REC~VED
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
CLERK’S OFFICE
IN THE MATTEROF:
SEP 2~2OO~
)
Pollution
STATE OF
Control
ILLINOIS
Board
)
)
PROPOSED AMENDMENTS TO:
REGULATION PETROLEUM LEAKING
UNDERGROUND STORAGE TANKS
35
ILL. ADM. CODE
732
)
IN THE MATTER OF:
PROPOSED AMENDMENTS TO:
REGULATION PETROLEUM LEAKING
UNDERGROU1~~DSTORAGE TANKS
35
ILL. ADM. CODE 734
)
To:
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board
James R. Thompson Center
100 W. Randolph, Suite 11-500
Chicago, Illinois 60601
)
)
)
)
)
R04-22
(Rulemaking
—
UST)
R04-23
(Rulemaking
—
UST)
Consolidated
Ms. Marie E. Tipsord
Illinois Pollution Control Board
James R. Thompson Center
100 West Randolph, Suite 11-500
Chicago, IL 60601
NOTICE OF FILING
Now comes CLAIRE A. MANNING, on behalfofthe Professionals ofIllinois for the
Protection ofthe Environment, PIPE, and files with the Board, via facsimile, with permission, on
September 23, 2004, with hard copy placed in ov~iightmail on that sani~date, the attached
copies ofPIPE’S PUBLIC COMMENT.
CLAIRE A. MANNING
Posegate & Denes, P.C.
Ill N. Sixth Street, Suite 200
Springfield, Illinois 62701
(217) 522-6152
(217) 522-6184 (FAX)
c lal re@posegatc-dcncs.corn
Claire A. Manning
RECE~VED
BEFORE THE ILLINOIS POLLUTION CONTROL
BOARDCLERKS OFFICE
INTHEMATTEROF:
)
SEP 2~
2004
PROPOSED AMENDMENTS TO:
))
R04-22
PollutionSTATE
OFControlLLINOISBoard
REGULATION PETROLEUM LEAKING
)
(Rulemaking
-
UST)
UNDERGROUND STORAGE TANKS
)
35 ILL. ADM. CODE 732
)
IN THE MATTER OF:
PROPOSED AMENDMENTS TO:
REGULATION PETROLEUM LEAKiNG
UNDERGROUND STORAGE TANKS
35 ILL. ADM. CODE 734
PUBLIC COMMENT
Now comes Professionals of Illinois for the Protection of the Environment, PIPE, by and
through its attorney, CLAIRE A. MANNING, and offers the following public comment for the
Board’s consideration prior to its First Notice Opinion and Order.
As a preliminary matter, the Professionals of Illinois for the Protection ofthe
Environment (PIPE) would like to thank the Pollution Control Board for its attentiveness and
questions throughout these important hearings. PIPE members and others, Dan Goodwin, on
behalfof the American Council ofEngineering Companies (“ACEC”) (formerly known as the
Consulting Engineers Council ofIllinois, or “CECI”), Mike Rapps, on behalfof the Illinois
Society for Professional Engineers (ISPE) and Bill Fleishli, on behalf ofthe Illinois Petroleum
Marketer’s Association (PMA), have testified to their concerns regarding these rules. PIPE
hopes that the Board is poised to adequately address and resolve these public concerns in a First
Notice proposal.
)
)
)
)
)
)
R04-23
(Rulemaking
—
UST)
Consolidated
However. resolution will require major revisions to the Agency’s proposal, revisions that
arc well within the Board’s authority under Section 27 and 28 ofthe Environmental Protection
Act (“Act”). PIPE has suggested alternative language that, in this Public Comment, it stands
behind and provides enhancement thereto. However, PIPE submits that, in the context ofBoard
rulemaking, it is not the commentor’s responsibility to provide justification for its suggested
language changes; it is the proponent’s responsibility to providejustification for the proposal it
requests the Board to adopt. PiPE’s alternative language was not drafted with the idea that the
Board accept each piece of language wholesale. It was drafted with the intention that the Board
recognize the missing and faulty concepts in the Agency’s rule, and draft a Board rule, for First
Notice, that makes this UST program work
—
in the specific areas earmarked by PIPE. While
PIPE members are divided as to the value of another hearing prior to any Board order in this
matter, if the Board is not poised to significantly address the concerns raised in this record, PIPE
would
suggest another hearing.
PIPE appreciates the many arduous hours the Agency has put into the drafting and
defense ofits proposal. The majority of the Agency’s work in revising its proposed rules is
commendable. With specific language changes to the three-bid scenario, as set forth below,
PIPE would be able to accept rates set forth for items that are subject to the bid scenario.
Further, while not opposed to the lump sum concept, PIPE believes that certain basic changes are
necessary prior to this concept actually working as the Agency has publicly claimed it expects.
As PIPE has voiced many times in this proceeding, PIPE fully supports the Agency’s efforts at
defining, where possible, in a regulatory context, what standard costs will be considered
“reasonable” so that reimbursement can proceed expeditiously arid without the usual conflict that
currently taints the reimbursement program.
2
PIPE suggests, however, that in its members’ experience with the UST program,
“reasonable” has too often been a moving target. What is “reasonable” and therefore
“approvable” to one reviewer may not be “reasonable” to another reviewer. What is
“reasonable” for one company to propose to the Agency may not be seen as “reasonable” when
another company proposes it. What was considered “reasonable” on a given rate sheet was,
without warning, considered “unreasonable” upon modification ofthat rate sheet. Certainly,
PIPE members applaud, and look forward, to a consistent application of identified “reasonable”
costs on the part ofthe Agency. However, PIPE queries: will what has historically been
“reasonable” during the last several years now, upon promulgation ofthese rules, suddenly
become “unreasonable”?
Certainly, PIPE companies, who have established viable UST remediation businesses
over the course ofthe last several years, have as much reason as anyone to ensure that the Board
establishes rules which are workable and which provide for an expeditious method of
reimbursing for the “reasonable” and the easily identifiable costs of remediation. The challenge,
ofcourse, is determining what is “reasonable.” The Board is generally called upon to determine
“reasonableness” in a myriad ofcontexts; usually those contexts have to do with the economic
reasonableness and technical feasibility ofa standard measurement of pollution. In this context,
the Board is called upon to assess, independently ofcourse, the propriety of the Agency’s
proposed rules that are, in large part, intended to regulate the “reasonableness” of the costs
attendant to the business of UST remediation. PIPE submits that, in this context,
“reasonableness” must inevitably envelope the concept of”fairness”: a fair valuation ofthose
costs and a fair process to expeditiously reimburse those who incurred them.’
Dictionary.com detines “lair” in
this
context to he
“reaso,,ahk~
as a basis lbr exchange” as in a
“fair
wage” or a
“fair valuation.”
Einp/wsis
£ukkd.
3
It is in this concept of“fairness” that the Agency’s proposal falls short of “reasonable.”
PIPE will attempt, in this Public Comment, to point specifically to those areas where the Board
should improve and enhance the Agency’s proposed rule prior to First Notice.
BASIC PROBLEMS WITH THE AGENCY’S PROPOSAL
In it’s Statement of Reasons and throughout its entire testimony, the Agency generally
maintains that these rules are necessary to “protect the fund”
---
specifically, to the tune of$25
million dollars annually. Further, throughout the record there is an insinuation that the fund is in
trouble because too much money has been paid out in reimbursement claims. Yet, there is no
record evidence in support ofthat assertion. In fact, the record evidence shows that assumption
to be wrong. The UST Fund Update Gary King submitted into evidence at the last hearing
demonstrates the following:
o Over the last 3 years, less than 70 ofthe UST fund has actually been paid out
annually in reimbursement for UST site remediation.
o While UST revenues
increased
from FY 03 to FY 04 by over $11 million dollars,
the amount ofmoney the State paid out in reimbursements for remediation
actually
decreased
during this same timeframe by about $7 million dollars.
o The
only
line item to increase in expenditures from FY 03 to FY 04 was the
IEPA’s operation which, in two fiscal years, has seen a $500,000 increase, from
$3.4 million in FY 02 to $3.9 million in FY 04. (These amounts do not include
the money the EPA also receives from the USEPA to operate this program.)
Importantly, the Agency has also not been able to provide, on the record of this
proceeding, any valuable data or projection concerning what effect these rules will have on the
fund. This point is crucial: if the Agency cannot provide to the Board a projected and sensible
4
analysis of the impact that the various costs set forth in the rules will have on the fund and, more
generally, on the UST program, how can the Board honestly determine that the Agency’s
regulation-based costs are reasonable? More importantly, how can the Agency assure the Board
that these proposed rules will have a
positive
impact on the state’s UST remediation program,
especially in the face ofthe serious concern that has been voiced by the very companies who are
conducting a large number ofthese remediations?
PIPE has established, through its testimony and exhibits, that there are over 10,000
Illinois UST sites that yet need to be remediated and at least half of those sites are considered
“inactive”
--
meaning that there have been no efforts, as yet, to even begin the remediation
process. Given these facts, the Agency in proposing these rules to the Board should be in a
position to assure it that they are designed to provide for a more directed use ofthe fund:
specifically, to provide for a maximum use ofthe fund for the purpose for which it was intended:
reimbursement ofUST sites. Only then can the Board be assured that the rule it promulgates
will have the intended positive effect: a UST remediation program that provides for a fair,
reasonable and timely reimbursement of the actual costs associated with the remediation. Only
then can the Board, and the State, be assured that these rules will have the affect of
promoting
the remediation ofthe remaining UST sites.
However, the Agency’s proposal, and its testimony, provides no such assurance. In the
face of significant opposition to its proposed rules, by those very companies who have a lion’s
share ofthe UST remediation business in Illinois, the Agency’s pointing to a few silent
companies who claim to be comfortable with the proposed rules certainly does not provide that
assurance.
5
There arc two basic problems with the Agency’s proposal. First, the proposed
reimbursement rates are flawed. They arc not based upon any empirical data, nor are they based
upon a representative sampling ofvarious UST sites. They are based upon outdated data, and
old sites. En many cases, the rates reflect rates that were established in old “rate sheets” that have
since been overridden by newer “rate sheets.” They do not consider or reflect any industry
standard pricing guidelines, such as
RS Means.
