1. J Ra~idIeSchick,
      2. ILLINOiS ENVIRONMENTAL PROTECTION AGENCY
      3. Page 2
      4. Re: LPC#0316525013--CookCounty

CLEHK’S
OFFICE
J
Ra~idIeSchick,
L
..
OlLCounsel
~S 26 200L
Hodge Dwyer Zeman
STATE OF ILLINOIS
3150 Roland Avenue
:I,Jtion Control Bo~r~.
Springfield, Illinois 62705-5776
Februrary24,2004
0(I~~
Clerk of the Board
Illinois Pollution Control Board
Attn: John Therriault
1
00 West Randolph Street
Suite
11-500
Chicago, Illinois 60601
Re: Exhibits to Great Lakes Dredge and Dock’s
Petition for Review
Dear Sir:
Thank you for alerting me to the missing exhibits by your phone call today. Ihave
enclosed an original Exhibit A and Exhibit B and nine copies of each to attach to the
Petition and copies we sent you.
Yours truly,
J. Randle Schick

1\.flr\
ii
~
q
fr~I1~LI~4OT~ PbLLUTION CONTROL BOARD
Ii
GREATLAK~S±REI~8~,~\L-j)
DOCK COMIPAI’~Z, e~Jey
)
Corporation,
)
)
Petitioner,
)
v.
)
PCBNo.
____
)
ILLiNOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
)
PETITION FOR
REVIEW
OF AGENCY DETERMINATION
REGARDING BUDGET AMENDMENT #001 OF THE SITE
INVESTIGATION BUDGET AND THE CORRECTIVE ACTION PLAN
NOW COMES Petitioner, GREAT LAKES DREDGE & DOCK COMPANY
(“Petitioner”), by and through its attorneys, HODGE DWYER ZEMAN, and pursuant to
Sections 40 and 57.7(c)(4)(D) ofthe Illinois Environmental Protection Act (“Act”) (415
ILCS
5/40
and 5/57.7(c)(4)(D)), and 35 Ill. Admin. Code Part 105, hereby requests
review ofthe decision by the Respondent, Illinois Environmental Protection Agency
(“Agency”), regarding Petitioner’s Amended Site Investigation Budget and Corrective
Action Plan. In support ofthis Petition, the Petitioner states as follows:
1.
Petitioner is the owner of certain property located at 9320 South Ewing
Avenue, Chicago, Illinois, hereinafter referred to as “the site.”
2.
Petitioner is the owner ofunderground storage tanks (“USTs”) formerly
located at the site.
1

ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
1021
NORTH GRAND AVENUE EAST,
P.O.
Box
19276,
SPRINGcIELD, ILLINOiS
62794-9276. 21 7-782~3397
JAMES
R.
THOMPSON
CEr~rrER,100
WEST
RANDOLPH,
Suiii
11-300,
CHCACO,
IL 60601, 312-814-6026
ROD R.
BLACOJEVICH, GOVERNOR
RENEE
CIPRIANO, DIRECTOR
217/782-6762
CERTIFIED
MAIL
7002 3150 0000 1227 6198
JAN 1~2Ofl4
Great
Lakes Dredge & flock
Attention: Glenn Dawson
9320 South Ewing Avenue
Chi~ago,.Jllinois60617
Re:
LPC#031•6525013--CookCoun~
Chicago / Great Lakes Dredge & Dock
9320 South Ewing Avenue
LUST Incident No. #921587
LUST Technical File
Dear Mr. Dawson:
The Illinois Environmental Protection Agency (Illinois EPA) has reviewed the l~Amendment to
the Site Investigation Budget (budget) submitted for the above-referenced incident. This budget,
dated October 2003,
was
received by the Illinois EPA on October 14, 2003. Citations in this
letter are from the Environmenial Protection Act (Act), as amended by Public Act
92-0554
on
June 24, 2002, and 35 Illinois Administrative Code
(35
Ill. Adm. Code).
The budget is rejected for the reason(s) listed in Attachment A (Section
57.7(a)
and 57.7(c)(4) of
the Act and 35111. Adrn. Code 732.503(b)).
All future correspondence must be submitted to:
Illinois Environmental Protection Agency
Bureau of Land
--
#24
Leaking Underground Storage Tank Section
1021 North Grand Avenue East
Post Office Box 19276
Springfield, IL 62794-9276
Please submit all correspondence in duplicate and include the Re: block shown at the beginning
ofthis letter.
3)02
N~nh
M,lin
~
Ro~k(orcl.
It 4,1 101
— 1615)
9e7.7760
-
015
~
951 1 W,
H~rr~5Qr,
5t.~~
PI~,ne,.IL 60016— (847) 294-400’~
-
S~SSowh Si.’tc Ei~zn.IL 601 fl
(837)6.08.3131
Pto~i.~—
5415 N. Uriver5Iiy 51,, Peoria, IL 61614 —(309) 693.5463
~ ~
Prssi~i.~
~62()N
(‘r,~s1..cIlvSi.. ~
IL 61614
(309) 6~).54&2
CHA~PAICN
2125 South Firct
Slreet,
Champa~gr,IL 61820 —(217) 27t
S~’IW~).IiiII) —
45)11)
S. Si’cth Str,’~’tRi)
.
Spiin~iii~ic).it 6270k
217) 786•1s892
COUI~JSVILLI
—2009 MalI
Srreet.
Collir,sville, fl.
~‘“
—16
?“~
5.51 ‘))
2309W.
M4Ifl
SI.. Suite 116,
M,anor,. IL
62959 —(618) 993.7200
)“~‘ REI.V~LE~
PAPER
FEB—~6--2O~41~:45

Page 2
An underground storage tank system owner or operator may appeal this decision to the Illinois
Pollution Control Board. Appeal rights are attached.
Ifyou have any questions or need further assistance, please contact the Illinois EPA project
manager, Eric Kuhiman, at 217/785-5715.
Sincerely,
any A. Chappel, P.E.
.
Unit Manager
Leaking Underground Storage Tank Section
Division of Remediation Management
Bureau of Land
HAC:EK:EK\
Attachment: Attachment A
Appeal Rights
C:
Remediatiort Technologies, LTD
Division File
I
FFPl—~R--2L’Ifl~
1fl:4~
P.04

Attachment A
Re:
LPC#0316525013--CookCounty
.
Chicago / Great Lakes Dredge & Dock
.9320 South Ewing Avenue
LUST Incident No. #92
1587
LUST Technical File
Citations in this attachment are from the Environmental Protection Act (Act), as amended by
Public Act
92-0554
on June 24, 2002, and 35 Illinois Administrative Code
(35
Iii. Adm. Code).
1.
The Illinois EPA has determined that these costs are for activities in excess of those
required to meet the minimum requirements ofTitle XVI ofthe Act (Section
57.7(c)(3)
of the Act and 35 Ill. Adm. Code 732.505(c)). Costs for activities and associated
th~~ialsor services exceeding the minimum requirements necessary to comply with the
Act are not eligible forreimbursement from the Fund
(35
Ill. Adm. Code 732.606(o)). It
has also been determined that the costs are site investigation costs. In addition, Costs for
corrective action activities and associated materials or services exceeding the minimum
requirements necessary to comply with the Act are not eligible for reimbursement from
the Fund. (Section
57.7(c)(3)
of the Act and 35 111. Adrn. Code 732.505(c), 732.606(hh)
and 732.606(o)).
2.
The budget includes costs for adiitional soil borings and groundwater monitoring wells.
These costs are for activities in excess ofthose required to meet the minimum
requirements of Title XVI of the Act (Section
57.7(c)(3)
of the Act and 35 Ill. Adm.
Code 732.505(c) arid 732.606(o)).
3.
Costs for investigative activities and related services or materials for developing a
practicescorrectiveoractionunreasonableplan
thatcostsare unnecessaryforjustifiableor
activities,inconsistentmaterials,with
generallyor
servicesacceptedare
ineligible. The budget includes such costs. These costs are for activities in excess of
those required to meet the minimum requirements ofTitle XVI of the A.ct..(Sectio.n
57.7(c)(3) of the Act and 35 Ill. Mm. Code
132,505(c)
~.nd732.606(o)) and/or are not
re~onableas submitted (Section 57.7(c)(3) ofthe Act and 35 Ill. Adm. Code 732.505(c)
and 732.606(hh)).
EK:EK\
~
in:~
99~
P.03

