ILLINOIS POLLUTION CONTROL BOARD
October 2, 2003
COOPER OIL COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 04-38
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by T.E. Johnson):
On September 25, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Cooper Oil Company may appeal an August 25, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is the
Agency’s denied reimbursement of requested corrective action costs for Cooper Oil Company’s
leaking underground petroleum storage tank facility located at 624East North Avenue, Flora,
Clay County. The Board extends the appeal period until December 22, 2003, as the parties
request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Cooper Oil Company
fails to file an appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on October 2, 2003, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board