ORDER OF THE BOARD (by J.P. Novak):
On May 19, 2004, the parties timely filed a joint notice to extend the 35-day period
within which 2 F, Inc. (2 F) may appeal an April 9, 2004 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency approved
petitioner’s high priority corrective action plan, with modifications, for 2 F’s leaking
underground petroleum storage tank facility located at 1011 West Poplar, Harrisburg,
Williamson County. The Board extends the appeal period until August 16, 2004, as the parties
request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If 2 F fails to file an
appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on June 3, 2004, by a vote of 5-0.
Dorothy M. Gunn, Clerk