ILLINOIS POLLUTION CONTROL BOARD
    April 3, 2003
     
    TASIM FEJZA,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
     
     
     
    PCB 03-162
    (UST Appeal)
    (90-Day Extension)
     
    ORDER OF THE BOARD (by T. E. Johnson):
     
    On March 27, 2003, the parties timely filed a joint notice to extend the 35-day period
    within which Tasim Fejza may appeal a February 18, 2003 determination of the Illinois
    Environmental Protection Agency (Agency).
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
    105.206(c), 105.208(a), (c). Because the postmark date of the joint petition is within the time for
    filing, the petition was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is an
    Agency modification of the corrective action plan regarding Tasim Fejza’s leaking underground
    petroleum storage tank facility located at I-57 & Peotone Road, in Peotone, Will County. The
    Board extends the appeal period until June 23, 2003, as the parties request.
    See
    415 ILCS
    5/40(a)(1) (2002); 35 Ill. Adm. Code 105.208(a). If Tasim Fejza fails to file an appeal on or
    before that date, the Board will dismiss this case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on April 3, 2003, by a vote of 7-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top