ILLINOiS ENVIRONMENTAL PROTECTION AGENCY
1021 NORTH GRAND AVENUE EAST, P.O. 6o~19276~ SPRINOF~LD,ILLINOIS 62794-9276, 217-782-3397
JAMES
R.
THOMPSON
CENTER, TOO
W~rsr
RANDOLPH, SUITE 11-300, CHIcAGO,
II.
60601, 312-814-6026
ROD
R.
BLA.GOJEVICH, GOVERNOR
RENEE CIPRIANO, DIRECTOR
217/782-6762
CERTIFIED
MAIL
7002 3150
0000 1255 U’i53
FER0920a4.
.
:1
Great Lakes Dredge & Dock
Attention: Glenn Dawson
9320 South Ewing Avenue
Chicago, Illinois 60617
Re:
LPC#0316525013--CookCounty
Chicago / Great Lakes Dredge & Dock
9320 South Ewing Avenue
LUST Incident No. #921587
LUST Technical File
Dear Mr. Dawson:
The Illinois Environmental Protection Agency (Illinois EPA) has reviewed the Corrective Action
Plan (plan) submitted for the above-referenced incident. This plan, dated October 24, 2003, was
received by the Illinois EPA on October 30, 2003. Citations in this letter are from the
Environmental Protection Act (Act), as amended by Public Act
92-05
54 on June 24, 2002,
and
35 Illinois Administrative Code
(35
III. Adm. Code).
Pursuant to Sections 57,7(b) and
57.7(c)(4)
ofthe Act and 35111. Adrn. Code 732.503(b), the
Corrective Action Plan is rejected for the reasons listed in Attachrrient A.
Pursuant to Sections 57.7(c)(4)(D) ofthe Act and 35 111. Adm. Code 73
2.503(b),
the associated
budget is rejected for the reasons listed in Attachment B.
Pursuant to Sections 57.7(b) and 57.12(c) and (d) of the Act and 35 Iii. Adm. Code 732.100 and
732.105, a plan andlor budget must be submitted within Days
days ofthe date ofthis letter to:
Illinois Environmental Protection Agency
Bureau zfL.and
-
#24
Leaking Underground Storage Tank Section
1021 North Grand Avenue East
Post Office Box 19276
Springfield, IL 62794-9276
—.
4302
N)rlh M.~i’i
~lt(,~,’).
~flCk~(Wd.ft
E~1
ic~
— (P15) 9((7.~’7~)
• ~r’
I’I\IN)S— 951)
W. Fj,~r,t~on5),, !)(‘~
PI,~n~’.
IL
P0UI(
..
I~47)294.40)
s~s
‘~u)h
s’~
~
U)~7)
c)).:))
:31
— I~
~
.
54
~
N.
U
t~,tySI., I’~toria,IL
~,1
614
(309)
)~4.3.5463
I)~jir..v.
~i’
T,wi~
..
..
762)) N.
j’~’~rt~
Si., ‘~r~a,
ft
~
.~(9),3J.5•~b~
Cii.
v~i~
2)23 S~utI,
F~r~I$Ir~,C’.han,p~
si’K~c,:rFI) ....
451)0. S~th5ir~:iRd.,
~,
inR(t~)d,I). ~27U~, —
2 7)
~(,
lW).)
Cull
i~i~’l~
...
10Q~)MM) SIre~.?I,(:()IIir,~)II~,)~
M,~I()N— ~30~
W.
M,~ii~
$1.. S~iit
i~.M~ik1i, Ii
b2’~39
lift 4’~I
p200
‘tCIN III’’
Ri VII! I)
I’i’i
‘t
rrri
4 4
‘~iflfl4
A
a
.
-,

