey Sanitation did not submit final compaction test results as
required by both the1992 supplemental permit and the Board’s solid waste regulations in
violation of Section 807.508. Second, the People assert that Jersey Sanitation failed to timely

 
 
27
file a plat of the landfill with the Jersey County Recorder of Deeds as required by Section
807.318(c). AG Br. at 118. This violation was first noted during a February 17, 1994 inspection
and lasted until January 31, 1997.
 
Third, according to the People, Jersey Sanitation failed to establish and maintain final
cover at the landfill 60 days after ceasing to accept waste in violation of Sections 21(d)(1) and
(2) and 21(o)(6) of the Act and Section 807.305(c) of the Board’s regulations. The People state
that these violations first occurred, as documented in inspection reports, on December 1, 1992,
and lasted until October 5, 1999, for a total of 2,497 days. Fourth, the People allege that Jersey
Sanitation failed to take remedial action to abate gas after it stopped accepting waste in violation
of Section 807.318(b). Detections of the releases were first documented on November 18, 1998,
and lasted until June 6, 2000. Fifth, the People allege that Jersey Sanitation failed to close the
landfill in a way that adequately controlled post-closure releases to groundwater, surface water,
and the atmosphere in violation of Section 807.502. These violations continued from September
18, 1992 until October 5, 1999. AG Br. at 119.
 
Jersey Sanitation’s Arguments
 
In response, Jersey Sanitation contends that a letter issued by the Agency in 1999
certifying closure officially certified that the landfill had been closed in accordance with all
permit, regulatory, and statutory requirements as of September 30, 1994. Jersey Br. at 5; citing
Bradd v. IEPA, PCB 90-173 (May 9, 1991);
see also
35 Ill. Adm. Code 807.508. Accordingly,
the violations related to the conditions struck by the Board are not enforceable. Jersey Br. at 6.
 
People’s Reply
 
In reply, the People assert that Jersey Sanitation has not disputed these allegations at
hearing nor in its post-hearing brief. AG Reply at 20. First the People allege that Jersey
Sanitation violated Section 807.318(c) by failing to timely file a plat with the county recorder.
Second, the People assert Jersey Sanitation failed to establish and maintain final cover at the
landfill 60 days after ceasing to accept waste in violation of Section 21(d)(1) and (2) and
21(o)(6) of the Act and Section 807.305(c) of the Board’s regulations. Third, the People allege
Jersey Sanitation violated Section 807.318(b) for failing to abate gas after it stopped accepting
waste, and Section 807.502 of the Board’s regulations by failing to close the landfill in a manner
that adequately controlled post-closure releases to groundwater and surface waters and to the
atmosphere. AG Reply at 21.
 
Board Analysis Finding Violations as Alleged
 
Jersey Sanitation does not dispute the substance of the alleged violations of closure
requirements. Rather Jersey Sanitation sets forth the defense that its 1999 Agency-issued
certificate of closure certifies that the landfill has been closed in accordance with all permit,
regulatory and statutory requirements as of September 30, 1994. However, a certificate of
closure certifies only that the facility has been closed in accordance with the closure plan for the
facility, and does not provide the site with immunity from any alleged violations observed at the
facility since September 30, 1994. Accordingly, the Board finds that Jersey Sanitation violated

 
 
28
Sections 21(o)(6) and 22.17(a), (b) of the Act and Section 807.305(c) of the Board’s closure and
post-closure requirements as alleged in count VII of the complaint.
 
Count VIII: Open Burning and Air Pollution
 
Applicable Law
 
Section 9(a) and (c) of the Act provide:
 
No person shall:
 
(a) Cause or threaten or allow the discharge or emission of any
contaminant into the environment in any State so as to cause or
tend to cause air pollution in Illinois, either alone or in
combination with contaminants from other sources, or so as to
violate regulations or standards adopted by the Board under this
Act;
***
(c) Cause or allow the open burning of refuse, conduct any salvage
operation by open burning . . . . 415 ILCS 5/9(a), (c) (2002).
 
