ILLINOIS POLLUTION CONTROL BOARD
July 24, 2003
THOMPSON SERVICE,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-199
(UST Appeal)
ORDER OF THE BOARD (by T.E. Johnson):
On May 1, 2003, at the parties’ request, the Board extended until July 17, 2003, the time
period for Thompson Service to appeal a March 14, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
101.300(b), 105.402, 105.406. At issue is the Agency’s approval of the site classification
completion report and amended site classification work plan budget, with modifications,
regarding Thompson Service’s underground storage tank site at 601 East Locust, Bloomington,
McLean County. Because petitioner failed to timely file an appeal, the Board dismisses this case
and closes the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on July 24, 2003, by a vote of 6-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board