tLLINOIS
POLLUTION
CONTROL
BOARD
February
6,
1973
CITY
OF
GRANITE
CITY
PCB72—184
V.
PCB72-371
ENVIRONMENTAL
PROTECTION
AGENCY
INTERIM
ORDER
retitioner
is granted a variance from Section 921
(d)
of the Illinois Water Pollution Regulations which requires
that a Project Completion Schedule be approved before
a per-
mit can be issued by the Agency.
This does not,
however,
excuse the filing of such Schedule altogether;
it is only
permission
to issue the permit prior to that time.
The Board’s decision on the remaining issues
in this
matter will foHow.
I, Christan L.
Moffett, Clerk of
the Illinois Pollution
Control Board,
certify that the above Interim Order was
adopted by the Board on the
_____
day of
~.7
,
1973,
byavoteof
to
___
.
7—7