ILLINOIS POLLUTION CONTROL BOARD
    November 6, 1997
    BORDEN CHEMICALS AND PLASTICS
    OPERATING LIMITED PARTNERSHIP,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-102
    (Variance - Water)
    JAMES F. WARCHALL OF SIDLEY & AUSTIN APPEARED ON BEHALF OF
    PETITIONER; and
    MARGARET P. HOWARD OF THE ILLINOIS ENVIRONMENTAL PROTECTION
    AGENCY APPEARED ON BEHALF OF RESPONDENT.
    OPINION AND ORDER OF THE BOARD (by M. McFawn):
    This matter comes before the Board on the “Verified Amended Petition for Variance”
    (Petition or Pet.) filed by Borden Chemicals and Plastics Operating Limited Partnership
    (Borden). Borden seeks a variance, for a term of five years, from the general use water
    quality standards for temperature set forth at 35 Ill. Adm. Code 302.211(b)-(e) and 35 Ill.
    Adm. Code 304.105, which prohibits violation of water quality standards by effluent from
    Borden’s chemical plant in Illiopolis, Illinois.
    The Board's jurisdiction and authority in this matter arise from the Environmental
    Protection Act (Act), 415 ILCS 5 (1996). The Board is charged therein with the responsibility
    to “grant individual variances beyond the limitations prescribed in this Act, whenever it is
    found upon presentation of adequate proof, that compliance with any rule or regulation,
    requirement or order of the Board would impose an arbitrary or unreasonable hardship.” 415
    ILCS 5/35(a) (1996). The Illinois Environmental Protection Agency (Agency) is charged,
    among other things, with the responsibility of investigating each variance petition and making
    a recommendation to the Board as to the disposition of the petition. 415 ILCS 5/37(a) (1996).
    For the reasons set forth herein, the Board finds that Borden has presented adequate
    proof that immediate compliance with the regulations at issue would result in the imposition of
    an arbitrary or unreasonable hardship. Furthermore, there are no applicable federal laws or
    regulations which preclude the variance. Accordingly, the variance will be granted, subject to
    the conditions set forth in the Order below.

    2
    PROCEDURAL HISTORY
    The original petition in this matter was filed with the Board on December 11, 1996.
    Over the next several months, Borden and the Agency met on several occasions regarding
    information sought by the Agency, and on July 11, 1997, Borden filed its
    “Verified Amended
    Petition for Variance.”
    The Agency filed a recommendation in response to the Petition on
    August 11, 1997, wherein the Agency recommended that the variance be granted.
    Borden waived a hearing in this matter. On January 21, 1997, however, the Board
    received a letter of objection to the granting of a variance to Borden. By an order adopted
    January 23, 1997, the Board directed that this matter go to hearing. A hearing was held in
    Springfield, Illinois, on September 11, 1997, before Hearing Officer Deborah Frank Feinen.
    At the hearing, only Borden introduced evidence. No evidence was presented contrary to the
    assertions in the Petition or the testimony of Borden’s witnesses.
    STATUTORY AND REGULATORY FRAMEWORK
    In determining whether any variance is to be granted, the Act requires the Board to
    determine whether a petitioner has presented adequate proof that immediate compliance with
    the Board regulations at issue would impose an arbitrary or unreasonable hardship. 415 ILCS
    5/35(a) (1996). Furthermore, the burden is upon the petitioner to show that its claimed
    hardship outweighs the public interest in attaining compliance with regulations designed to
    protect the public. Willowbrook Motel v. IPCB, 135 Ill. App. 3d 343, 481 N.E.2d 1032, (1st
    Dist. 1977). Only with such a showing can the claimed hardship rise to the level of arbitrary
    or unreasonable hardship.
    A further feature of a variance is that it is, by its nature, a temporary reprieve from
    compliance with the Board's regulations and compliance is to be sought regardless of the
    hardship which the task of eventual compliance presents an individual polluter. Monsanto Co.
    v. IPCB, 67 Ill.2d 276, 367 N.E.2d 684 (1977). Accordingly, except in certain special
    circumstances, a variance petitioner is required, as a condition to the granting of a variance, to
    commit to a plan which is reasonably calculated to achieve compliance within the term of the
    variance.
    In this case, Borden seeks a variance from 35 Ill. Adm. Code 302.211(b) through (e)
    and 304.105. Section 302.211 provides in relevant part:
    b)
    There shall be no abnormal temperature changes that may
    adversely affect aquatic life unless caused by natural
    conditions.
    c)
    The normal daily and seasonal temperature fluctuations
    which existed before the addition of heat due to other than
    natural causes shall be maintained.

