ILLINOIS POLLUTION CONTROL BOARD
August 19, 2004
PREMCOR REFINING GROUP, INC.,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
05-25
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On August 9, 2004, the parties timely filed a joint notice to extend the 35-day period
within which Premcor Refining Group, Inc. (Premcor Refining Group) may appeal a June 30,
2004 determination of the Illinois Environmental Protection Agency (Agency).
See
415 ILCS
5/40(a)(1) (2002); 35 Ill. Adm. Code 105.402, 105.406. Because the postmark date of the joint
request is within the time for filing, the joint request was timely filed. 35 Ill. Adm. Code
101.300(b)(2), 105.404. The Agency rejected petitioner’s high priority corrective action plan for
Premcor Refining Group’s leaking underground petroleum storage tank facility located at 600
South Main Street, in Morton, Tazewell County.
The Board extends the appeal period until November 3, 2004, as the parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Premcor Refining Group fails to file
an appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on August 19, 2004, by a vote of 4-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board