ILLINOIS POLLUTION CONTROL BOARD
February 5, 2004
BROCK OIL COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 04-129
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On January 20, 2004, the parties timely filed a joint notice to extend the 35-day period
within which Brock Oil Company may appeal a December 9, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency rejected
the high priority corrective action plan for Brock Oil Company’s leaking underground petroleum
storage tank facility located at 601 North Clinton Street, Bloomington, McLean County. The
Board extends the appeal period until April 13, 2004, as the parties request.
See
415 ILCS
5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Brock Oil Company fails to file an appeal on or
before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on February 5, 2004, by a vote of 4-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board