ILLINOIS POLLUTION CONTROL BOARD
June 17, 2004
TELZROW OIL COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
04-217
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On June 9, 2004, the parties timely filed a joint notice to extend the 35-day period within
which Telzrow Oil Company may appeal a June 8, 2004 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency rejected
petitioner’s high priority corrective action plan for Telzrow Oil Company’s leaking underground
petroleum storage tank facility located at Main and Park Streets, Hardin, Calhoun County. The
Board extends the appeal period until September 7, 2004, as the parties request.
See
415 ILCS
5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Telzrow Oil Company fails to file an appeal on
or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on June 17, 2004, by a vote of 5-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board