In the case of lump sums for specific items
(Corrective Action Reports, Site Investigations, etc.) they do not identify the scope ofwork to be
performed for the particular lump sum price.
Second, the proposal contains no commitment to any process efficiencies. PIPE has
suggested many; the Agency has rejected all. Hopefully, although the Agency has not
recognized that the workability of its program is at the very heart ofthis rulemaking, the Board
will recognize such
---
and deal with it
---
prior to promulgating this rule as its own.
SPECIFIC ISSUES
PIPE has proposed specific changes to the rules in its filing ofAugust 2, 2004. To a large
degree, those changes were the subject of testimony and questions at the Board’s last hearing. In
this public comment, PIPE enhances its suggested changes, based upon the information and
evidence contained in the Board’s record in this proceeding.
I.
REGULATORY, APPLICABILITY AND DEFINITIONAL ISSUES
Merge Parts. As previously indicated, these rules would be less confusing if they were
not proposed as two separate parts. PIPE, however, does not plan to take the initiative to merge
them, but would support the Board doing so. For ease ofthe reader, this Public Comment refers
only to the specific sections contained in Part 734. To the extent a similar section is contained in
Part 732, PIPE intends that the identical change be made to that section as well.
()
Applicability. PIPE suggests that the Agency’s proposed applicability section would
allow for an unlawful retroactive application of these Parts because it would apply to work
performed prior to the effective date ot’the rules. PIPE has suggested applicability language that
would avoid that result, but trusts that the Board itself can effectively “wordsmith” this section to
achieve the correct result.
UST-Remediation Applicant (UST-RA). In its proposed alternative language, PIPE
simply suggested creating a definition for those who actually perform the UST remediation and,
to do so, it borrowed a concept from the Brownfields program and suggested weaving that
definition throughout these rules. The Agency’s assertion, at the Board’s last hearing, that such
suggestion unlawfully draws an improper connection between Title XVI and Title XVII ofthe
Act is simply wrong. While it is true that PIPE drew the “RA” concept from the statutory
language contained in Title XVII, there was and is no intention to equate Title XVII with Title
XVI. Any definitional phraseology (“remediation consultant” or “applicant” or “agent”) can be
utilized. The point simply is that the person dealing with the Agency under these rules is
generally not the owner /operator, but the remediation consultant, however that entity or person
is defined. The UST-RA definition was simply proposed so that these rules, and the Agency,
would give recognition to that simple reality.
II.
REIMBUSEMENT ISSUES
Subpart H has been the source ofthe greatest controversy in this rulemaking. This Public
Comment draws upon, and enhances, PIPE’s Alternative Proposal that was filed on August 2,
2004 and was the subject of testimony at the Board’s last hearing.
PIPE commends the Agency for trying to find a way to protect the fund from
unreasonable costs and reimbursement requests. Further, PIPE agrees, as did the Ad-Hoc
7
workgroup, that lump sums, where appropriate, arc a good way to weed out excessive costs.
encourage defined and stable pricing, and allow for quicker and more efficient processing time.
However, PIPE submits that the professional services cost constraints proposed in this rule are
set too low to capture reasonable service costs and do not consider the actual work required to
perform the service or the variables attendant to work performance, efficiency and quality.
Further, if the procedural issues regarding “maximum payment amounts” and “extraordinary
costs” under Section 734.855 are not addressed by the Board, the lump sum payment concept
will simply not work. On that note, PIPE suggests that Section 734.855 needs to be significantly
redrafted.
Further, it is well documented in the record that the Subpart H cost numbers proposed by
the Agency are primarily based upon limited data from past incidents, much ofit from as far
back as 1998. The cost data was not analyzed using defendable scientific statistical procedures
orproper sampling of all available data. While the Agency submits, and PIPE accepts, that the
proposed numbers are the Agency’s attempt to establish a reasonable price, setting the numbers
to met the
50th
percentile and averaging costs, based on old data, unfairly hurts the consultants
that are capable of, and perform, good professional work at a reasonable cost. Further, costs that
the Agency reimbursed for in the past would now, upon promulgation ofthese rules, suddenly
become unreasonable and unreimbureseable to the eligible owner and operator.
The Board is therefore challenged, based upon this record, to determine what is
“reasonable” for purposes of reimbursement under Subpart F-I. PIPE submits there are several
ways that this can be done. One way is to make the Agency go back to the drawing board, and
develop these amounts based upon reliable and representative data and then, at the very least, set
the lump sums at a figure that captures at least 75 ofthe reasonable costs that the Agency has
processed. At this point, however. PIPE does not support that approach, as it has spent much
time and effort in this rulemaking, and supports the notion that reasonable reimbursement costs
should be, to the extent possible, set forth in regulations. These regulations were a long time in
coming as it is; PIPE would like to see the Board move something forward, in consideration of
the testimony it has heard to date.
A second approach is for the Board to recognize that the Agency’s Subpart H costs were
in large part based upon 1998 data and, at the very least, they should be adjusted for inflation. A
third approach, and the one PIPE proposes here, is for the Board to utilize, where possible,
RS
Means
to ascertain standardized industry costs. See 2004 RS Means
Environmental Cost
Handling Options and Solutions
(ECHOS) 1oth Edition. Further, as PIPE has proposed at
hearing, and further refines here, lump sum amounts, in order to be reasonable, must take into
consideration the actual scope of work required for the service being given on a lump sum basis.
PIPE accordingly suggests alternative values for the relevant lump sum amounts the Agency
proposes in these rules.
A. Usual and Customary Costs.
The Agency’s phraseology“maximum payment amounts” as the title and throughout
Subpart H is itself inconsistent with the Agency’s proposed Section 734.855 and Section 734.800
(b), which both provide that the Subpart H prices can be exceeded and are not intended to be
exclusive. While the Agency testified to its expectation that only a minor portion ofclaims
would fall under Section 734.855, the Agency is alone in such testimony and, further, as the rule
is currently drafted, the record does not support it.
Thus, PIPE proposes that a more accurate phraseology be used and, in its proposal, it
suggested the phrase “rcimburscable costs.” However, at the last Board hearing, the Agency
9
testimony reflects a confusion between the newly suggested “reimburseable costs” phraseology
and its existing “corrective action costs” phraseology contained in Section 734.630. PIPE
suggests that other terminology could be utilized, such as “usual and customary costs” or
“reasonable costs.”
The point is, as the Agency testified, and as PIPE accepts, these rules are intended to
allow for a remediation consultant to project the cost ofa project based upon the standardized
rates set forth in this rule, but other costs might be appropriate under Section 734.8
55.
Thus, the
phraseology “maximum payment amounts” is a misnomer and should not be adopted,
conceptually, by the Board in its regulatory language.
B.
Section 734.800 Applicability. For that same reason, PIPE proposed alternative
language to Section 734. 800 in its proposal. PIPE stands by that proposal, with the following
refinements, intended to provide clarity and to further address concerns raised at hearing.
Section 734.800
Applicability
a)
This Subpart H sets forth the costs that an owner and operator can expect
to be paid from the fund for various remediation activities. The costs are
divided into one ofthree formats: payment by lump sum; payment for
unit of production; or payment by time and materials. Where payment is
by lump sum, the dollar amount set forth in this subpart is presumed to be
reasonable for all tasks set forth in Appendix G. Where payment is by
unit of production, the dollar amount set forth is presumed to be
reasonable for all equipment, material and labor required to complete that
specific unit ofproduction task. Where payment is by time and materials,
the Agency will conduct a review to ensure the reasonableness ofthe time
and material budget request or expenditure.
b)
The costs listed under a particular task identify costs associated with the
task; they are not intended as an all-inclusive list ofall costs associated
with the task for purposes of payment from the Fund. Necessary costs not
listed under a particular task may be considered to represent extenuating
circumstances and, subject to adequate justification pursuant to this Part,
may necessitate additional payment.
I0
c)
Eligibility or ineligibility ot’a type ot’costs will be determined pursuant to
Subpart F of this Part. This Subpart H sets forth the reasonable costs for
purposes ofreimbursement ofthese eligible costs. Where lump sum or
unit of production costs are contained in this Subpart, applicants are not
required to provide a detailed time or materials breakdown or invoice for
costs associated with each task, provided that the costs are at or below the
specified lump sum or unit ofproduction costs set forth in this Subpart.
Costs in excess ofthese amounts will require separate and adequate
justification ofreasonableness on a time and materials basis.
d)
Any and all activities conducted under this Part that are required to be
conducted on an emergency basis, as directed by an entity ofthe State of
Illinois, shall be paid on a time and materials basis.
C.
Reasonable Costs ofUST Removal
—
Section 734.8 10. PIPE proposes alternative
rates to those proposed by the Agency in this Section. The rates PIPE proposes are derived
specifically from
RS Means,
a publication setting forth standard industry rates for various items,
rounded to the nearest hundred dollars. See 2004 RS Means
Environmental Cost Handling
Options and Solutions
(ECHOS) l0t~~Edition. The latest
RS Means
is widely available as a
technical publication but PIPE, in a separate filing, provides this document to the Board as a
supplement to the materials submitted at hearing. Attachment “A” to this Public Comment sets
forth the methodology PIPE used to arrive at the
RS Means
derived rate. These rates, we believe,
are eminently more justifiable as “reasonable” than those proposed by the Agency. PIPE also
proposes changes to the text ofthis section, to provide further clarity.
Section 734.810
UST
Removal or Abandonment Costs
The following payment for costs associated with UST removal or abandonment of
each UST shall be considered reasonable. With the exception of flowable
material utilized for tank abandonment, such costs shall include those associated
with the excavation, removal, disposal and abandonment o’the ~JST. They do not
include costs reluLed to the disposal of any residual material contained in the UST
system. Costs associated with the disposal of any residual material and costs
associated with flowable fill material will be reimbursed on a time and materials
basis
II
110
I ~
gallons
S2,00()
2.000—4.9~)’)gallons
54,400
S ,00()
I 4,990 gallons
57.500
I 5,000
10,999 gallons
S9.00()
20,000 or more gallons
$11,800
D.
