ILLINOIS POLLUTION CONTROL BOARD
    June 19, 2003
     
    R.W. SHERIDAN OIL COMPANY, INC.,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 03-145
    (UST Appeal)
     
    ORDER OF THE BOARD (by T.E. Johnson):
     
    On March 20, 2003, at the parties’ request, the Board extended until June 4, 2003, the
    time period for R.W. Sheridan Oil Company, Inc. (Sheridan Oil) to appeal a January 30, 2003
    determination of the Illinois Environmental Protection Agency (Agency).
    See
    415 ILCS
    5/40(a)(1) (2002); 35 Ill. Adm. Code 101.300(b), 105.402, 105.406. At issue is the Agency’s
    approval of the petitioner’s high priority corrective action plan budget, with modifications,
    regarding Sheridan Oil’s underground storage tank site at 301 Chestnut Street, Le Roy, McLean
    County. Because petitioner failed to timely file an appeal, the Board dismisses this case and
    closes the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on June 19, 2003, by a vote of 6-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top