Section 21(o)(4) provides:
 
No person shall:
 
(o) Conduct a sanitary landfill operation which is required to have a
permit under subsection (d) of this Section, in a manner which
results in any of the following conditions:
 
(4) open burning of refuse in violation of Section 9 of this Act .
. . . 415 ILCS 5/21(o)(4) (2002).
 
Section 237.102 of the Board’s rules prohibits open burning:
 
a) No person shall cause or allow open burning, except as provided in
this Part.
 
b) No person shall cause or allow the burning of any refuse in any
chamber or apparatus, unless such chamber or apparatus is
designed for the purpose of disposing of the class of refuse being
burned.
 
People’s Arguments
 
The People cite to documentation by Inspector Johnson of smoldering wood debris,
boards, and landscape waste south of the landfill at the time of the inspection. AG Br. at 121.

 
 
29
The People allege that Jersey Sanitation violated Section 9(a) and (c) of the Act by causing air
pollution and open burning. Further, the People allege violations of Section 21(o)(4) of the Act
by operating a permitted sanitary landfill in a manner that results in the open burning of refuse.
Finally, the People allege a violation of Section 237.102 of the Board’s water pollution
regulations by causing or allowing open burning of a waste that is not exempt under the Board’s
regulations. AG Br. at 122.
 
Jersey Sanitation’s Arguments
 
Jersey Sanitation concedes in its post-hearing brief that burning occurred, but that it did
not occur on any part of the permitted landfill area. Rather, Jersey Sanitation maintains, the
landscape waste fire occurred on farm ground located next to the landfill. Jersey Br. at 8. Jersey
Sanitation contends that Mr. Johnson, the Agency inspector, has provided no basis for his belief
that the burning occurred within the boundaries of the permitted landfill. Jersey Sanitation
asserts that the Agency has the burden of proof to identify the location of the fire with respect to
the permitted landfill. Jersey Br. at 8.
 
People’s Arguments
 
In reply, the People argue that Mr. Johnson disagrees with Mrs. Shourd’s contention that
any burning occurred outside of the permitted landfill boundaries. As discussed above in
relation with the allegation of accepting compost waste on the permitted landfill, the People
allege that Mr. Johnson re-inspected the site after receiving Mrs. Shourd’s claims and determined
the landscape waste was at least partially within the landfill boundaries. AG Br. at 22. The
People contend the landfill operator at the time of the August 30, 1990 inspection could not
explain why the waste was burning, yet the operator was attempting to extinguish the waste by
covering it with soil.
Id
. Consequently, argue the People, the record supports the allegation that
Jersey Sanitation violated Sections 9(a) and 21(o)(4) of the Act by causing or allowing the
discharge of contaminants into the air and violated Section 9(c) of the Act and Section 237.102
of the Act for causing or allowing the open burning of waste.
Id
.
 
Board Analysis Finding Violations as Alleged
 
Here, Jersey Sanitation does not dispute that burning of landscape waste occurred.
Further, the Board found above that the landscape waste at the site was stockpiled partially
within the boundaries of the permitted landfill. Accordingly, the Board finds Jersey Sanitation
caused or allowed the open burning of refuse at the Jersey Sanitation landfill as alleged in count
VIII of the second amended complaint.
 
REMEDY
 
As previously stated, The People ask the Board to impose a civil penalty of $65,000
against Jersey Sanitation, award the People $24,100 in costs and attorney fees, and order Jersey
Sanitation to perform a trend analysis of groundwater sample results, submit a groundwater
assessment plan to the Agency for approval, and implement the plan within 30 days of approval
by the Agency. If the sampling and assessments demonstrate violations, then the People request

 
30
that Jersey Sanitation submit a corrective action/remediation plan to the Agency for approval and
implement the plan within 30 days of that approval.
 
The People also ask the Board to order Jersey Sanitation to cease and desist from all
violations of the Act and Board regulations. Finally, the People also request that the Board order
Jersey Sanitation to comply with its permit by submitting a biennial revision to its cost estimates
within 60 days of the date of the Board’s final disposition of this matter.
 
