ILLINOIS POLLUTION CONTROL BOARD
August 19, 2004
TED HARRISON OIL COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
05-18
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On August 5, 2004, the parties timely filed a joint notice to extend the 35-day period
within which Ted Harrison Oil Company may appeal a June 28, 2004 determination of the
Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill.
Adm. Code 105.402, 105.406. Because the postmark date of the joint request is within the time
for filing, the joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The
Agency rejected petitioner’s high priority corrective action plan budget for Ted Harrison Oil
Company’s leaking underground petroleum storage tank facility located at Springfield and Main,
in Virginia, Cass County.
The Board extends the appeal period until November 2, 2004, as the parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Ted Harrison Oil Company fails to
file an appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on August 19, 2004, by a vote of 4-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board