ILLINOIS POLLUTION CONTROL BOARD
October 25, 1990
IN THE MATTER OF:
)
PETITION OF KEYSTONE STEEL
)
R90-22
AND WIRE COMPANY FOR HAZARDOUS
)
(Site-Specific
WASTE DELISTING
)
Rulemaking)
ORDER OF THE BOARD BY
(3.
Anderson):
This matter comes before the Board on an October 23, 1990
motion for extension of time filed by Keystone Steel and Wire
Company (Keystone). Keystone requests “an extension of time
until one week after the Board reaches a decision in R90-17 to
respond to the Board orders dated September 27, 1990 and October
11, 1990.” The Board hereby grants an extension of time until
two weeks after the Board reaches a decision in R90—l7. The
Board is granting a two week extension due to the potential for
delays between the decision date and the date the decision is
received by the party.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, hereby certify that the above Order was adopted on the
~‘5Z~
day of
________________,
1990, by a vote of
Dorothy M./Gunn, Clerk
Illinois P’ollution Control Board
115—4 99