Jersey Sanitation does not discuss the 33(c) or 42(h) factors, yet argues that no penalty is
warranted even after conceding several violations of the Act and Board regulations. Jersey
Sanitation contends that the history of this site, the history of the permitting and enforcement
process, and the history of environmental compliance together dictate that no penalty is
warranted. Jersey Br. at 22-23. In summary, Jersey Sanitation requests that the Board “enter an
order finding the existence of certain violations, but issuing no penalty.”
Id
. Below the Board
discusses the People’s requested remedies in light of the 33(c) and 42(h) factors.
 
Section 33(c) Factors
 
Section 33 of the Act regarding Board orders and determinations provides:
 
(c) In making its orders and determinations, the Board shall take into
consideration all the facts and circumstances bearing upon the
reasonableness of the emissions, discharges or deposits involved
including, but not limited to:
 
(i) the character and degree of injury to, or interference with the
protection of the health, general welfare and physical property of
the people;
 
(ii) the social and economic value of the pollution source;
 
(iii) the suitability or unsuitability of the pollution source to the area in
which it is located, including the question of priority of location in
the area involved;
 
(iv) the technical practicability and economic reasonableness of
reducing or eliminating the emissions, discharges or deposits
resulting from such pollution source; and
 
(v) any subsequent compliance. 415 ILCS 5/33(c) (2002).
 
In determining whether to impose a remedy, and if so, what kind of remedy is
appropriate, the Board considers the entire record of facts and circumstances relating to the
reasonableness of the respondent’s violations of the Act.
 

 
 
31
The Character and Degree of Injury to, or Interference With the Protection of the Health,
General Welfare and Physical Property of the People
 
The People argue this factor should be weighed against Jersey Sanitation because Jersey
Sanitation failed to properly operate and maintain the landfill for over ten years. To support this
argument, the People cite to inspector Rich Johnson’s testimony that during the five inspections
between August 30, 1990 and February 25, 1992, there was a serious threat to the surface water,
leachate flowing into Sandy Creek, and exposed refuse at the facility that had potential for
allowing contaminants into the groundwater. AG Br. at 123.
 
The Board finds that Jersey Sanitation did not comply with several permit requirements,
at least one permit requirement for over 13 years, and remained in violation of the Board’s solid
waste regulations for more than ten years. Further, the record shows that Jersey Sanitation
allowed leachate to enter waters of the State of Illinois on at least three occasions. The first
occurred on January 23, 1991, the second on May 21, 1991, and the third instance took place on
January 21, 2004. The Board weighs this factor against Jersey Sanitation.
 
The Social and Economic Value of the Pollution Source
 
The People contend that the facility would have social and economic value if it operated
in compliance with its permit and applicable regulations. However, the People assert that
because ongoing violations have created continuing costs and interferences with the
environment, this factor should be weighed against Jersey Sanitation.
 
The Board finds that Jersey Sanitation has social and economic value as an employer and
landfill for the community, but that its value is undercut by its history of non-compliance. Jersey
Sanitation’s 13-year history of groundwater contamination nullifies any social or economic value
it may have had.
 
The Suitability or Unsuitability of the Pollution Source to the Area in Which it is Located,
Including the Question of Priority of Location in the Area Involved
 
The People state that Jersey Sanitation originally received local siting because there was
an emergency need for a landfill due to flooding. AG Br. at 124. The People contend that the
record shows documented difficulties with the site. For example, Mrs. Shourd stated “our
landfill design is one that is difficult to manage at best.” AG Br. at 125; citing Tr. at 324. The
People contend that the Board should not weigh this factor in making its determination. AG Br.
at 125.
 
Again, the Board finds that if operated in compliance with the Act, Jersey Sanitation is
suitable to the area in which it is located. However, here Jersey Sanitation operated in violation
of the Act for over a decade. In some instances, the Board has found a facility is unsuitable to its
location if the complainant had priority of location or if the source of pollution significantly
increased its business subsequent to the complainant locating in the vicinity. Neither is the case
here. In fact, the neighbors, after having moved to the area after the landfill was already sited,
eventually purchased the landfill.

