ILLINOIS POLLUTION CONTROL BOARD
October
3,
1972
COMMONWEALTH EDISON CO.
v.
)
#
72—295
ENVIRONMENTAL PROTECTION AGENCY
Opinion
& Order on Motion for Interim Variance
(by Mr. Currie):
A hearing has been authorized on this petition for ex-
tension and modification of a variance granted Oct.
14,
1971,
Commonwelath Edison Co.
v. EPA,
#
71-129,
2 PCB 627, which
approved a compliance program for the company’s Will County
and Powerton generating stations.
The hearing has been post-
poned until October or November to enable the Agency to
present the results of
a detailed study of the Edison system
to enable us better to assess the case.
The 90-day period
in which we must decide the case in the absence of a waiver
will expire October 11.
The company is unwilling to waive
its right to
a decision by that date unless we grant a
corresponding extension of the variance so that it will not
be subject to prosecution while litigating its right to
a further extension.
The request is reasonable and is not
objected to by EPA.
The 60-day extension will enable the
Board to make a reasoned decision on the basis of a complete
record, and the original order contemplated continuance of
the program beyond October of this year.
Edison filed its
petition in time to secure
a decision within the original
variance period, and the hearing has been scheduled later to
meet the needs of the EPA.
Cf. GAF Corp.
v.
EPA, #71-11,
2 PCB 57
(June 28,
1971).
The variance granted Ocotber 14,
1971,
as modified by
the orderof November 11,
1971,
3 PCB 53,
is hereby extended
for 60 days on condition that Edison on or before October
10, 1972 files
a written waiver for the corresponding period
of the right to a decision in the present case within
90
days.
I, Christan Moffett, Clerk of the Pollution Control Board,
certify that the Board adopted the above Opinion
& Order
on Motion for Interim1variance this 3rd. day of October,
‘972,
by a vote of
~
•
/
/
/71
~
5
—
583