Reasonable Costs of Free Product or Groundwater Removal and Disposal, Section
734.8
15.
With the exception of changing the Agency’s language from “costs.. .shall not
exceed” to “The following costs... .shall be considered reasonable” (and doing so throughout
this subpart), PIPE can accept the numbers proposed by the Agency as “reasonable” with the
understanding that the Agency’s three bid scenario, proposed in Section 732.855, is available
where these costs cannot be readily achieved.
E.
Drilling, Well Installation, and Well Abandonment, Section 734.8
15.
PIPE has
no alternative numbers to propose regarding pricing for bedrock coring or vacuum extraction.
However, PIPE points the Board to
RS Means
methodology concerning hollow-stem auger
drilling, well installation and abandonment. See Attachment “B”. Further, PIPE suggests that a
cleaner method of ascertaining costs and payment in these categories is to include drilling costs
in both subsections (a) and (b). As the Agency has proposed this section, subsection (b) stands
alone, but drilling is still required. Thus, PIPE’s suggested changes would establish payment
under subsection (a) for hollow-stem auger drilling and related costs where there is no well
installation at $26 per foot (accepting the Agency’s alternative $1,500 lump sum figure) and
hollow-stem auger drilling under subsection (b), where there
is
well installation, at
$57
per foot.
Since the Agency has proposed the three-bid scenario where warranted, which PIPE
argues is palatable with changes, PIPE proposes no further changes to the numbers proposed by
the Agency in this section. However, to allow for drilling costs using the direct push-platform
method in subsection (I,), where a monitor well is being installed, PIPE would simply suggest
12
adding the Agency’s proposed drilling cost olSIS per foot (subsection a) to it’s proposed cost of
$12.50 per foot under subsection (b) to set forth a subsection (b) rate (which now includes
drilling) of$27.50.
F.
Soil Removal and Disposal, Section 734.825.
PIPE has proposed language
changes to this section, which generally concern the need for consideration of compaction ofsoil
and consideration of off-site stockpiling. PIPE has no alternative figures to propose for this
section, however.
G.
Drum Disposal, Section 734.830; Sample Handling and Analysis, Section
734.835 and Concrete, Asphalt and Paving, Section 734.840. PIPE has proposed specific
language changes to each of these sections, which set forth more specific parameters for
payment, and payment exclusions, under each section. PIPE stands by those proposed changes,
and proposes no alternative figures to those proposed by the Agency in these sections.
H.
Professional Consulting Services, Section 734.845 and various other sections.
The majority ofthe hearing testimony was, in one way or another, related to the concern
voiced by PIPE and others that the Agency’s lump sum payment figures were lacking in
definition because they did not identify what tasks the Agency envisioned were included in the
payments that they seek to have the Board deem “reasonable” in these regulations. The
Agency’s position, akin to “we know it when we see it,” should not be accepted in a regulatory
context. If the Board’s expectation is that these rules are to provide the regulated public, in this
case owners and operators and those conducting UST remediation or them, with a clear
understanding of what is actually covered by these lump sum payments, such definition is
essential to the workability of these rules.
13
Throughout these proceedings PIPE and others have raised concerns about the lack of
methodology attendant to the Agency’s proposed rates for professional services related to liST
remediation. As just one example, PIPE has maintained that averaging of all professional job
titles into one lump sum rate, as the Agency’s proposal appears to do, is too heavily weighted
towards clerical staff, who spend a significantly less amount oftime on reports and field
activities than do professional staff.
Thus, in its alternative proposed language, PIPE referred to a new Appendix that would
clearly define the Scope of Work for each item where the Agency proposed a lump sum as a
“reasonable” reimbursement amount. The Agency has continued to reject such Scope of Work
delineation, and PIPE posits that such rejection is both unjustified and unreasonable. PIPE has
now completed the Scope of Work document and, as an attachment to these Public Comments,
includes a “Task Breakdown Method” which provides an explanation of the methodology used
by PIPE to suggest, in these Public Comments, a method for the Board to derive alternative
values to those proposed by the Agency for lump sum professional services. See Attachment
PIPE also includes, as Attachment “D”, a proposed Appendix G, referred to in PIPE’s
Alternate proposal, which provides a specific breakdown of all tasks associated with those
service items the Agency proposes to deem a specific lump sum price as “reasonable.” Similar
methodology was utilized to ascribe a “reasonable” value to professional field tasks and travel
costs.
In accordance with these attachments, PIPE suggests to the Board that there are different,
and better ways to value the lump sums than that offered by the Agency. Most importantly, the
figure must necessarily he reflective of the actual work and tasks required to perform the item
14
(hat is the subject of the sum. Further,
RS i~’k’ans,
where applicable, represents a recognized and
published industry standard. The Agency’s tigures did not even consider
RS tt’k’ans.
The
following table represents alternative values for various items in these rules, based upon the
scope of work and/or
RS Means.
REASONABLE LUMP SUM VALUE FOR SECflON~
-
734.845 AC~1VITIES
IEPA
Value
-..:
Task Breakdown
Value
.
RS Meai~
Value’~
Early ActioniUST RemovaL ExcavationOffice Tasks
—
$960.00
$1,425.75
N/A
734.845(a)(
1)
20 & 45 Report Preparation
—
734.845(a)(3)
$4.S00.00
$6.442.50
N/A
Stage I Site Investigation Plan— 734.845(b)(l)
$1.600.00
$2,505.00
N/A
Stage I Site Investigation Completion Report
—
734.845(b)(6)
$1.600.00
$6,189.00
N/A
Stage 2 Site Investigation Plan
—
734.845 (b)(2)
$3,200.00
$4,268.25
N/A
Conventional CAP
—
734.845 (c)(1)
$5,120.00
$9,770.25
N/A
Conventional CACR
—
734.845 (c)(4)
$5,120.00
$8,901.75
N/A
Reimbursement
—
734.845(d)(2)
N/A
$2,466.00
N/A
New Project Startup
—
734.845(d)(1)
N/A
$1,698.75
N/A
K*Citations to regulations reference PIPE’s proposal
REASONABLE LUMP SUM VALUE FQR;.L;:~:.:
PROFESSIONAL FIELDTASKS•
~
mPA:~::
Value~
Task Breakdown
Va1ue~.
:•RS Mea~s.~
Value ~
Oversight of 200 yd~of Excavation, Transportation, Disposal
& Backfill
$390.00
(for 225 yd’)
$703.00
$797.40
Oversight of the Installation of 4 Soil Borings
$390.00
$703.00
$1,228.40
Field Activities for 1 Monitoring Well
$390.00
$703.00
$610.87
In-Situ Hydraulic Conductivity Testing
$0.00
$703.00
$540.39
REASONABLE LUMP SUM VALUE
FOR MOBILIZATION AND
TRAVEL COSTS
-
PROPOSED
APPENDIX F
IEPA Value
Task Breakdown Value
~
•~.•
RS Means Value ~
~
~f
~
o to 29 miles
$140.00
$218.25
N/A
30 to 59 miles
$220.00
$376.50
N/A
60 to 89 miles
$300.00
$534.75
N/A
90 to 119 miles
$300.00
$693.00
N/A
120 to 149 miles
$300.00
$851.25
N/A
For all other professional services, where PIPE has not been able to ascribe a
standardized work breakdown structure, and attach estimated hours and therefore a specific value
to such service, PIPF~proposes that the regulations treat these items
Ofl
a time and materials
basms. Some of those specm lie areas are:
Is
Costs related to Stage 3 lump sum payments.
PIPE testimony has established that
many of the easier-to-resolve LUST sites have been closed, and have received
NFR status, over the course of the last tit’teen years. An ever-increasing number
of sites that are being remediated are the more complex and difficult sites to
resolve. PIPE submits that many of the open 10,000 LUST sites have not begun
to be addressed due to the complexity of the project and the extent of
contamination. At issue, then, is the Agency’s proposed lump sum payments for
stage three work, the very complex and oflen variable work that is necessary to
address these complex sites. PIPE testimony has established that the experience
of remediation consultants has shown that even when plans for monitoring and
boring in the most logical off-site locations are approved, the consultant may
nonetheless find himself (or herself) in the not uncommon situation of having to
“chase” the contamination. In order to properly do so, additional plans and
budgets may need to be sent to the Agency. This phased approach has worked
well, for both the Agency and the regulated community, because it ensures that
the extent of contamination is sufficiently defined with the fewest number of
borings and wells. It is not, however, appropriate for “lump sum” allocation.
Thus, PIPE suggests that stage 3 plans and budgets be treated on a “time and
material” basis.
o
Environmental Land Use Controls (ELUCs) and Highway Authority Agreements.
The Agency has proposed a cost limitation for obtaining ELUCs and Highway
Authority Agreements. PIPE members have testified to their experience that the
S800 proposed by the Agency is not sufficient to cover the work tasks and efforts
16
generally necessary to obtain these agreements. These task items should not be
lump sum costs since the work involved is highly variable, with different levels
ofcomplexity from site to site.
o
TACO related work.
The Agency has proposed an $800 lump sum cost limitation
for professional consulting services associated with the development of Tier 2
and Tier 3 TACO remediation objectives, excluding field costs. PIPE members
have testified to their experience that this lump sum amount is not enough to
cover the work tasks and efforts generally necessary to perform and justify the
TACO work for Tier 2, let alone including Tier 3, except in the most basic ofsite
situations.
I.
Bidding, Agency’s Newly Proposed Section
734.855/732.855;
Proof of Payment
from Subcontractors. In its Third Errata Sheet, the Agency has proposed a bidding process as
“an alternative to the maximum payment amounts set forth in this Subpart H.” Generally in this
Public Comment, PIPE refers to this provision as the “three-bid scenario.”
Initially, PIPE
comments that the three-bid scenario is a good way to develop costs for subcontractor services
when the listed Subpart H costs are not adequate.
However, several issues need to be addressed by the Board, and language changed, in
order to make these provisions workable and palatable.
First, the Agency seriously
underestimates the amount of time and effort that will be required to conduct this bidding. How
does the Agency propose that the time it takes to create and evaluate the bids will be paid?