 
 
32
 
The Technical Practicability and Economic Reasonableness of Reducing or Eliminating the
Emissions, Discharges or Deposits Resulting from Such Pollution Source
 
Next, the People argue it was technically practicable and economically reasonable for
Jersey Sanitation to reduce or eliminate emissions by properly closing and maintaining the
landfill, yet Jersey Sanitation failed to do so. The People argue that the Jersey Sanitation
Landfill is only 10 acres in size and is, therefore, a relatively small landfill. AG Br. at 127;
citing Tr. at 390. The People cite to People v. Gilmer, PCB 99-27 (Aug. 24, 2000) (
aff’d
No. 4-
00-0809, 4th Dist. 2002) as an example of where the Board found that proper closure of a landfill
is technically practicable and economically reasonable for the owners of the site. The People
assert that like in Gilmer, the Board should find that the costs associated with complying with
Jersey Sanitation’s permit and applicable Board regulations, and performance of a groundwater
assessment, are economically reasonable and technically practicable. Accordingly, the People
urge the Board to weigh this factor against Jersey Sanitation. AG Br. at 128.
 
In response, Jersey Sanitation argues that unlike various other landfills that have cost the
State millions of dollars to close, Jersey Sanitation closed the site on its own. Jersey Br. at 5;
citing Gilmer, PCB 99-27 (Aug. 24, 2000). Jersey Sanitation does not dispute the technical
practicability or economic reasonableness of closing the site, but states simply that it did not
have the finances to comply with closure requirements any sooner.
 
The Board finds that the existence of other instances where the Agency has had to
intervene in order to remediate an abandoned site or prevent harm to the environment do not bear
on the issue of the technical practicability or economic reasonableness or reducing or eliminating
the discharges here. The Act and Board rules make clear that proper landfill closure is the
responsibility of the owner and operator. Further, Jersey Sanitation has made no argument
disputing the technical feasibility or economic reasonableness of properly closing and
maintaining the site. Accordingly, the Board finds that compliance was both technically
practicable and economically reasonable, and weighs this factor against Jersey Sanitation.
 
Any Subsequent Compliance
 
As to subsequent compliance, the People argue that, prior to 1995, Jersey Sanitation
made little progress in improving conditions or pursuing compliance with applicable regulations
and permit conditions at the landfill. AG Br. at 129. The People further contend that although
Jersey Sanitation has taken steps to correct a portion of the violations, Jersey Sanitation still has
not brought the site into compliance with groundwater and financial assurance requirements. For
example, Mr. Blake Harris testified that Jersey Sanitation was out of compliance with financial
assurance requirements from February 8, 1993 through October 5, 1999. Then again since
March 15, 2001, respondent has failed to submit revised cost estimates, and has been out of
compliance since that date. AG Br. at 130. Further, the People assert that while Jersey
Sanitation has submitted quarterly monitoring results, respondent has never acknowledged or
remedied the exceedences of the Board’s groundwater quality standards at the landfill. AG Br.
at 130.
 

 
 
33
Again, Jersey Sanitation simply argues that the Agency certification of closure indicates
that Jersey Sanitation came into compliance as of September 30, 1994. Jersey Br. at 6. Jersey
Sanitation states that it did all that it could to come into compliance. Jersey Br. at 22. The
record indicates that Jersey Sanitation has taken steps to close the facility, seek siting approval
for exceedences of its permitted boundaries, and attempted to satisfy cover requirements.
However, inspection reports completed after the People initiated this action show Jersey
Sanitation remains in violation and groundwater testing performed in 2003 shows exceedences.
The Board weighs this factor against Jersey Sanitation.
 
