ILLINOIS POLLUTION CONTROL BOARD
September 16, 2004
COMMONWEALTH EDISON,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
04-219
(UST
Appeal)
ORDER OF THE BOARD (by J.P. Novak):
On June 17, 2004, at the parties’ request, the Board extended until September 8, 2004, the
time period for Commonwealth Edison to appeal a May 4, 2004 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
101.300(b), 105.402, 105.406. The Agency rejected petitioner’s site classification completion
report for Commonwealth Edison’s leaking underground petroleum storage tank facility located
at 2601 North 21st Road, Marseilles, LaSalle County. Because petitioner failed to timely file an
appeal, the Board dismisses this case and closes the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on September 16, 2004, by a vote of 5-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board