ORDER OF THE BOARD (by T.E. Johnson):
On May 29, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Randall Industries may appeal a April 21, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is the
Agency’s approval of the site classification work plan budget, with modifications, for Randall
Industries’ leaking underground petroleum storage tank facility located at 741 South Route 83,
Elmhurst, DuPage County. The Board extends the appeal period until August 25, 2003, as the
parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Randall
Industries fails to file an appeal on or before that date, the Board will dismiss this case and close
the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on June 5, 2003, by a vote of 6-0.
Dorothy M. Gunn, Clerk