Section 42(h) Factors
 
The Board is expressly authorized by statute to consider the factors in Section 42(h) of
the Act in determining an appropriate penalty. In addition, the Board must bear in mind that no
formula exists, and the Board must consider all facts and circumstances of record that may
mitigate or aggravate the penalty amount. Gilmer, PCB 99-27, slip op. at 6; 415 ILCS 5/42(h)
(2002).
2
 
The People ask the Board to order Jersey Sanitation to pay a civil penalty of $65,000 to
promote compliance with the Act. Above the Board found that Jersey Sanitation violated 15
different sections of the Act and 16 different sections of the Board regulations, with groundwater
violations lasting 13 years. Pursuant to Section 42(a) of the Act, the Board may order Jersey
Sanitation to pay a civil penalty of $50,000 for each of these violations. In addition, Section
42(a) allows the Board to impose an additional civil penalty of $10,000 per day for each day the
violation continues. The Board has already discussed above the factors set forth in Section 33(c)
of the Act. Below, the Board will address the Section 42(h) factors in determining the
appropriate amount of civil penalty.
 
 
Section 42 of the Act regarding civil penalties provides:
 
(h) In determining the appropriate civil penalty to be imposed under
subdivisions (a), (b)(1), (b)(2), (b)(3), or (b)(5) of this Section, the Board
is authorized to consider any matters of record in mitigation or
aggravation of penalty, including but not limited to the following factors:
 
(1) the duration and gravity of the violation;
 
2
Section 42(h)
 
of the Act was substantially amended by P.A. 93-575, effective January 1, 2004.
Among other things, the amendments establish that a violator's economic benefit from delayed
compliance is to be the minimum penalty amount. The hearing in this proceeding began in
September 2003 and was continued in January 2004. Accordingly, the parties did not prepare
evidence or arguments specific to the additional factors in the amendment.
See
AG Br. at 136.
Therefore, the Board will not use the amendments in determining the appropriate penalties to
impose on respondents.
 

 
 
34
(2) the presence or absence of due diligence on the part of the violator
in attempting to comply with requirements of this Act and
regulations thereunder or to secure relief therefrom as provided by
this Act;
 
(3) any economic benefits accrued by the violator because of delay in
compliance with requirements;
 
(4) the amount of monetary penalty which will serve to deter further
violations by the violator and to otherwise aid in enhancing
voluntary compliance with this Act by the violator and other
persons similarly subject to the Act; and
 
(5) the number, proximity in time, and gravity of previously
adjudicated violations of this Act by the violator.
 
People's Arguments
 
With regard to the Section 42(h) factors, the People argue that many of the violations
have continued for periods of greater than five years and specifically with regard to groundwater
quality standards, Jersey Sanitation has been in violation since 1991, for a total of 13 years of
ongoing violations. AG Br. at 131.
 
Further, the People argue the gravity of the violations is significant. Landfill inspection
reports dating back to the early 1990s document threats to surface and groundwater. AG Br. at
131. The People contend that by utilizing an inadequate monitoring plan, Jersey Sanitation has
threatened the general welfare and health of the people and protection of the environment,
including protection of the state’s groundwater resource. AG Br. at 131-32.
 
The People argue Jersey Sanitation lacks diligence in attempting to comply with the Act
and Board rules. As discussed above, several of the violations continued for over five years.
Another example of lack of diligence, claims the People, is that the over-height condition was
first identified on January 23, 1991, and Jersey Sanitation did not secure siting approval for the
height violations until 1999. AG Br. at 134.
 
The People assert that two figures represent the minimal economic benefit Jersey
Sanitation enjoyed by failing to comply with its permit, the Act, and Board regulations. First, the
People state that Jersey Sanitation realized a benefit of $25,233.53 by not meeting financial
assurance requirements for the site. AG Br. at 136; citing Compl. Exh. 7, 8, 9, 10, and 11.
Second, the People argue that Jersey Sanitation avoided spending $9,000 by not performing a
required groundwater assessment. The People contend Mr. Rathsack arrived at this figure
because he was asked by Jersey Sanitation to do a comparison of cost estimates while Jersey
Sanitation was preparing the 1999 application for a supplemental permit. AG Br. at 136.
 

 
 
35
The People note that on March 21, 1991, the Agency filed an administrative citation
against Jersey Sanitation, to which Jersey Sanitation did not contest. Jersey Sanitation paid the
penalty on April 29, 1991. AG Br. at 137; citing Parties Exh. 11, 12, 13, 14, 16, and 17.
 