Page 2
Please submit all correspondence in duplicate and
include the Re: block
shown
at
the
beginning
of this letter.
An underground storage tank system owner or operator may appeal this decision to the Illinois
Pollution Control Board. Appeal rights are attached.
Ifyou have any questions or need further assistance, please contact the Illinois EPA project
manager, Eric Kuhiman, at
217/785-5715.
ancere y,
arry A. Chappel, P.E.
tJntt Manager
Leaking Underground Storage Tank Section
Division ofRemediation Management
Bureau ofLand
HAC:EK:EK\
Attachment: A and B
Appeal Rights
C:
Remediation Technologies, Ltd
Division File
~~_1l_)(~!7L’1
1A~~l
p~3

Attachment A
Re:
LPC #03 16525013
--
Cook
County
Chicago / Great
Lakes Dredge & Dock
9320 South Ewing Avenue
LUST Incident No.
#921587
LUST
Technical File
Citations in this attachment are from the Environmental Protection
Act
(Act) and 35 Illinois
Administrative Code (35 Ill. Adm. Code).
1.
The
plan
does not
address the soil contamination encountered
by S-1O
beneath
the
former
puxt~pisland along the northern wall
of
the former paint shop. Therefore,
the Illinois EPA
will require the soil contamination beneath the former pump island
be
remediated.
2.
The plan also includes investigative activities and related services
or
materials for
developing this corrective action plan, which are not necessary or inconsistent with
generally accepted practices. Since these activities are in excess ofthose required to meet
the minimum requirements of the Act, they are therefore, unreasonable and ineligible for
reimbursement from the Fund (Section 57.7(c)(3) of the Act and 35 Iii. Adm. Code
73
2.505(c),
732.606(o), and 732.606(hh)).
3.
The plan also includes the excavation ofcontaminated soil that the Illinois EPA believes
to be unrelated to the above-referenced site. For the purpose.ofreimbursement, since
these activities are in excess ofthose necessary:to meet the minimum requirements of
Title XVI of the Act; costs for such activities are not reimbursable (Section
57.5(a)
ofthe
Act and 35 Ill. Adm. Code 732.606(o)).
EK:EK\
FFIR—11—2m4
14:51
P.04

Attachment B
Re:
LPC#0316525013--CookCounty
Chicago / Great Lakes Dredge &
Dock
9320 South
Ewing Avenue
LUST Incident No. #921587
LUST
Technical File
Citations
in
this attachment are from the Environmental
Protection Act (Act), as amended by
PublicAct
92-0554
on June 24, 2002,
and
35
Illinois Administrative Code
(35 UI
Adm Code)
1.
The Illinois EPA has not approved the plan with
which the budget is associated.
Therefore, the Illinois EPA
cannot determine
whether these costs are for activities in
excess ofthose required to meet the minimum requirements ofTitle XVI ofthe Act
(Section
57.7(c)(3)
ofthe
Act and
35 Ill. Adm. Code
732.505(c)).
Costs
for corrective
action activities and associated materials
or services exceeding the minimum
requirements necessary
to comply with the Act
are
not eligible for reimbursement from
the Fund
(35
III. Adm. Code 732.606(o)). It also
cannot
be
determined whether
the costs
are
corrective action costs. “Corrective action”
means an
aôtivity
associated
with
compliance with
the provision ofSection
57.6
and
57.7 of the Act
(Section 57.2
ofthe
Act and
35
Iii. Adm. Code 732.103). One
ofthe eligibility requirements for accessing
the Fund
is
that costs are associated with “corrective action” (Section
57.9(a)(7)
ofthe
Act and
35
Ill. Adm. Code
732.505(c)).
In addition, it cannot be determined whether
these costs are reasonable as submitted (Section
57.7(c)(3~
of the Act and 35 Ill. Adm.
Code
732.505(c)
and 732.606(hh)).
EK:EK\

Back to top