Certainly, the Agency should recognize that payment should be allowed on a time and materials
basis, but such is not accounted for in the rules as drafted.
17
Second. as an alternative to the three-bid scenario, PEPE suggests that the Board allow for
the contractor to justify costs in excess of the Subpart -I costs also by the utilization ofpublished
industry data, such as
RS imvfeans.
in lieu of obtaining three bids. Third, there is no record
justification for the Board to adopt the Agency’s limitation of bids to those subcontractors who
are not financially related to the prime contractor.
This latter point demonstrates how the Agency’s rule proposal, and thought process in
presenting that proposal, is not built upon actual data and business knowledge, but based upon a
faulty presumption, nowhere justified in the record, that costs are inevitably higher where a
prime contractor has established his or her own subcontracting business related to the prime
business such as, in the case of UST remediation, a consultant who owns a drilling company.
PIPE testimony has established that this presumption is simply not justified and that rather, a
contractor who has his or her own drilling company is able to operate more efficiently because
the drilling service is generally able to be accessed by the prime contractor whenever necessary.
Likewise, PIPE opposes the Agency’s new proposal to require proof of payment to
subcontractors as a requirement for payment from the fund. First, this again is an unnecessary
overly bureaucratic requirement that has no relationship to cost containment and should not be a
concern addressed by state regulation. Requiring proofofsubcontractor payment before a claim
can be submitted only slows the reimbursement process, and provides a hardship to the small
businesses and individuals in the State. It does not allow for subcontractors who have agreed to
extended payment terms, or to wait for payment until reimbursement is obtained. If the primary
contractor agrees to wait for payment once the money is reimbursed, why should that concern
Agency or be the subject of regulations? The work was done and documented and general
1l~
accounting practices contirm that once a project is invoiced, the cost for services has been
expended.
Without this ability to rely on the tiand, only the largest and wealthiest UST owners or
corporations can afford the up-front costs to comply with these regulations. Requiring proof of
subcontractor payment before a claim can be submitted unfairly discriminates against the small
businesses throughout Illinois. The Board should not sanction this proposed requirement.
J.
Corrective Action Costs. PIPE testimony suggests strongly that compaction and
of backfill material should be removed as an ineligible cost and treated as an eligible cost.
Without compaction, the record indicates that excavation settles and the site must be revisited to
add additional backfill. Further, the Board should remove, as an ineligible cost under Section
734.630 (nn) costs that are incurred after the NFR letter is issued. Also, as set forth above,
Section
734.630
(ii) should be deleted (disallowance of handling charges for subcontractors
when contractor has not submitted proof of payment). The Agency’s interference in private
party transactions, as this section represents, is unwarranted.
Consultants often hire
subcontractors who are willing to wait for payment until reimbursement is received. There is no
reason for the Agency to prohibit this acceptable business practice.
Likewise, as also argued above, Section 734.630 (oo) should be stricken (disallowance
for handling charges where the subcontractor and contractor have a related financial interest).
The definition of “handling charges” means administrative, insurance, and interest costs and a
reasonable profit for the procurement, oversight, and payment of subcontracts and field
purchases. As is evident from the definition, consultants or contractors incur expenses when
paying subcontractors regardless if they have a direct or indirect financial interest in the
subcontractor. It is unfair to deny handling charges in this context.
19
Section 734.630 (aaa) should also he stricken (costs an owner and operator is required to
pay a government entity for the remediation and corrective action such as permit fees,
institutional control fees, property access fees, etc.) Further, in the past few months, the Agency
has been, for the first time, denying requests for reimbursement for sales tax paid by contractors
or consultants on supplies needed to conduct the remediation. The fund has been established as
an insurance program to allow an owner and operator, once the deductible is paid, to access the
fund for all costs incurred that are related to the remediation. The Agency’s response to this
suggestion was that they saw no need to transfer money from one state entity to another. The
point the Agency misses is that the UST fund is not “state” money, nor is it “agency” money.
It’s a fund, paid into by the owners and operators via their payment of motor fuel tax, for the
specific purpose of assuring them that their properties can be completed remediated by
accessing the fund, once a deductible is paid.
K.
TACO-related Issues, Section 732.408; 732.606 (ggg); 732.606 (hhh~: 734.410;
734.630 (ggg); 734.630 (eee). Recently, the Agency has proposed to eliminate payment of
remediation costs associated with Tier 1 remediation objectives and to force the use of a
groundwater ordinance where a community has one. PIPE testimony indicated that, where
feasible, owners and operators have utilized the benefits of TACO for UST remediation.
However, IPMA is strongly opposed to mandating a TACO clean up as part ofthese regulations.
PIPE supports EPMA’s concerns regarding this mandate in the context ofthe UST program. PIPE
believes that the TACO-related portion of this proposal should not move forward at this time,
certainly not without further hearings.
II.
PROCESS AND PROCEDURAL ISSUES
20
As stated above, process issues are at the very heart ot’this proposal and, while they have
not been recognized by the Agency, the very workability of these rules depends on the Board
recognizing those issues
—
and dealing with them
--
to the full extent of its authority. No one,
save the Agency, believes that these rules will work as envisioned without significant revision.
That alone is significant. Certainly, the PIPE members who testified and who, as the record
clearly establishes, access the Agency’s process as much or more than anyone, certainly have no
such confidence in the workability of the rules as proposed. Rather, they look to the Board to
sort the issues out, prior to moving this forward as a Board rule.
PIPE has suggested to the Agency various ways that would make this process more
efficient. The Agency has rejected them all, and stands on its belief, unsupported by anything at
all in the record, that this process will work efficiently as soon as the Board promulgates the
costs it has deemed “reasonable” as “maximum payment costs.” To the extent it has heard
resounding evidence to the contrary, it has responded that there are other silent contractors out
there, waiting in the wings apparently, ready to pounce on the state’s UST sites as soon as the
Agency lowers its reimbursement rates. Yet, it is the members ofPIPE before the Board in this
rulemaking who have developed viable businesses geared specifically toward the remediation of
UST sites and who know this program, and its foibles, as well as (or better than) the Agency
itself.
PIPE has suggested that the Agency make this process electronic. The Agency has
suggested that any such change would be entirely too costly and not beneficial.
PIPE
realistically recognizes, and accepts, that the Board will be hesitant to require its sister Agency
to develop efficiencies in this process through the use of electronic means. However, PIPE can
assure the Board that this program would benefit greatly from process efficiencies that could be
21
achieved through (lie electronic processing of’ reports and reimbursement claims.
Such
processing would allow for quicker Agency review, more timely payments, and data collection
that can be used to make forward-looking decisions.
Likewise, given the ditTerent nature of disputes that arise from the UST remediation,
PIPE has suggested that the Agency develop, as an alternative prior to formal appeal to the
Board, an alternative process for the resolution of disputes. Clear from Gary King’s testimony
at the last hearing, the Agency has set in its heals in dead-set opposition to agreeing to any
alternative, less costly final state determination of disputed UST remediation cost
reimbursement issues. Thus, PIPE retracts that item from its proposal.
While PIPE understands why the Board would not mandate the above improvements,
PIPE strenuously appeals to the Board to adopt three procedural concepts in these rules, all three
ofwhich are necessary to make this rule work. Each ofthese three changes is well within the
Board’s authority to promulgate in the context ofthis rule.
First, the rules should require that, prior to any denial, the Agency give notice ofthe
specific reason for the denial and an opportunity to correct the deficiency, within the 120-day
review period. The Agency’s response to that suggestion, that it would take too much time
because there are too many rejected claims, is inconsistent with its testimony elsewhere that
these rules are designed to work so that 90 ofthe claims would fall within the Subpart H
parameters and, accordingly, should be immediately approvable
---
without any significant
review. Moreover, the lack ofsuch notice ofdenial may well jeopardize the due process
component of the administrative process. See
Wells Manufacturing C’o., v. Illinois E.P.A. 552
N.E. 2d 1074,
195
Ill. App. 3d 593, 142 Il. Dec. 333, (la’ Dist. 1990).
22
Second, the rules should allow for a shorter processing time than 120 days where the
applicant’s budget meets all the standardized fees contained in these new rules. Gary King’s
testimony on this point, at the last hearing, is perplexing. Basic administrative law principals
would suggest that, when a law obligates a governmental entity to make a decision within a
certain time parameter, there is absolutely nothing wrong with the government entity
committing, even in regulations, to a
shorter
processing time.
Mr. King’s testimony on this point speaks volumes regarding the Agency’s position in
this whole rulemaking. He indicated that the Agency had a “right” to make its decision within a
120-day time frame and that it would be unlawful to require it to make its decision sooner.
Presumably, the Agency fully intends to take its entire 120 days whenever it feels justified in
doing so. What the Agency confuses here is “rights” with “obligations.” As an entity ofthe
state, it has no “right” to
take
the statutory amount of time, it has an “obligation” to make a
decision
in at least
that amount oftime.
Such position ignores the legitimate point PIPE is trying to make here, especially given
the significant testimony regarding the concerns ofPIPE members have testified to concerning
the bias they believe marks the current system. That point: where a company proposes a budget,
plan or seeks a claim that is totally within the parameters ofthese new rules, especially this new
Subpart H, the processing time should be
immediate,
the review should be minimal or non-
existent, and the Agency should so commit. Whether that’s 30 days, 45 days, 60 days, or 90
days, it certainly should
not
take 120 days
—
for each and every claim. PIPE would suggest to
the Board that, when the legislature designed the 120 day timeframe, it was not aware of the
Agency’s desire to present what, in effect, is a cost containment rule, as such cost containment
23
measures as (lie Agency presents in this rulemaking were not provided for in the legislative
changes that are the actual impetus for this rulemaking.
Third and finally, the rules should mandate, as does the Act, that any Agency denial letter
set forth the specific reasons for the denial, based upon the specific section of the Act (or, more
appropriately, these reimbursement rules) with which the Agency believes the applicant has not
complied. The current Agency’s denial letter is totally insufficient. When an appeal is taken, the
petitioning party is at a complete disadvantage in the Board’s current process because it has the
burden of showing why the Agency was wrong, based upon the way the Agency “framed” the
issue and, in most cases, the Agency has not even framed an issue. PIPE has proposed language
on this point would require that the Agency follow the relevant provisions of the law and,
further, would put the burden on the Agency to establish why the plan, budget or report was not
“approvable” in the context ofits new, presumably “streamlined” rules. PIPE welcomes Board
wordsmithing on this, or any, of its proposed language.