Together, the estimate for a groundwater assessment and the amount of financial
assurance requirements left unpaid, representative of the benefit of costs avoided, total $34,433.
In addition, the People assign the value of the duration and gravity of the violations as $30,567.
 
In sum, the People request a $65,000 for the conceded violations alone as an amount
sufficient to deter violations by Jersey Sanitation and those similarly situated and encourage
compliance with the Act. AG Br. at 137; AG Reply at 7. The People explain that the conceded
violations represent both first time and repeat ongoing violations.
Id
.
 
Jersey Sanitation’s Arguments
 
In response, Jersey Sanitation disputes that it enjoyed an “economic benefit” of
$25,233.53, by failing to sufficiently fund its closure/post-closure care fund. Jersey Sanitation
maintains that the shareholders used all of the revenue from the landfill to pay for landfill
operations and fund the closure/post-closure account. Further, Jersey Sanitation contends that
the $6,000 alleged by the People as the cost of the “economic benefit” for not performing a
groundwater assessment is absurd. Jersey Sanitation contends that in the previous permit appeal
the Board struck the requirement mandating the type of groundwater assessment the People now
propose. Jersey Br. at 16-17.
   
 
People’s Reply
 
In response to Jersey Sanitation’s argument regarding economic benefit, the People
clarify that Jersey Sanitation cannot choose whether to pay money into the closure/post closure
fund; Jersey Sanitation must do so by law. The People state Jersey Sanitation’s calculation
merely represents the advantage it gained through non-compliance. AG Reply at 25. The People
also dispute Jersey Sanitation’s statement that it put all of the landfill revenue into the operation
and closure of the landfill.
Id
. The People state the record merely contains a single statement by
Mrs. Shourd that every cent went into the landfill. Further, state the People, even though Jersey
Sanitation had purchased ten pieces of equipment by 1992 to compact trash and dirt, the record
shows that the landfill showed no signs of compliance with cover requirements until 1995. AG
Br. at 31.
 
The $9,000 cost figured for failure to perform a groundwater assessment, argue the
People, is also appropriate. AG Reply at 26. The People reason that for many years, Jersey
Sanitation had an obligation to conduct a groundwater assessment pursuant to Section 807.315
and the landfill’s permit conditions.
Id
. The People continue that Jersey Sanitation has never
performed one, and $9,000 is “certainly a legitimate part of any cost-savings calculation.” AG
Reply at 27.
 
Penalty Analysis
 

 
36
Based on the 33(c) factors, the Board finds a civil penalty is appropriate. After
consideration of the 42(h) factors, the Board will impose the People’s requested civil penalty of
$65,000. Section 42(a) provides for a civil penalty not to exceed $50,000 for violating a
provision of the Act or Board regulation and an additional civil penalty not to exceed $10,000 for
each day during which the violation continues. By multiplying $50,000 times twelve (the
number of sections of the Act and Board regulations that respondents are alleged to have
violated), a potential civil penalty of $600,000 is reached.
 
Add to that sum, a civil penalty of $10,000 a day for each day of noncompliance with
those sections, and the total maximum penalty could amount to a multimillion-dollar penalty.
The complainant moves the Board to impose a civil penalty of $65,000.
 
The Board finds that the duration and gravity of the violations, the lack of diligence on
the part of Jersey Sanitation Corporation, and the economic benefits that Jersey Sanitation
accrued through noncompliance warrant a substantial civil penalty. The permit requirement is an
essential part of the State's enforcement program to protect against environmental damage, and
the record clearly shows that Jersey Sanitation violated its various permits, the Act, and Board
regulations for 13 years. Further, Jersey Sanitation caused water pollution by allowing leachate
from the landfill to enter waters of the State, and has violated certain financial assurance
requirements since 1993.
 
The Board finds there was actual harm to the environment since wells downstream of the
site showed exceedences of class II groundwater quality standards, while wells upstream showed
none. Further, leachate was observed entering Sandy Creek on four occasions. The permit
requirements are an essential part of the State's enforcement program to protect against damage
to the environment and public welfare. The failure to adequately provide financial assurance is
also a grave offense. In ESG Watts I, the Board stated “the funding of the financial assurance is
an obligation every owner of a landfill in Illinois owes the taxpayers of this State and is part and
parcel of the cost of doing business here.” ESG Watts I, slip op. at 133-34 (assessing a $232,000
civil penalty for financial assurance violations alone).
 
