    Opinion of the Board
    (4by Mr.
    Currie):
    Mattison petitioned for
    a variance,
    the Agency filed
    a counter-
    complaint,
    and the parties have submitted
    a stipulation and
    proposed settlement that we hereby approve.
    The stipulation recites that Mattison operates
    a gray and
    ductile iron cupola
    in Rockford.
    An Air Contaminant Emission
    Reduction Program providing for installation of a wet cap
    was approved bythe Air Pollution Control Board, but
    it
    later
    developed that
    that device would
    not be adequate to assure
    compliance.
    Further negotiations
    followed.
    The company now is
    committed to the installation
    of equipment including an after-
    burner
    (already installed)
    and
    a baghouse
    to assure compliance
    with the particulate regulations by August
    31,
    1972 at the
    latest.
    The parties agree
    to the payment of a penalty of $3500 for past
    violations.
    This settlement
    is in accord with
    our prior
    decisions
    in cases of this
    type,
    and we hereby approve it.
    There
    is no showing of such
    an extreme nuisance as to justify
    the drastic remedy of closing the plant during the rather short
    time remaining before completion
    of the control program.
    ORDER
    1.
    Mattison
    shall pay the sum of $3,500.00 to the EPA in full
    and complete settlement, release and payment of all
    violations
    of Illinois State air pollution statutes
    and regu—
    lations during the period from January
    1,
    1967 to December
    31,
    1971, which were alleged or might have been alleged in
    the enforcement action filed by the EPA.
    3
    583

    2.
    Mattison
    is granted
    a variance with respect to applicable
    emission standards for the operation of its cupola until
    August
    31,
    1972, or sixty days
    after final delivery from
    Combustion Equipment Associates
    (“CEA”)
    to Mattison of all
    equipment to the
    site necessary for installation of Mattison’s
    cupola emission control system as described in the stipulated
    facts attached hereto, whichever first occurs.
    Within thirty
    days after
    such installation date Mattison
    shall cause
    its
    cupola emissions to be tested by an independent testing company
    for submission
    to the EPA to determine compliance with State
    emission standards.
    3.
    Mattison shall file with
    the EPA
    a performance bond or
    such other security
    as the EPA may deem appropriate
    in the
    sum of $160,000.00 to guarantee installation and performance
    of its cupola emission control system in compliance with the
    provisions
    of Paragraph
    2
    of this Agreed Order.