The Agency’s continued opposition to these basic changes is not justified
—
especially
given its consistent testimony that the process will work more efficiently once the Board adopts
its rules. PIPE has presented significant testimony that one ofthe major (and most unnecessary)
costs to a company is the cost of dealing with the Agency’s LUST unit. The Agency asks the
Board to believe that efficiencies will be the natural outcome of this very controversial rule,
despite the fact that the Agency itself has not committed to any efficiencies and, presumably,
upon promulgation, it will continue to administer this program utilizing the very same number of
staff it currently employs. Very few who have testified in these hearings believe that these rules,
without significant redrafting on the part ofthe Board, will work as the Agency intends.
24
CONCLUS ON
In the interest of moving this matter forward, and providing a semblance ofstability for
this program, PIPE has made, in good faith, legitimate suggestions geared to achieving what
should be everyone’s basic objective: making this program work so that Illinois UST sites can
be effectively and efficiently remediated, through an intelligent and judicious use ofthe UST
fund.
PIPE thanks the Board for the opportunity to present its position in this important matter.
While the parties appear to be significantly at loggerheads on various issues, PIPE hopes that the
Board can, through its good and proficient offices, sort through these issues and move this matter
forward in a way that works to promote the remediation ofUST sites in illinois.
Res
tfully submitted,
~EA.Ma~ng
On Behalf of the Professionals of Illino~ for the
Protection ofthe Environment
CLAIRE A. MANNING
Posegate & Denes, P.C.
Ill N. Sixth Street, Suite 200
Springfield, Illinois 62701
(217) 522-6152
claire(Zi~osegate-denes.com
25
RS Means (2004) Up to
-
2,000 gal UST Removal
z
-.3
Mssn~y1
~“.DescriptIon-~
‘-aUnltCost”~,~1~~.~4..~’~~units
-..-
:.~ ~-..
cost~-~~.
17
02 0208 Demolish
Mesh Reinforced Concrete to 6” thick
with
Power Equipment
$42.57
c.y.
2.6
c.y.
$110.68
33
10
9502
Remove Steel/Fiberglass UST, up to 2,000 gallons
$1,765.00
ea.
1
ea.
$176500
Backfill Material. Transportation and
Labor
(per EPA)
$20.00
c.y.
10
c.y.
$20000
Total Cost:
$2,075.68
RS Means (2004)
-
2,001 -5,000 gal UST Removal
A~sefl1blyt
DescrIpt1on~
..
~
17 02
0208 Demolish Mesh Reinforced
Concrete to 6”
thick
with Power Equipment
$42.57
c.y.
3.7
c.y.
$157.51
33 10
9505 Remove
Steel/Fiberglass UST, 2,001-5,000 gallon
$3747.00
ea.
I
ea.
$3747.00
Backfill
Material, Transportation and Labor (per EPA)
$20.00
c.y.
25
c.y
$50000
Total Cost:
$4,404.51
RS Means (2004)
-
5,001-15,000
gal UST Removal
A,i~ithl’jl
•~-. .,.:~--.‘-
.. ~. .
Description
.
~
. ...
A
UnitCoSt-Y’,,”.
.~
..~~.~Unjti’
.~
P,.:‘t~
Cost~.i’-;r
17 02
0208 Demolish Mesh Reinforced Concrete to 6” thick with Power
Equipment
$42.57
c.y.
7.1
c.y.
$302.25
33 10
9506
Remove Steel/Fiberglass UST 5.001-15,000 gallon
$5643.00
ea.
1
ea.
$5,643.00
Backfill
Material.
Transportation and Labor (per IEPA)
$20.00
c.y.
75
c.y.
$1,500.00
Total Cost:
$7,445.25
RS Means (2004)
-
15,001-20,000 gal UST Removal
£is.n~y~
.~ ~
Descriptlon-~-
;J.;~
‘..-.
~
~UnltCost~~’t
M1~$c’4..Unlts
.‘. .-... ,- ~.-Cost.~~-
17 02
0208
D~m~lishMesh Reinforced Concrete to 6’ thick with Power Equipment
$42.57
c.y.
8.9
c.y.
$378.87
33 13 9507 Remove Steel/Fiberglass UST, 15,001-20,000 gallon
$6,597.00
ea.
1
ea.
$6,597.00
Backfill Material. Transportation and Labor (per EPA)
$20.00
c.y.
100
c.y.
$200000
Total Cost:
$8,975 87
RS Means (2004)
-
20,000
-
30,000
gal UST Removal
~~~i~fyt
-c~4~Descrlptlon
-A
:
:~-‘,.:,:,‘,
.
-
UnltCost~.:’~-.~
~l..,Pt
Units. ~
17 02 0238 Demolish Mesh Reinforced Concrete to 6” thick
with
Power Equipment
$42.57
c.y.
9.9
c.y.
$421.44
33 10 9508
Remove Steel/Fiberglass UST 20,000-30,000 gallon
$8,364.00
ea.
1
ea
$8,364.00
Backfill Material, Transportation and Labor (per IEPA)
$20.00
c.y.
150
c.y.
$3,000.00
Total Cost:
$11,785.44
--
~-----
~
- -----~-~ - -------- I
ATTACUMENT n
RS Means (2004)
-
Monitor Well Installation Costs for 2”, 4”, 6” and 8” Wells
Construction Cost Based on Depth of Well
Assembly#
-
DescrIptIon ~
Unit Cost
15 feet ‘-20
feet
- -
25
feet
30
feet~
33
2321012”
33 23 2102
33232103
33232105
Beritonite Seal
4” Bentontle SeaL
6” Bentonite Seal
8” Bentonite Seal
39,29
each
98.25
each
157.17 each
216.16 each
39.29
39.29
39.29
39.29
98.25
98.25
98.25
98.25
157.17 157.17 157.17 157.17
216.16 216,16 216.16 216.16
-
-
~
- ‘..‘
--
l5feet 20feet 25feet 30feë~
3323 1401
33 23 1402
33 23 1403
33 23 1403
2”Screen Filter Pack
4” Screen Filter Pack
6” Screen Filter Pack
8” Screen Filter Pack
10.65 /LF
18.79 / LF
27.25 / LF
27.25
I
LF
117,15 117.15 117.15 117.15
206.69 206.69 206.69 206.69
299.75 299.75 299.75 299.75
299.75
299.75
299,75
299.75
i--~:~~~
-
- -
15feet
20
feet
25feet
-
30’fe~~
3323 1801
3323 1802
33 23 1803
33 23 1804
2”WeU Grout (Annular Seal)
4”Well Grout (AnnularSeal)
6” Well Grout (Annular Seal)
8’ Well Grout (Annular Seal)
47,40
/LF
81.87
/LF
120.64
I
LF
160.86
I
LF
47.40
284.40
521.40
758.40
81.87
491.22
900.57
1309.92
120.64
723.84
1327.04
1930.24
160.86
965.16
1769.46
2573.76
-
-.
-~ - ~
~-. -~:~-~‘-
-~ - ‘-‘
l5feet
20feet-
25feet
30fee~
33 23 0101
33 23 0102
33 23 0103
3323 0104
2” Pvc
Sch 40 Well Casing
4” PVC Sch 40 Well Casing
6” Pvc
Sch 40 Well Casing
8”PVCSch4oWellCasing
10.16
/ LF
16.22
I
LF
16.99
I
LF
23.05
/LF
50.80
101.60
152.40
203,20
81.10
162.20
243.30
324.40
84.95
169.90
254.85
339.80
115.25
230.50
345.75
461.00
-
-;~-~‘:
-- --
~
-.
-
15 feet
-
20
feet
-25 feet
30
feet~
33 23 0201
33230202
33 23 0203
33 23
0204
2” PVC Sch 40 Well Screen
4”PVCSch4OWellScreen
6” PVC Sch 40
Well Screen
8” PVC Sch 40 Well Screen
14.28
/ LF
24.17
ILF
30.77
I
LF
42.24
/ LF
142.80
142.80
142.80
142.80
241.70
241.70
241.70
241.70
307.70
307.70
307.70
307.70
422.40
422.40
422.40
422.40
P
‘~~‘.‘::
‘ -.
15 feet
20 feet
25 feet
30 feet”’~
33 23 0301
33 23 0302
33 23 0303
33230304
2” PVC Well Plug
4” PVC Well
Plug
6” PVC Well Plug
8” PVC Well Plug
19.12 each
43.34
each
95.48
each
113.96
each
19.12
19.12
19.12
19.12
43.34
43.34
43.34
43.34
95.48
95.48
95.48
95.48
113.96
113.96
113.96
113.96
—
--
- . -,
-,p~-
:
-
- -
15 feet.
20 feet
-
25 feet
30 feet~
33 23 2211
33 23 2212
33 23 2214
33 23 2214
2” Well Finish Flush (8” x 7.5” MH
w/ Lock Cap)
4” Well Finish Flush (8” x 7.5” MH
w/ Lock Cap)
12”x7.5” Locking Manhole Cover, Watertight
12” x 7.5” Locking Manhole Cover, Watertight
309.97 each
327.38 each
282.41
each
282.41
each
309.97 309.97 309.97 309.97
327.38 327.38 327.38 327.38
282.41
282.41
282.41
282.41
282.41
282.41
282.41
282.41
-..
-
15 feet
20 feet
25 feet
30
feet~
3323 1504
33 23 1504
33 23 1502
33 23 1502
ConcreteSurface Pad (2ftx2ftx4in.)
Concrete Surface Pad (2 ft x 2 ft x 4 in.)
Concrete Surface Pad (4 ft x4 ftx4 in.)
Concrete Surface Pad (4 ft x 4 ft x4 in.)
115.30
each
115.30
each
179.35
each
179.35
each
115.30
115.30
115.30
115.30
115.30
115.30
115.30
115.30
179.35
179.35
179.35
179.35
179.35
179.35
179.35
179.35
- - ~
r~’I”
.- --
‘
15 feet
20 feet
-
25 feet
.