    3
    d)
    The maximum temperature rise above natural
    temperatures shall not exceed 2.8ºC (5ºF).
    e)
    In addition, the water temperature at representative
    locations in the main river shall not exceed the maximum
    limits in the following table during more than one percent
    of the hours in the 12-month period ending with any
    month. Moreover, at no time shall the water temperature
    at such locations exceed the maximum limits in the
    following table by more than 1.7ºC (3ºF).
    ºC
    ºF
    Jan
    16
    60
    Feb
    16
    60
    Mar
    16
    60
    Apr
    32
    90
    May
    32
    90
    Jun
    32
    90
    Jul
    32
    90
    Aug
    32
    90
    Sep
    32
    90
    Oct
    32
    90
    Nov
    32
    90
    Dec
    16
    60
    Section 304.105 provides in relevant part:
    In addition to the other requirements of this Part, no effluent shall, alone or in
    combination with any other sources, cause a violation of any applicable water
    quality standard.
    FINDINGS OF FACT
    Based upon Borden’s amended petition and the testimony and exhibits offered at the
    hearing on September 11, 1997, the Board finds the facts here set forth.
    Borden’s Illiopolis plant is located in a rural area one mile west of Illiopolis, Illinois.
    The plant produces polyvinyl chloride (PVC) suspension and dispersion resins for the vinyl
    film, fabric, flooring, plastic pipe, and insulation industries. The plant has been in operation
    since 1949. The plant’s production processes have remained essentially unchanged over the
    years of operation. The plant presently employs approximately 240 people. Pet. at 3.
    The plant discharges treated wastewater pursuant to a National Pollution Dishcharge
    Emission System (NPDES) permit. The discharge enters an unnamed ditch which drains into

    4
    Long Point Slough. The Slough flows into the Sangamon River. The primary uses of both the
    ditch and the Slough are as conduits for agricultural runoff and wastewater treatment
    discharges. Although a variety of aquatic species inhabit the ditch and the Slough, the waters
    are of little use for recreational or other purposes on account of their low and variable flows.
    Exhibit (Ex.) 1 at 3; Pet. at 5. At times, the flow of water upstream from Borden’s outfall in
    the unnamed ditch, and upstream of the convergence with the ditch in Long Point Slough, is
    reduced to zero. No water is withdrawn from either the ditch or Long Point Slough for
    drinking, agricultural, or industrial purposes. Ex. 1 at 3; Pet. at 6.
    Over short periods, there is substantial natural variation in water temperature in
    portions of the ditch unaffected by Borden’s discharges. Ex. 1 at 6; Ex. 3 at 8. This variation
    is likely due to the small size and flow of the ditch and the resulting large impact on the
    temperature of the ditch caused by short term variations in ambient air temperature, cloud
    cover, rainfall, and/or groundwater discharge. Ex. 3 at 8. In fact, in some portions of the
    ditch and Slough, natural heating has caused exceedences of the temperature rise standards
    over short distances. Ex. 1 at 6. While the upstream flow in the ditch is a small fraction of
    the effluent flow, Borden’s discharges into the ditch would violate the temperature rise
    standard unless effluent temperature is controlled to within approximately 2.8ºC of the
    upstream temperature. Due to the large fluctuations in the temperature and flow of the stream
    upstream from Borden’s outfall, such control may be a practical impossibility. Ex. 3 at 7-8.
    Wastewater flows from Borden’s plant into a serpentine stream where solids settle out,
    and then discharges into the ditch. Ex. 1 at 2; Pet. at 31. Although some cooling of
    wastewater occurs before the water enters the ditch, the cooling is not always sufficient to
    assure that the water in the ditch does not exceed the winter maximum temperature standard as
    set forth in Section 302.211(e). Exceedences of the summer temperature standard, although
    rare, have also been recorded. Ex. 1 at 3-4.
    Borden’s plant’s wastewater results from three main waste streams generated at the
    plant. The first waste stream includes wastewaters from the PVC plants and paste plant, vinyl
    chloride air pollution control wastewater stripper effluent, and cooling tower and boiler
    blowdown. Pet. at 7. Among the treatment processes applied to this waste stream is activated
    sludge treatment involving use of autotrophic bacteria for nitrification. For optimum
    nitrification, the plant maintains an average temperature between 28
    °
    C and 32
    °
    C in the
    activated sludge system. Pet. at 8. The need to maintain the biologically-treated wastewater
    at a temperature of approximately 30
    °
    C is the primary cause of the plant’s effluent exceeding
    winter temperature standards. Pet. at 12.
    The second waste stream consists of wastewater from PVC Plant No. 2. The
    temperature of this waste stream typically exceeds the ambient temperature due to heat from
    the chemical process by which PVC is produced. Based upon limited measurements of
    temperature in Plant No. 2’s wastewater coupled with knowledge about its flow, this waste
    stream appears to be only a secondary contributor to the temperature of the plant’s final
    effluent. Pet. at 10.

