ILLINOIS POLLUTION CONTROL BOARD
    November 28,
    1972
    INCINERATOR,
    INC.
    )
    )
    V.
    )
    * 72—416
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    Opinion of the Board
    (by Mr. Currie):
    Incinerator seeks a brief extension of the eleven months
    allowed by our order of November 23, 1971,
    #71—324,
    3
    PCB
    167,
    for operation of scrubbing equipment to bring about compliance
    with particulate emission standards.
    As
    a result of damage
    to a component of the control equipment during delivery and of
    unexpected delays in securing an electrical supply to
    power the equipment, installation of the first scrubber was
    expected,
    the new petition alleged,to be completely installed
    by November 1, 1972, testing to commence December 11,
    1972,
    and debugging to be completed by January 31,
    1972.
    By the
    end of this period both scrubbers will be in full operation.
    The Agency confirms that Incinerator has acted with diligence
    to complete its control program and that the relatively
    minor delays experienced were beyond the company’s control.
    We agree the extension should be granted.
    The Agency suggests
    several conditions which we deem reasonable.
    ORDER
    The variance granted to Incinerator,
    Inc. in 471-324
    November 23, 1971 is hereby extended to
    January 31,
    1973,
    on the following conditions:
    1)
    All applicable conditions of the prior order shall be met;
    2)
    A detailed progress report specifying every operation
    which
    has
    not
    been
    completed
    and
    the
    estimated
    time
    of
    completion
    for
    each
    operation
    shall
    be
    submitted
    to
    the
    Agency
    by
    December
    14,
    1972;
    3)
    A stack test shall be performed on or before December
    15,
    1972, or as soon thereafter as weather conditions
    permit.
    The Agency shall be notified five days in ad-
    vance of the scheduled date of the stack test so that
    Agency personnel may,
    if desired, monitor the testing
    procedures.
    Stack test results shall be submitted to the
    Agency by Jan.
    31,
    1973;
    6—
    a

    —2—
    4)
    Petitioner shall, within 5 days after receipt of this
    order, inspect the mesh screen and,
    if necessary, replace
    it immediately.
    I, Christan Moffett, Clerk of the Pollution Control Board,
    certify that the Board adopted the above Opinion this
    ~.-~~c4’
    day of
    i~.
    ,
    1972,
    by
    a vote of
    ~)_\
    6
    340