ILLINOIS POLLUTION CONTROL BOARD
April 3, 2003
TASIM FEJZA,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-162
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by T. E. Johnson):
On March 27, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Tasim Fejza may appeal a February 18, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.206(c), 105.208(a), (c). Because the postmark date of the joint petition is within the time for
filing, the petition was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is an
Agency modification of the corrective action plan regarding Tasim Fejza’s leaking underground
petroleum storage tank facility located at I-57 & Peotone Road, in Peotone, Will County. The
Board extends the appeal period until June 23, 2003, as the parties request.
See
415 ILCS
5/40(a)(1) (2002); 35 Ill. Adm. Code 105.208(a). If Tasim Fejza fails to file an appeal on or
before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on April 3, 2003, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board