    5
    The final waste stream sources include the vinyl chloride afterburner control
    scrubber/neutralizer, discharges from the boiler plant water treatment process, including filter
    backwash water, Zeolite regeneration and demineralizer regeneration rinse waters, and boiler
    plant lime softening sludges. These waters are collected in a pond for treatment prior before
    entering the ditch. As with the second waste stream, based upon limited measurement of its
    temperature coupled with knowledge of its flow, this third waste stream does not appear to be
    a significant contributor to the temperature of the plant’s final effluent. Pet. at 11.
    Borden submitted data complied from its Discharge Monitoring Reports (DMR)
    between 1985-1996, about the winter and summer maximum and minimum temperature
    standards at their sampling points. Pet. at Ex. H and I. The three sampling points are (1)
    Sampling Point A which is upstream in the ditch from Borden’s outfall; (2) Sampling Point B
    which is the plant’s outfall; and (3) Sampling Point C which is downstream from the plant’s
    outfall.
    The following chart summarized the number of times between 1985 and 1996 that
    temperatures exceeded the maximum temperatures listed at Section 302.211(e) compared to the
    number of samples taken. Pet. at 13.
    Exceedences Recorded between 1985 - 1996
    Winter
    Summer
    Sampling Point B
    123/253
    6/360
    Sampling Point C
    57/238
    1/334
    Borden’s DMR’s also showed that the temperature at Sampling Point C often exceeded
    that at Sampling Point A by more than 2.8
    §
    C. This information is relevant to Section
    302.211(d) which limits any rise in temperature to 2.8
    §
    C above the natural temperature. Pet.
    at Ex. K and L. Borden also collected temperature data between May and September 1996.
    The information showed the same temperature changes, and also indicated that the effluent
    temperature correlates with the ambient air temperature. Pet. at Ex. O. This same data
    indicated that the temperature at Sampling Point A had large natural variations in temperature
    over short periods. Pet. at Ex. J. Based on these indications, Borden concluded that its
    effluent increased the temperature of the unnamed tributary. However, Borden also concluded
    that much of the temperature changes were seasonal with sizable daily variations in the
    unnamed ditch’s temperature.
    Finally, Borden presented and examined a 1984 Stream Study (Pet. at Exhibit C and Q,
    Appendix A-3) to support its argument that natural heating of the unnamed tributary caused
    exceedence of the temperature rise standard at Section 302. 211(d), unaffected by Borden’s
    effluent. Pet. 17-19.
    The temperature of Borden’s effluent in the winter is due primarily to the need to
    maintain conditions in Borden’s wastewater treatment system which maximize biodegradation