30
feet7~
33 17 0808 Decontaminate Rig, Augers (Rental Equipment)
108.60
day
14.88
19.85
24.81
29.77
15 feet
20 feet
25 feet
30 feet~
2” Monitor Well
Total Cost
856.71 1149.48 1442.24 1735.00
4” Monitor Well
Total Cost
1210.51 1705.93 2201.34 2696.75
6” Monitor Well
Total
Cost
1542.33 2235.45 2928.56 3621.67
8” Monitor Well
Total Cost
1805.02 2729.54 3654.05 4578.56
15 feet
-
20 feet
25 feet
30 f~
2” Monitor Well
Cost Per Ft.
57.11
57.47
57.69
57.83
4” Monitor Well
Cost Per Ft.
80.70
85.30
88.05
89.89
6” Monitor Well
Cost Per Ft.
102.82
111.77
117.14
120.72
8” Monitor Well
Cost Per Ft.
120.33
I 136.48
146.16
152.62
From a 2-inch to a 4-inch well the difference
(ratio)
is:
ItIMt~
1,41
1.48
~I~!
1.53
~!
1.55
From a 2-inch to a 6-Inch well the difference (ratio) is:
1.80
1.94
2.03
2.09
From a 6-inch to an 8-inch well the difference
(ratio)
is:
1.17
1.22
1.25
1.26
From a 4-inch to an 8-Inch well the difference
(ratio)
is:
1.49
1.60
1.66
1.70
RS Means (2004)
-
Monitor Well Abandonment Costs for 2”, 4”. 6” and 8”
Wells
Total Cost
5385.23
$513.65
$642.06
$770.47
33~U~b*9~23 1822 Well
~I
Abandonment, 2” Well
18.11
I
LF
~tsfe~
271.65
t4M~
362.2
452.75
543.3
33
23 1823 Well Abandonment, 4” Well
31.13 /LF
466.95
622.6
778.25
933.9
33 23 1824 Well Abandonment, 6” Well
57.43
I
LF
861.45
1148.6
1435.75
1722.9
33 23 1825 Well Abandonment, 8” Well
89.16 /LF
1337.4
1783.2
2229
2674.8
I
RS Means (2004)
-
Hollow Stem Auger. 8” dia. Borehole 100 ft. Deep Costs
M~Oi~flbiy~# ~
2~Unltc~Ost~
~
33 22 1101 Hollow Stem Auger, 8” dia. Borehole,
100 ft.
24.69
ft.
370.35
493.80
617.25
740.70
33 17 0808
Decontaminate Rig, Augers (Rental Equipment)
108.60
day
14.88
19.85
24.81
29.77
ATTACHMENT C
TASK
BREAKDOWN
METHOD
This document describes the methodology utilized by PIPE members in assessing
alternative values to the “lump sum” payments the Agency proposes to be deemed
“reasonable” in Part 732 and proposed Part 734. The method has been applied to propose
new values to three speci tic areas where the Agency has proposed “lump sums” as the
method for determining what is “reasonable” to be reimbursed for activities related to
UST reimbursement. Specifically, those areas are: Section
845
and Section
Instead ofcoming up with one single weighted average for an hourly cost, PIPE
determined that it would be more appropriate to break UST remediation project personnel
into
5
groups. PIPE then used the method in which Mr. Chappel determined the
S80/Hour average and applied the IEPA’s personnel rates as set forth in its 3’~Errata
sheet to develop the following average hourly rate to applicable categories.
SP
Staff Professional
-
Engineers, Geologists,
Scientists,
and Project Managers
$93.25
LP
Licensed Professional
-
Professional Engineers and Professional Geologists...
$120.00
T
Technician
—
Technicians
$65J)0
OS
Office Staff- Account Technician & Administrative Assistant
$50.00
DC
Draftsperson/CAD
-
DraftspersoniCAD
$60.00
Accepting that a lump sum figure could be applied to those tasks that do not vary widely
in scope, so long as the scope of work necessary to properly complete the task was taken
into consideration, PIPE undertook the following steps:
1. Revised Scope of Work
—
PIPE started with the scope ofwork originally
presented to the IEPA by the Ad-Hoc Workgroup, led by ACEC (formerly CECI).
Various individuals, as well as PIPE, have put that document into evidence in the
Board’s record. PIPE then updated that document, to match the regulations as
proposed. Additionally, for tasks which the Ad-Hoc Workgroup did not have a
scope ofwork, PIPE developed one using similar methodology. The revised
scope ofwork is attached to PIPE’s Public Comments as Attachment “D.”
2. Assignment of Hours/Duties
--
PIPE members then assigned the number of
hours (minimum and maximum) that each believed were necessary to accomplish
the given item. These hours were then summed to obtain a range ofhours in
which it is believed a report can be typically completed. Additionally, each work
line item was assigned to one of the five personnel groups described above,
appropriate to the task being performed. Based on that distribution, a number of
hours were assigned to each personnel grouping for each report.
3. 9O~~percentile
—
The
90th
percentile between the minimum and maximum
number ofhours was calculated, and used, as the lump sum number of hours
needed l’or preparation of these reports. The 90~percentile was chosen based
upon the Agency’s stated desire to have 90 percent ofsubmittals fall within the
lump sum prices set forth, as “reasonable” in Subpart I-I.
4.
Assessment of Cost of Specific Project
--
These hours were then multiplied by
the personnel rates as set forth above, based upon the Agency’s personnel rates,
and summed together. In addition, a lump sum was developed for the direct
expenses detailed (based on current document costs and postage charges as well
as a typical number ofcopies multiplied by a copy per page rate on a previous
EPA rate sheet).
A spreadsheet, which details the above-described process, is attached.
Using a similar methodology, new figures for the half-day rate and travel expenses were
also derived:
Lump Sum Rates for Field Activities
According to Mr. Bauer’s testimony, the majority ofthe field activities forwhich the
IEPA allocated a lump sum rate were based upon having one person on-site. Hearing
testimony and exhibits indicate that OSHA and workload requirements generally mandate
that two personnel are needed on-site during remediation activities. Therefore, utilizing a
version of the method described above, the lump sum rate has been re-calculated and is
based upon having two people on site in the following manner.
IEPA
I person
$80/Hour
4 Hours$70 equipment and supplies
Total
$390/Task
PIPE
I Technician
$65/Hour
4 Hours$70 equipment and supplies
I Professional $93.25/Hour
4 Hours
Total
$703/Task
PIPE submits that these changes should be made to the lump sum rates applicable to field
activities throughout the IEPA’s proposed regulations, including the field activities which
PIPE has outlined in its proposal that were not included in the Agency’s proposal.
Travel Expenses
The Agency has again based its travel upon one person traveling to the site in the manner
as follows:
0 to 29 miles
I person
1 hour $80/hour
$60/day for vehicle
$140
30-59
miles
I person
2 hours $80/hour
$60/day for vehicle
$220
60+ miles
1 person
3 hours $80/hour
$60/day for vehicle
$300
PIPE submits that this formula should be modified in three ways: (1) the travel should be
allocated for 2 people in accordance with OSHA and workload requirements as has been
discussed previously; (2) the personnel rate used to calculate the total should not be a rate
weighted with office/clerical staff rates, but should represent technical/professionals who
will be conducting the work; (3) given testimony that establishes that remediation
companies have UST sites throughout the state, a 60+ mile limitation is not “reasonable.”
As with the Agency proposal, one hour is allocated towards travel for every 30 miles of
one-way travel or fraction thereofand
there is a
$60 day vehicle charge allowed. If two
personnel are considered to be traveling, as better reflects reality, the more “reasonable”
travel reimbursement rates would be as follows:
0-29 miles
$218.25
30-59
miles
$376.50
60-89 miles
$534.75
90-I 19 miles
$693.00
Office Tasks 734
Task ID# Section
Description
IEPA
Hours
Rate
Total
Our Pmposal
Personnel Hours
Rate
Total
1
(a)(1)
EarlyAcuon
12
$ 80.00 $
960.00
OS
8
$
50.00 $
400.00
SP
11
$ 93.25
$ 1,025.75
Totals
19
$ 1,425.75
2
(a)(3)
20 &45
Day Reports
60
$ 80.00 $4,800.00
DC
10
$ 60.00 $
600.00
OS
10
$ 50.00 $
500.00
LP
4
$
120.00
$
480.00
SP
50
$ 93.25
$
4,662.50
Direct
Expenses
$ 200.00 $
200.00
Totals
74
$
6,442.50
3
(b)(1)
Stage 1
20
$ 80.00 $1,600.00
LP
2
$
120.00 $
240.00
OS
6
$
50.00
$
300.00
SP
20
$
93.25
$
1,865.00
Direct Expenses
$
100.00 $
100.00
Totals
28
$ 2,505.00
4
(b)(6)
Stage 1
SICR
20
$
80.00 $ 1,600.00
DC
4
$ 60.00 $
240.00
OS
9
$
50.00
$
450.00
LP
8
$ 120.00 $
960.00
SP
46
$ 93.25 $ 4,289.50
Direct Expenses
$
250.00
$ 250.00
Totals
67
~
6,189.50
5
(b)(2)
Stage2
Plan
40
$ 80.00
$3,200.00
DC
10
$ 60.00 $
600.00
OS
10
$
50.00
$
500.00
LP
8
$ 120.00 $
960.00
SP
21
$ 93.25 $ 1,958.25
Direct Expenses
$
250.00 $
250.00
Totals
49
I
$ 4,268.25
6
(c)(1)
Conventional
CAP
64
$
80.00 $5,120.00
DC
13
$ 60.00
$
780.00
05
12
$ 50.00 $
600.00
LP
8
$
120.00
$
960.00
SP
77
$
93.25
$ 7,180.25
Direct Expenses
$250.00 $
250.00
Totals
110
I
$
9,770.25
7
(c)(4)
Conventional
CACR
64
$
80.00 $5,120.00
DC
16
$ 60.00 $
960.00
OS
15
$ 50.00
$
750.00
LP
12
$ 120.00 $ 1,440.00
SP
59
$ 93.25 $
5,501.75
Direct Expenses
$ 250.00 $
250.00
Totals
102
I
$ 8,901.75
8
(d)(2)
Reimbursement
OS
17
$ 50.00 $
850.00
SP
8
$
93.25 $
746.00
LP
6
$ 120.00 $
720.00
Direct Expenses
$
150.00 $
150.00
Totals
31
I $
2,466.00
9
(d)(1)
New
Project
Startup
05
6
$ 50.00 $
300.00
SP
15
$ 93.25 $ 1,398.75
Totals
21
j $
1,698.75
OS
Office Staff
$
50.00
Used Chappol method & 3rd errata
ti’s
SP
Staff Professional
$ 93.25
DC
Draftsman/CAD
$ 60.00
LP
Licensed Professional
$ 120.00
ATTACHMENT 0
APPENDIX G: SCOPE OF WORK FOR LUMP
SUM ITEMS
732.845 (a) & 734.845 (a)(1)--Early Action UST Removal/Excavation
OSFM Correspondence:
Initial Notification Form preparation and submittal
Application for Removal/Abandonment (one) preparation and submittal to
0/0 for signature
Submit removal/abandonment permit to OSFM
Scheduling
Eligibility and Deductibility Letter preparation and submittal
Amended Notification Form preparation and submittal
Prepare waste profile
(arrange for landfill approval)
Determine EA excavation limits
Arrange for subcontractors (tank removal
contractor,
landfill, backfill, etc.)
