ILLINOIS POLLUTION CONTROL BOARD
    October 25, 1990
    IN THE MATTER OF:
    )
    PETITION OF KEYSTONE STEEL
    )
    R90-22
    AND WIRE COMPANY FOR HAZARDOUS
    )
    (Site-Specific
    WASTE DELISTING
    )
    Rulemaking)
    ORDER OF THE BOARD BY
    (3.
    Anderson):
    This matter comes before the Board on an October 23, 1990
    motion for extension of time filed by Keystone Steel and Wire
    Company (Keystone). Keystone requests “an extension of time
    until one week after the Board reaches a decision in R90-17 to
    respond to the Board orders dated September 27, 1990 and October
    11, 1990.” The Board hereby grants an extension of time until
    two weeks after the Board reaches a decision in R90—l7. The
    Board is granting a two week extension due to the potential for
    delays between the decision date and the date the decision is
    received by the party.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certify that the above Order was adopted on the
    ~‘5Z~
    day of
    ________________,
    1990, by a vote of
    Dorothy M./Gunn, Clerk
    Illinois P’ollution Control Board
    115—4 99

    Back to top