    6
    of organics and ammonia nitrogen to ensure compliance with Borden’s NPDES permit. Pet. at
    2; Ex. 3 at 5. The temperature of Borden’s effluent in the summer results from heat sources
    that are integral to the plants’ manufacturing and pollution control activities (vinyl choride
    incinerator scrubber water, PVC Plant No. 2 wastewater, and aeration in the activated sludge
    unit). Pet. at 12. Cooling of the plant’s final effluent in the serpentine stream prior to
    discharge to the ditch is minimal. In fact, the data indicated that depending on ambient
    temperature and cloud cover, the temperature of the wastewater may increase prior to
    discharge. Pet. at 12. According to Borden, neither treatment technology nor process changes
    are available in the short term that would result in compliance with the temperature standards.
    Pet. at 2.
    Borden’s effluent is not likely to have an adverse impact on fish populations in the
    receiving waters. In fact, there would potentially be a lower abundance and diversity of fish
    and possibly other aquatic life in the receiving waters without Borden’s discharge. Borden’s
    discharge minimizes the temperature changes that would otherwise occur in the ditch,
    preventing freezing in the winter and a lack of flow in the summer. Ex. 2 at 1-3.
    Borden has identified six potential mechanisms for compliance: (a) aeration of the
    serpentine stream, (b) installation of cooling towers, (c) installation of a water chiller with a
    heat exchanger system, (d) installation of a cooling pond, (e) replacing the wastewater
    treatment plant with a larger system that could achieve organic and ammonia nitrogen removal
    at a lower temperature, and (f) cooling wastewaters that are not provided biological treatment
    prior to combining with biologically treated wastewaters. Ex. 3 at 5. All of these options
    would require a significant period of time for feasibility analysis, design and construction. Ex.
    3 at 6. Projected costs for these compliance methods range from $1,670,000 to $8,360,000.
    Ex. 5.
    DISCUSSION
    Applicability of Section 302.211(e)
    Before discussing the merits of Borden’s petition, we will address Borden’s request that
    we determine whether Section 302.211(e) applies in this case. Borden argues that Section
    302.211(e) does not apply to it, since the point at which temperature exceedences have been
    identified, in the unnamed ditch and Long Point Slough, are not in the “main river.” It is
    proper for a petitioner to seek a determination as to whether the rule from which it seeks
    variance is applicable to it. The question of applicability of the rule becomes a threshold
    issue. If the rule is inapplicable, no variance is necessary and no inquiry into arbitrary or
    unreasonable hardship need be made. Precision Coatings, Inc. v. Illinois Environmental
    Protection Agency (Feb. 20 1985), PCB 84-117.
    Borden, noting that “main river” as the term is used in Section 302.211(e) has never
    been defined, suggests that neither the unnamed ditch nor Long Point Slough is a “main
    river,” and consequently Section 302.211(e) does not apply.
     
    Pet. at 3-4; 35-37.
     
    The Agency
    suggests, in its “Recommendation” (Rec.) that the unnamed ditch and Long Point Slough
    should be considered “rivers” inasmuch as it is the Agency’s position that “main river” is the

    7
    portion of the receiving stream where mixing is allowed, and in a low flow stream such as the
    unnamed ditch or Long Point Slough, the entire width of the receiving stream should be the
    “main river.” Rec. at 5.
    We find no support for the Agency position that “main river” means the portion of the
    river in which mixing is allowed. Rather, it appears from the context of Section 302.211(e)
    that the “main river” would be the river beyond the mixing zone, because it is the impact on
    the “main river” which is regulated by this section, and such impact will only be determined
    after mixing has occurred.
    Nevertheless, the Board concludes that the unnamed ditch into which Borden discharges
    from its Illiopolis plant is a “main river” as that phrase is used in Section 302.211(e). “Main
    river” in 35 Ill. Adm. Code 302 differentiates between a primary channel (main flow) and
    those portions of the stream which do not follow the same thermal regime as the main flow.
    See 35 Ill. Adm. Code 302.104. In this case, we believe that the entire unnamed ditch should
    be considered the “main river” for the purposes of Section 302.211(e), since we have no
    evidence, nor has any argument been made, that the portion of the stream into which Borden
    discharges follows any different thermal regime than the main flow in the ditch.
    The Board accordingly finds that Section 302.211(e) is applicable to Borden’s discharge
    into the unnamed ditch.
    Merits of Variance Application
    The evidence establishes that minimal harm to the environment is likely to result from
    granting of the requested variance, and that Borden will be faced with arbitrary and
    unreasonable hardship if required to comply immediately. The Board has previously found
    that arbitrary or unreasonable hardship would result where technically and economically
    feasible means of compliance have not been identified despite diligent efforts by the petitioner.
    Mobil Oil Company v. Illinois Environmental Protection Agency (Aug. 14, 1986), PCB 86-
    45, slip op. at 6. It appears from the evidence that due to temperature fluctuations in the
    unnamed ditch upstream from Borden’s discharge point, there may be no technically and
    economically feasible means by which Borden can comply consistently with Section
    302.211(b), (c), (d) and (e), and consequently Section 304.105. From these facts, and the
    apparent unlikelihood of any adverse environmental impact, the Board concludes that it is
    appropriate to grant Borden the requested variance from Section 302.211(b), (c), (d), and (e),
    and Section 304.105.
    While the granting of this variance will result in no end-of-pipe effluent limitations for
    temperature and no water quality standards for temperature applicable to the ditch or Long
    Point Slough, Borden has agreed to certain conditions to be applied to the grant of this
    variance, including a limitation on the temperature to be maintained in the plant’s final
    polishing clarifier (the unit following biological treatment in Borden’s effluent treatment