Jersey Sanitation has not diligently attempted to comply and has benefited by delaying
necessary expenditures. For example, the record shows that Jersey Sanitation has not performed
a groundwater analysis and failed to fund the closure/post-closure fund in accordance with the
Board’s solid waste regulations. Jersey Sanitation has owned the facility since 1989, and on only
one occasion has the Agency inspected the site and found no violations. In fact, at recent
inspections done on January 21 and February 17, 2004, Inspectors Johnson and King found
leachate present at the site and entering Sandy Creek. The Board weighs the first three factors in
aggravation of the civil penalty.
 
The Board also finds that the proposed amount will serve to deter further violations by
Jersey Sanitation and similarly-situated entities.
 
The Agency filed an administrative citation against Jersey Sanitation in 1991. IEPA v.
Jersey Sanitation Co., AC 91-10 (May 9, 1991). Because Jersey Sanitation did not contest the

 
 
37
citation, the Board imposed a penalty, which Jersey Sanitation paid on April 29, 1991. The
Board weighs this factor against Jersey Sanitation.
 
The Board finds that $34,433 the People request as representative of the costs avoided
and the value the People assign to the duration and gravity of the violations, $30,567, are
appropriate. Because the violations have been ongoing for many years, even after the facility
closed in 1992, a $65,000 penalty is necessary to deter Jersey Sanitation and similarly situated
entities from violating the Act and Board regulations.
 
In addition to imposing a penalty, the Board will also require Jersey Sanitation to take
steps to bring the site into compliance and prevent further violations. The Board will order
Jersey Sanitation to cease and desist further violations of the Act and Board regulations.
Incidental to the cease and desist order, Jersey Sanitation will be ordered to comply with the
requirements of its permits, including groundwater sampling, analysis, and reporting
(supplemental permit No. 1999-209-SP, conditions C.5 through C.7., and the groundwater
monitoring plan contained in Jersey Sanitation’s 1999 supplemental permit application,
Attachment 5), financial assurance requirements, and a biennial revision of its cost estimates
(supplemental permit No. 1999-209-SP, condition B.3). Further, the Board orders Jersey
Sanitation to develop a groundwater assessment plan, submit the plan to the Agency for
approval, and implement the plan within 30 days of the Agency’s approval. If the results of the
groundwater sampling and assessment plan demonstrate exceedences attributable to Jersey
Sanitation Landfill, this order requires Jersey Sanitation to develop and submit a corrective
action plan to the Agency for approval, and implement the plan within 30 days of the Agency’s
approval.
 
ATTORNEY FEES
 
Finally, the People have requested attorney fees and costs in accordance with Section
42(f) of the Act (415 ILCS 5/42(f) (1996)), that provides in relevant part:
 
Without limiting any other authority which may exist for the awarding of
attorney’s fees and costs, the Board may award costs and reasonable attorney’s
fees, including the reasonable costs of expert witnesses and consultants, to the
State’s Attorney or the Attorney General in a case where he has prevailed against
a person who has committed a willful, knowing or repeated violation of the Act.
415 ILCS 5/42(f) (2002).
 
According to the People, the ongoing violations at Jersey Sanitation Landfill were
knowing and willful violations of the Act, regulations, and permit conditions and therefore, the
People request attorney fees. The People request fees at an hourly rate of $150 per hour for the
first 154 hours spent enforcing this matter for a total of $24,100.
 
From the facts found above, the Board finds that the violations in this proceeding meet
the provisions of Section 42(f) of the Act. Jersey Sanitation knew it was responsible for closure
of the landfill and for complying with all of the related laws and regulations. Jersey Sanitation
spoke with the Agency before purchasing the landfill, and had been issued an administrative

 
38
citation for certain violations in 1991, almost 14 years ago. Further, Jersey Sanitation did not
contest the rate or number of hours that the People request. The Board grants the request for
attorney fees and orders Jersey Sanitation to pay fees in the amount of $24,100.
 
