ILLINOIS POLLUTION CONTROL BOARD
    May 17, 1973
    )
    IN
    TIlE MATTER OF:
    )
    )
    R72-l7, R72-l8
    FARM
    GRAIN
    DRYER
    REGULATIONS
    )
    )
    ORDER
    A proposed final draft was authorized by the Board on
    May
    3,
    1972.
    Upon Motion to Reconsider,
    the proposed final
    draft
    is hereby modified in the following respects:
    1.
    The new date for requiring operating permits
    for grain handling and conditioning operations
    shall be September
    1,
    1974,
    2.
    We delete the proposal for granting exception
    from the permit requirement for on-farm grain
    dryers having
    a throughput capacity of 1,000 bushels
    or
    less per hour.
    This type of exception shall
    be considered at
    a later date,
    following the
    development of more information by
    a Task Force.
    I, Christan
    L. Moffett, Clerk of the Illinois Pollution Control Board,
    hereby certify
    that the above Order
    was
    adopted on the
    17~
    day
    of May, 1973 by
    a vote
    of __________________________________
    Christan
    L.
    Moffett, Clerk
    Illinois Pollution Control Board
    $—51

    Back to top