Prepare waste manifests (or tracking forms)
Project scheduling
EA extension preparation, submittal and follow up
Prepare site health and safety plan
Call J.U.L.I.E and
I
or municipality for utility locate
732.845
(a)(3) & 734.845(a)(3)--20-Day Certification and 45-Day
Report
Project management and coordination
Prepare 20 Day certification
Prepare one CAD site map
Obtain well records from ISGS and ISWS
Review well records and prepare well location map (25 records within 2,500’)
Obtain local information (ie. Sanbom maps, Aerial overlays, etc.)
Determine expected local site geology (subsurface soil conditions)
Prepare one typical
cross section
Draft 45 Day report (tables and narrative), provide data concerning:
Nature and estimated quantity of release
Surrounding populations
General waterquality
Use
and approx. location of wells potentially affected by the release
General subsurface soil conditions
Locations of subsurface sewers
Climatological conditions
Past, present and potential future land use
What was done to evaluate presence of contamination
Actions taken to prevent further release of substance into environment
Analytical / screening results (in tabular format)
UST information (in tabular format)
Word processing
Prepare and describe photos
45 Day report review by PM or other senior
staff
General correspondence with client and Agency
Project update to client
Mail draft 45 Day report to 0/0 for review and signature
Make copies of final 45 Day report for distribution
Deliver completed 45 Day report to IEPA and 0/0
Prepare Excavation/Sample Location CAD Maps
Review Disposal Documentation
734.845 (b)(1)
Stage
I Site Investigation Plan
Project management and coordination
Prepare (update) site health and ~aIetyplan
Arrange (or drilling contractor
Call J.U.L.I.E and
I
or municipality for utility locate
Determine expected local site geology (subsurface soil conditions)
Evaluate backfill/piping samples to Tier I #‘s
Determine drilling location for soil samples and mw install
Word Processing Report and Budget
Prepare budget
Plan review by PM or other
senior staff
Prepare P.E./P.G. certification of budget
General correspondence with client and Agency
Project update to client
Mail draft plan to o/o for review and signature
Make copies of final report for distribution
Deliver completed report to EPA and 0/0
734.845(b)(6) Stage I Site Investigation Completion Report
Project management and coordination
Executive summary identifying SI objectives and technical approach
Describe history of the site with respect to the release
Describe method(s) for investigating site and surrounding area(s)
Describe observations made while investigating site and surrounding area(s)
Prepare (modify/update) site map of sufficient detail and accuracy to show:
Distance ofat least 1,000 feet around UST (scale 1: 200)
Location of site with respect to section township and range
Property boundaiy lines of the site and other affected properties
Land use of the site and other affected properties
Current and former locations of UST systems (and UST contents)
Locations ofall water supply wells and designated setback zones
On-site and off-site injection and withdrawal wells affected by release
All structures, improvements and significant features affected
Table indicating the setback zone for each water supply well
Contact IEPA Division of Public Water Supply
Contact Illinois Department of Public Health
Contact local health department
Contact local watersupply entity
Site’s regional location, geography, hydrology, geology, hydrogeology, etc.
Existing and potential migration pathways and exposure routes
Current and future land use
Legal description of the site
or reference to plat showing
boundaries
Information regarding site specific sampling activities and methods, including:
Narrative description of field activities
Sample collection information (date, time, method, location, sampler)
Sample preservation and shipment information including QNQC
Chain of custody
Field and lab blank documentation
Analytical and / or screening results in tabular and / or graphic format
Interpretation of the results of the site investigation
Description of the release and evaluation of exposure routes
Description of nature, concentration and extent of indicator contaminants
Site map(s) of sufficient detail and
accuracy to
show:
Location
of each
sample labeled to correspond with analytical results
Extent of indicator contaminants exceeding Tier I objectives
Cross Section showing horz and vert extent of soil or gw
Obtain local information (ie. Sanborn maps, Aerial overlays, etc.)
Prepare (finalize) field notes
Prepare and describe site investigation photos
Prepare (finalize) boring logs and
MW completion reports
Prepare sample(s) for shipment or delivery to lab
Hydraulic conductivity test data analysis from single well (H/C calculation)
Description of physical features that may affect contaminant transport
Comparison of indicator contaminant concentrations to Tier 1 objectives
Determination whether UST system is in regulated recharge area
Demonstration that groundwater investigation is not required (if applicable)
Conclusions including assessment of sufficiency of data in report
Appendices containing references and data sources, logs, lab reports, etc.
SI completion report review by PM or other senior staff
Prepare RE. / P.G. Certification
General correspondence with client and Agency
Project update to client
Mail draft SI Completion report to 0/0 for review and signature
Make copies of final SI Completion report for distribution
Deliver completed report to EPA and 0/0
734.835(b)
(2)
-
Stage 2 Site Investigation Plan
Project management and coordination
Review and Summarize Stage I activities-Executive Summary
Describe activities to be performed during Stage 2 Investigation including:
The degree/extent of soil contamination
The degree/extent of groundwater contamination
The direction and velocity of groundwater flow
Identif~jpotential natural and man made migratoiy pathways
Data Reduction of Stage I activities-Analytical, SB logs, MW Reports
Describe current and post-remediation uses of site and surrounding properties
Provide water
supply well survey documentation including:
Location of community water supply wells and their setbacks
Location and extent of regulated recharge/welihead protection areas
Modeled extent of groundwater contamination exceeding most stringent CUO
Tables listing setbackzones for community supply wells
Documentation of entities contacted to identify potable water supply sources
LPE/LPG certification that water supply survey was properly conducted
Prepare contingency scope of work for boring/mw locations
Determine extent of property boundaries
Prepare (modify / update) CAD map(s)
Prepare (modify
I
update) cross section
Prepare (update) site health and safety plan
Arrange for drilling contractor/scheduling
Call J.U.L.I.E and / or municipality for utility locate
Obtain local information (ie. Sanborn maps, Aerial overlays, etc.)
Prepare (finalize) field notes
Prepare and describe site investigation photos
Prepare groundwater contour map
General correspondence
with client and Agency
Project tracking and update(s) to client
Prepare budget forms
Plan & budget review by PM or other senior staff
Mail draft plan & budget to 0/0
for review
and signature
Make copies of final plan & budget for distribution
Deliver completed plan
& budget to IEPA and 0/0
732.845
(dXI) and 734.845 (c)(I)(A) Conventional (Dig & Haul) Corrective Action Plan
Project management and coordination
Prepare waste profile (arrange for landfill approval)
Mail waste profile to 0/0 for review and signature
Prepare (update) site health and safety plan
Determine limits of excavation
Estimate quantity of contaminated soil to be disposed of
Estimate quantity of “clean’ overburden to be stockpiled (if any)
Draft Corrective Action Plan (tables and narrative), provide:
Description of activities performed to define extent of contamination
Analytical results and cleanup objectives in tabular format
Laboratory reports
Boring logs
Monitoring well logs
Discussion of how corrective action plan shall remediate the release
List of sampling parameters and corresponding remediation objectives
Basis for determining sampling parameters and remediation objectives
Media sampling plan to verify completion of remediation
Current and future use of property
Proposed preventive, engineering and institutional contmls
Schedule forimplementation and projected completion of the- plan
Engineering diagrams, calculations, site maps,
etc.
Site map(s) to scale and oriented north showing:
Soil sample locations
Monitoring well locations
Plume of soil and groundwater contamination
Word processing
Prepare budget forms
CAP &
budget
review
by
PM or other
senior staff
Prepare P.E. / P.G. & 0/0
Budget Certification
General correspondence with client and Agency
Project update to client
Mail draft CAP & budget to 0/0 for review and signature
Make copies of final CAP & budget for distribution
Deliver completed CAP & budget to EPA and 0/0
Arrange for excavator
Arrange for trucking (transportation)
Arrange for backfill
Prepare waste manifests (or tracking forms)
Project scheduling
Call J.UL.I.E and / or municipality for utility locate
732.845(d)(5) and 734.845(c)(6) Corrective Action Completion
Report
for Conventional
Project management and coordination
Prepare CAD map(s)
Draft Corrective Action Completion Report (tables and narrative), provide:
Chronological narrative of corrective action activities
Explanation of how the corrective action activities remediated the release
Discussion of how the remediation objectives were determined
Media sampling and analyticalprocedures to verify completion of remediation
Analytical results and remediation objectives in tabular format
Laboratory reports
Soil boring logs
Monitoring well logs
Laboratory certification
Professional Engineer Certification
Owner! Operator & Property Summary
Photographs documenting corrective action activities
Word processing
Prepare and describe photos
Obtain legal description of property
Obtain property
tax identification number
CACR review by PM or other senior staff
General correspondence with client and Agency
Project update to client
Mail draft CACR to 0/0 for review and signature
Make copies of final CACR for distribution
Deliver completed CACR to IEPA and 0/0
Record NFR letter
Make copies of recorded NFR letter for distribution
Deliver recorded NFR
letter to IEPA and 0/0
Prepare (finalize) field notes
734.845 (d)(2) Reimbursement Tasks
Prepare OSFM eligibility and deductible application
Mail draft eligibility and deductible application to
0/0 for review
and signature
Deliver completed eligibility and deductible application to OSFM and 0/0
Setup reimbursement file
Cost and budget tracking
Draft LUST reimbursement claim request
Reimbursement claim review by PM or other senior staff
Prepare P.E./P.G.
