ILLINOIS POLLUTION CONTROL BOARD
    February 5, 2004
     
    BOYE NEEDLE FACILITY,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
      
    PCB 04-128
    (UST
    Appeal)
    (90-Day
    Extension)
     
    ORDER OF THE BOARD (by J.P. Novak):
     
    On January 26, 2004, the parties timely filed a joint notice to extend the 35-day period
    within which Boye Needle Facility may appeal a December 18, 2003 determination of the
    Illinois Environmental Protection Agency (Agency).
    1
      
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill.
    Adm. Code 105.402, 105.406. Because the postmark date of the joint request is within the time
    for filing, the joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The
    Agency approved petitioner’s request for reimbursement from the UST Fund, with
    modifications, for Boye Needle Facilitys’ leaking underground petroleum storage tank facility
    located at 4343-4357 North Ravenswood, Chicago, Cook County. The Board extends the appeal
    period until April 22, 2004, as the parties request.
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm.
    Code 105.406. If Boye Needle Facility fails to file an appeal on or before that date, the Board
    will dismiss this case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on February 5, 2004, by a vote of 4-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board
    1
    Pioneer Engineering & Environmental Services filed with the Board on January 20, 2004, a
    copy of its request to the Agency on behalf of Boye Needle Facility for an extension of the 35-
    day filing period.

    Back to top