ILLINOIS POLLUTION CONTROL BOARD
    March 22, 1990
    CITY OF POLO,
    )
    )
    Petitioner,
    )
    V.
    )
    PCB 90—39
    )
    (Provisional Variance)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD (J. Marlin):
    This matter comes before the Board on receipt of an Agency
    Recommendation dated March 20, 1990. The recommendation refers
    to a request from Petitioner, City of Polo, for a 45-day
    provisional variance from effluent 5-day biochemical oxygen
    demand (BOD5) and suspended solids (TSS) limitations, as set
    forth in 35 Iii. Adm. Code 304.120(c), for the period beginning
    from when the City removes its final clarifier from service, on
    or about April 2, 1990, and lasting for a period of 45 days.
    Upon receipt of the request the Agency issued its
    recommendation, concluding that the failure to grant the
    requested 45—day provisional variance would impose an arbitrary
    or unreasonable hardship on Petitioner.
    The City operates a wastewater treatment facility that
    discharges to Buffalo Creek, a tributary of Elkhorn Creek, in the
    Rock River basin. The present effluent limits for its discharges
    are 10 mg/i BOD5 and 12 mg/i TSS (monthly averages. The City
    must remove its final clarifier from service for repairs. The
    Agency agrees that this is necessary. During the time the final
    clarifier is down, the City’s plant will operate the remaining
    equipment, primary settling, the con-tminutor, a trickling filter,
    a polishing lagoon, and disinfection, providing primary and
    secondary treatment with disinfection.
    The Agency does not believe that the requested relief will
    have any adverse impact on any downstream public water supply.
    The Agency is not aware of any federal law that would preclude
    the requested relief. The Agency agrees with the City that any
    environmental impact of this provisional variance would be
    minimal. The Agency recommends that the Board grant the
    requested provisional variance with conditions.
    In light of the Agency Recommendation, the Board hereby
    grants a provisional variance from 35 Ill. Adm. Code 304.120(c)
    from the date the City of Polo removes its final clarifier from

    I
    service and continuing for 45 days after that date, with the
    following conditions:
    1. The term of this provisional variance shall commence on
    the date the City of Polo removes its final clarifier from
    service, and it shall expire after the 45th day following
    the date of such removal from service;
    2. During the term of this provLsional variance, the
    effluent from the City of Polo’ treatment plant shall not
    exceed concentrations of 45 mg/i BOD5 and 60 mg/l TSS;
    3. During the term of this provisional variance, the City
    of Polo shall collect samples and analyze them according to
    the terms of NPDES permit number IL0030449, and report them
    to the Agency on its monthly discharge’ monitoring reports;
    4. The City of Polo shall notify Dennis Connor of the
    Agency’s Rockford office by telephone, at 815-987-7755, when
    the final clarifier is removed from service and when the
    work is completed, and the City shall confirm this notice in
    writing within five days, addressed as follows:
    Illinois Environmental Protection Agency
    Division of Water Pollution Control
    Compliance Assurance Section
    2200 Churchill Road
    P.O. Box 19276
    Springfield, Illinois 62794—9276
    Attention Mark Brooks
    5. During the term of this provisional variance, the City
    of Polo shall operate its plant in a manner that assures
    that it discharges the best quality effluent practicable;
    and
    6. The City shall execute a copy of a Certificate of
    Acceptance of this provisional variance and forward that
    copy to the Agency addressed as indicted in condition 4; the
    City shall forward that copy within 10 days of the date of
    this Order of the Board, i.e., on or before April 2, 1990;
    and the Certificate of Acceptance shall take the following
    form:

    CERTIFICATION
    I (We), ______________________________
    hereby accept and agree to be bound by all terms
    and conditions of the Order of the Pollution
    Control Board in PCB 90-39, March 22, 1990.
    Petitioner
    Authorized Agent
    Title
    Date
    IT IS SO ORDERED.
    J. Dumelle concurred.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, do hereby certif~that the above Order was adopted on the
    ~2”
    ~day of ___________________________, 1990, by a vote of
    7-0
    Dorothy M)Gunn, Clerk
    Illinois Pollution Control Board

    Back to top