ILLINOIS POLLUTION CONTROL BOARD
May 1, 2003
JIM’S SHELL & MARINE,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-193
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by T.E. Johnson):
On April 16, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Jim’s Shell & Marine may appeal a March 7, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency approved
corrective action costs for reimbursement, with modifications, for Jim’s Shell & Marine’s
leaking underground petroleum storage tank facility located at 1122 North Springfield Street,
Virden, Macoupin County. The Board extends the appeal period until July 11, 2003, as the
parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Jim’s Shell &
Marine fails to file an appeal on or before that date, the Board will dismiss this case and close the
docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on May 1, 2003, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board