ILLINOIS POLLFTION
CONTROL BOARD
November 21, 1P72
VLLAGE
OF I3ENSENVILLE
pgy~
72—446
ENVIRONMENTAL PROTECT
ON AGENCY
NTER
I1VI ORDER OF
TIlE
BOARD
(by Mr.
Dumelle
The
petition
for variance
of th:
Village of flentu:~nviI1e s
not
clear
as
to which
sections
oF
the
Water Regulations are to be vioiateu,
Hensenville
evidently
s sks to clean a clarifier in
order
to
make the plant funet ion pronerly.
The last paragrapd of the petition states
‘It is
possible thai. during the
4 hours following the return
of
flow
to
the clarifier that
the
ROD and Suspended
So!
ids
(SS) may increase
slightly,
with a decrease of the final effluent DO.
The period appears so short (4 hours) lhal. the entire proceeding may be
de
m
inimus. The ROD and SS effluent deterioration is not quantified.
And
no standard
of
the Board requires a given level
of DC) in the final effluent.
TI ensenville
is advised
to revi ow its petition to determine if a variance
is actually
necessary.
Tf
it
is not
required,
then
lIens envill e should withdraw
its
petition.
If a
variance
is
required, then the
specific
standard
to be
given
a \rariance from
should
be
identified. The estent
ol harm
to
the env’onment
should
also he quantified.
Winter is pressing in
and haste
is
urged in order that the sewage plant
might be restored
to proper
operation.
The
Village
of lIens
enville is gi
von
unt:il
December ii, 1972
to
file an amended petition,
if the etition is amended,
then
the
90—day decision period shall run from the date
of filing
of the
amended
petition. If
the
petition is not
amended
or
withdrawn
by that date
it is
sublect
to dismissal as being inadequate.
IT IS
SC)
ORDERED.
6
—
291
I,
(iuu’msrun I~. 1\Ioitcli, Clerk of 11w Illinois
Holluilioti
(
oumlrol
Hotml,
m,l)\ t~i’iilv iluc ~ubo’~c Order
ucus
cdopled on
i, it
:~dav el Noventheu,
\ a Volt’ Ol
(‘Ii u’i si an B.
~ loifol I, Cl
erk
-
lii
jams Poliuii
ion Coni r
1 11