& 0/0 Billing Certification
General correspondence with client and Agency
Mail draft reimbursement claim to 0/0 for review and signature
Make copies of completed reimbursement claim for distribution
Deliver completed reimbursement claim to IEPA and 0/0
734.845 (d)(I)
New
Project Startup
FOIA review/Historical Research
Initial lEPNClient Correspondence
Initial Site Characterization including-Equipment, Personnel and Stock Items
associated with initial site map and characterization of release (includes site visit) - ---~-—-_______________
732.845(b)(1)- Site Classification Work Plan
Project management
and coordination
Physical Soil Classification
-
provide a discussion of the following
scientific publications/geologic maps that will be reviewed
drilling methods, auger types, sampling procedures and devices to be used
basis fordetermining the location of soil borings
justify proposed final soil boring configuration and boring depths
alternate plan in case of auger refusal
how anomalies encountered during drilling are to be handled
how cross contamination between water bearing units will be prevented
Groundwater Investigation
-
provide a discussion of the following
drilling methods used
basis fordetermining location and number of monitoring wells
monitoring well installation procedures
activities taken to prevent cross contamination during well installation
basis for determining well construction materials
basis fordetermining the monitoring well screen depth and screened-interval
monitoring well development procedures
monitoring well sampling procedures
activities taken to prevent cross contamination between groundwater samples
how the proposed final monitoring well configuration provides likelihood-of detecting
migration of groundwater contamination
steps taken to determine flow direction and gw elevation
Discuss how the PE will verify Class Ill GW exists within 200 feet of UST system
Discuss how the PE will identify the location of all community water supply wells within
2500’ and all potable water supply wells within 200 feet and determine if the UST is in
the regulated recharge area of any community water supply well or potable water well
Classification by Exposure Pathway Exclusion -provide a discussion of
the following
Activities to determine the full extent and concentration-of contaminants in soil and/or
groundwater exceeding the Tier I CUO’s
Discussion of tests to be performed to determine whether the following requirements
have been met:
1. attentuation capacity of the soil will not be exceeded for any organic contaminants
2. Soil saturation limit will not be exceeded for any of the organic contaminants
3. contaminated soils do not exhibit any of the reactivity characteristics of hazardous waste
per 35 IAC 7321.123
4. Contaminated soils do not exhibit a pH of ~ 2.0 or 12.5
5.
Contaminated soils which contain as,ba,cd, cc, pb, hg, se or ag (or their associated salts)
do not exhibit any of the toxicity characteristics of haz waste per 35 IAC 721.124
Discussion of how the inhalation exposure route will be evaluated to determine:
1. an insitutional control is in place that requires safety precautions for construction worker
populations and compliance with
t~2
below.
2. any contaminants of concern within 10 feet of land surface or within 10 feet of any man-
made pathway does not exceed Tier 1 CUO’s; or an Agency approved engineered barrier in
place.
Adiscussion of how the soil ingestion exposure route will be evaluated-to determine
that:
1. an institutional control is in place that requires safety precautions forconstruction work
populations and compliance
l~2below:
2. any contaminant of concern within 3 feet of land surface does not exceed Tier 1 CUO’s;
or an Agency approved engineered barrieris in place.
A discussion of how the groundwater ingestion exposure route will be evaluated to
determine the following:
1. the source of the release is not located within the minimum/maximum setback zone or
regulated recharge area of a potable watersupply well:
2.
any area within 2500 feet from the source of the release is restricted under a local
ordinance which prohibits the use of groundwater as a potable supply;
3. the concentration of any contaminat of concern in groundwater within the
minimum/maximum setback zone of a potable watersupply well meets the applicable Tier I
CUO;
4. the concentration of any contaminant of concern in groundwater discharging into a
surface water will meet the applicable surface water qualitystandardper35 IAC Section
302.
Provide a Site map to scale and oriented north showing the following:
UST system and excavation limits
product and dispenser lines
pumps and islands
underground utilities (sewer, gas, water, etc.)
nearby structures (buildings, roads, etc.)
location of the proposed soil borings
location of the proposed monitoring wells
property boundaries
200 foot radius from the UST System
Provide a
chart
indicating the following:
boring identification
depth of boring in feet
number of samples from each boring submitted forgeotechnical analysis
identification of geotechnical test what will be performed on samples
Word Processing
-
SCWP and Budget
Prepare SCWP budget
SCWP review by PM or other senior staff
Prepare P.E./P.G. certification of budget
General correspondence with client and Agency
Project update to client
Mail draft SCWP to o/o for review and signature
Make copies of final SCWP report for distribution
Deliver completed report to IEPA and 0/0
732.845(b)(1)- Site Classification Completion Report
Project management and coordination
Executive summary identifying SCWP objectives and technical approach
Describe history of the site with respect to the release
Describe method(s) for investigatIng site and surrounding area(s)
Describe observations made while InvestigatIng site and surrounding area(s)
Prepare (modify
I
update) site map(s) of sufficIent detail and accuracy to show:
Distance of at least 1,000 feet around UST (scale 1: 200)
Location of site with respect to section township and range
Property boundar,’ lines of the site and other affected properties
Land use of (he site and other affected properties
Current and former locations of UST systems (and UST contents)
Locations of all water supply wells and designated setback zones
On-site and off-site injection and withdrawal wells affected by release
All structures, improvements and significant features affected
Table indicating the setback zone for each water supply well
Contact IEPA Division of Public Water Supply
Contact Illinois Department of Public Health
Contact local health department
Contact local water supply entity
Site’s regional location, geography, hydrology, geology, hydr-ogeo!ogy,
etc..
Existing and potential migration pathways and exposure routes
Current and future land use
Legal description of the site or reference to plat showing boundaries
Information regarding site specific sampling activities and-methods, including:
Narrative description of field activities
Sample collection information (date, time, method, location, sampler)
Sample preservation and shipment information including QA/QC
Chain of custody
Field and lab blank documentation
Analytical and / or screening results in tabular and
I
or graphic format
Interpretation of the results of the site investigation
Description of the release and evaluation of exposure routes
Description of nature, concentration and extent of indicator contaminants
Site map(s) of sufficient detail and accuracy to show:
Location of each sample labeled to correspond with analytical results
Extent of indicator contaminants exceeding Tier I objectives
Cross Section showing horz and vert extent of soil or gw
Obtain local information (ie. Sanborn maps, Aerial overlays, etc.)
Prepare (finalize) field notes
Prepare and describe site investigation photos
Prepare (finalize) boring logs and MW completion reports
Prepare GW sample(s) for shipment or delivery to lab
Hydraulic conductivity test data analysis from single well (H/C calculation)
Description of physical features that may affect contaminant transport
Comparison of indicator contaminant concentrations to Tier I objectives
Determination whether UST system is in regulated recharge area
Demonstration that groundwater investigation is not required (if applicable)
Conclusions including assessment of sufficiency of data in report
Appendices containing references and data sources, logs, lab reports, etc.
SCCR completion report review by PM or other senior staff
Prepare P.E.
I
P.G. Certification
General correspondence with client and Agency
Project update to client
Mail draft SCCR Completion report to 010 for review and signature
Make copies of final SCCR Completion report for distributIon
Deliver completed report to IEPA and 0/0 _______________________________
Low Priority Ground Water Monitoring Plan
Project management and coordination
Draft LP GW monitoring plan (tables and narrative), provide data concerning:
Proposed time table forwellinstallation, sampling and report submittal
Discussion of monitoring well development procedures
Discussion of monitoring well sampling procedures
Activities that will be taken to prevent sample cross-contamination
Adequacy of the monitoring well configuration to detect contaminantmigration
Treatment type applied to any discharge and effluent quality expected
Steps taken / required to obtain necessaiypermits for discharge
Final disposition of recovered free product
Site map(s) to scale and oriented north showing:
UST
system(s)
and excavation
Product and dispenser lines
Pumps and islands
Underground utility lines (sewer, gas, water, etc.)
Nearby structures (buildings, roads, etc,)
Location of soil boring(s)
Location of monitoring well(s)
Property boundaries
Radius of 200 feet from the excavation
Word processing
Prepare budget forms
LP GW monitoring plan & budget review by PM or other senior staff
General correspondence with client and Agency
Project update to client
Mail draft LP GW monitoring plan & budget to 0/0 for review and signature
Make Copies of final LP GW monitoring plan & budget for distribution
Deliver completed LP GW monitoring plan & budget to IEPA and 0/0
Low Priority Ground Water Monitoring Report SOW
Project management and coordination
Draft LP GW monitoring plan (tables and narrative), provide data concerning-:
Description of implementation & completion of all elements of plan
Description of well development, sample collection, preservation & analysis
Analytical results in tabular format
Copies oflaboratory reports
Copies of laboratory certifications
Ground water elevations in tabular format
Monitoring welllogs
Completed chain-of-custody form(s)
Site map(s) to scale and oriented north showing:
UST system(s) and excavation
Product and dispenser lines
Pumps and islands
Underground utility lines (sewer, gas, water, etc.)
Nearby structures (buildings, roads, etc,)
Location of monitoring well(s)
Direction of groundwater flow (groundwatercontouring)
Property boundaries
Radius of 200 feet from the excavation
Word processing
LP GW monitoring report review by PM or other senior staff
General correspondence with client and Agency
Project update to client
Mail draft LP GW monitoring report to 0/0 for review and signature
Make copies of final LP GW monitoring report for distribution
Deliver completed LP GW monitoring report to IEPA and 0/0