CONCLUSION
 
This order finds all of the remaining contested violations, imposes a $65,000 civil
penalty, and awards the People $24,100 in attorney fees. The Board also denies the People’s
motion for sanctions and upholds the hearing officer’s rulings at hearing.
 
ORDER
 
1. The Board finds that Jersey Sanitation Corporation (Jersey Sanitation) violated
the following provisions of the Environmental Protection Act: 9(a), (c), 12(a),
(d), 21(d)(1), (2), 21(e), 21(o)(1), (2), (3), (4), (5), (6), 21.1(a), and 22.17. 415
ILCS 5/9(a), (c), 12(a), (d), 21(d)(1), (2), 21(e), 21(o)(1), (2), (3), (4), (5), (6),
21.1(a), and 22.17 (2002).
 
2. The Board finds that Jersey Sanitation violated the following provisions of the
Board’s regulations: 237.102(a), 620.420(a), (d), 807.301, 302, 305(a), (c), 313,
314(e), 315, 318(b), (c), 502, 601, 603(b)(1), and 623. 35 Ill. Adm. Code
237.102(a), 620.420(a), (d), 807.301, 302, 305(a), (c), 313, 314(e), 315, 318(b),
(c), 502, 601, 603(b)(1), and 623.
 
3. No later than April 4, 2005, which is the first business day following the 60th day
after the date of this order, Jersey Sanitation must pay $65,000 in civil penalties
and $24,100 in attorney fees of the People of the State of Illinois. Jersey
Sanitation must pay the civil penalty by certified check or money order, payable
to the Environmental Protection Trust Fund. Jersey Sanitation must pay the
attorney fees by certified check or money order, payable to the Hazardous Waste
Fund. The case number, case name, and Jersey Sanitation’s social security
number or federal employer identification number must be included on each
certified check or money order.
 
4. Jersey Sanitation must send each certified check or money order to:
 
Illinois Environmental Protection Agency
Fiscal Services Division
1021 North Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
 
5. Jersey Sanitation must perform a trend analysis of groundwater sample results.
Jersey Sanitation must retain a professional engineering firm to develop a
groundwater assessment plan, submit the plan to the Agency, and implement the
plan within 30 days of approval by the Agency. If the results of the groundwater

 
39
sampling and assessment plan demonstrate exceedences attributable to Jersey
Sanitation Landfill, Jersey Sanitation must submit a corrective action plan to the
Agency for approval, and implement the plan within 30 days of the Agency’s
approval.
 
6.
Jersey Sanitation must comply with its permits and all applicable permit
conditions, including Section B.3. of supplemental permit No. 1999-209-SP.
Jersey Sanitation must submit a revised cost estimate for post-closure care by
April 4, 2005, which is 60 days of the date of this order.
 
7.
Jersey Sanitation must cease and desist from further violations of the Act and
Board regulations.
 
8.
Penalties unpaid within the time prescribed will accrue interest under Section
42(g) of the Act (415 ILCS 5/42(g) (2002)) at the rate set forth in Section 1003(a)
of the Illinois Income Tax Act (35 ILCS 5/1003(a) (2002)).
 
 
IT IS SO ORDERED.
 
Section 41 (a) of the Environmental Protection Act provides that final Board orders may
be appealed directly to the Illinois Appellate Court within 35 days after the Board serves the
order. 415 ILCS 5/41(a) (2002);
see also
35 Ill. Adm. Code 101.300(d)(2), 101.906, 102.706.
Illinois Supreme Court Rule 335 establishes filing requirements that apply when the Illinois
Appellate Court, by statute, directly reviews administrative orders. 172 Ill. 2d R. 335. The
Board's procedural rules provide that motions for the Board to reconsider or modify its final
orders may be filed with the Board within 35 days after the order is received. 35 Ill. Adm. Code
101.520;
see also
35 Ill. Adm. Code 101.902, 102.700, 102.702.
 
 
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above opinion and order on February 3, 2005, by a vote of 4-0.
 
Dorothy M. Gunn, Clerk