    8
    stream)
    1
    of 35ºC, as well as a specific timetable to be followed in evaluation of compliance
    alternatives, which includes conducting a fish survey to determine specific effects of Borden’s
    effluent on aquatic life. The Board believes that these conditions will further decrease the
    likelihood of environmental harm during the period of this variance.
    ORDER
    A.
    Borden is hereby granted a variance from 35 Ill. Adm. Code 302.211(b), (c),
    (d), and (e), and 35 Ill. Adm. Code 304.105, for effluent from its Illiopolis,
    Illinois plant discharged into an unnamed tributary of Long Point Slough.
    B.
    This variance shall be in effect for five years from the date of this order, or
    until the Board rules on any permanent relief Borden may request, whichever
    occurs first.
    C.
    During the variance period the temperature in the plant’s final polishing clarifier
    shall not exceed 35ºC.
    D.
    Borden shall take action consistent with the schedule set forth in the following
    table:
    Item
    Description
    Completion Date
    1
    Completion of report summarizing additional fish
    survey work (as described in Exhibit AA to
    “Verified Amended Petition for Variance”)
    11/30/1997
    2
    Completion of in-plant wastestream temperature
    monitoring (as described in Exhibit AA to
    “Verified Amended Petition for Variance”)
    6/15/1998
    3
    Identification of compliance options
    8/15/1998
    4
    Assessment of technical feasibility of compliance
    options at the Borden plant
    10/15/1998
    5
    Identification of adverse environmental impacts of
    technically feasible compliance options
    10/15/1998
    6
    Identification of possible solutions to identified
    adverse environmental impacts
    12/15/1998
    7
    Assessment of net environmental benefit of
    technically feasible compliance options
    1/30/1999
    1
    Borden’s Petition and the Agency’s “Recommendation” originally proposed the temperature
    restriction for the plant’s biological treatment system. By agreement, as represented at the
    hearing, the limit will now apply to the final polishing clarifier. See Transcript of September
    11, 1997, hearing at p. 14.

    9
    8
    Quantification of capital and operating costs of
    technically feasible and environmentally acceptable
    options
    7/31/1999
    9
    Choice of compliance option and/or decision to
    pursue adjusted standard
    1/30/1999
    10
    Install equipment to implement compliance option
    and/or file adjusted standard petition
    1/30/2000
    11
    Install equipment to implement compliance option
    (if compliance option technically and economically
    feasible)
    10/31/2000
    12
    Compliance with temperature standards or final
    decision on adjusted standard petition
    11/5/2002
    E.
    This variance shall not be effective unless and until a Certificate of Acceptance
    is executed and transmitted to the Agency as described below.
    CERTIFICATION OF ACCEPTANCE
    If Borden chooses to accept this variance subject to the above order, within 45 days of
    the date of this order, Borden shall execute and forward to:
    Margaret P. Howard
    Illinois Environmental Protection Agency
    Division of Legal Counsel
    1021 North Grand Ave., East
    Springfield, IL 62702
    a Certificate of Acceptance and agreement to be bound to all terms and conditions of the
    granted variance. The 45-day period shall be held in abeyance during any period that this
    matter is appealed. The form of the Certificate of Acceptance shall be substantially similar to
    that attached to this order.
    IT IS SO ORDERED.
    Board Member K.M. Hennessey abstained.
    Section 41 of the Environmental Protection Act (415 ILCS 5/41 (1996)) provides for
    the appeal of final Board orders to the Illinois Appellate Court within 35 days of service of this
    order. Illinois Supreme Court Rule 335 establishes such filing requirements. See 145 Ill. 2d
    R. 335; see also 35 Ill. Adm. Code 101.246, Motions for Reconsideration.

    10
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above opinion and order was adopted on the 6th day of November 1997, by a vote of 6-0.
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    11
    BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    BORDEN CHEMICALS AND PLASTICS
    OPERATING LIMITED PARTNERSHIP,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-102
    (Variance - Water)
    CERTIFICATE OF ACCEPTANCE
    Borden Chemicals And Plastics Operating Limited Partnership hereby accepts and
    agrees to be bound by all the terms and conditions of the order of the Pollution Control Board
    adopted on November 6, 1997, in PCB 97-102.
    BORDEN CHEMICALS AND PLASTICS
    OPERATING LIMITED PARTNERSHIP
    By:
    ______________________________
    Authorized Agent
    ______________________________
    Title
    ______________________________
    Date