ILLINOIS POLLUTION CONTROL BOARD
May 17, 1973
C-W ENTERPRISES, INC.
#73—205
v.
ENVIRONNENTAL PROTECTION AGENCY
)
ORDER OF THE BOARD (BY MR. DUMELLE):
The petitioner’s letter of May 14 is not clear in its fourth
paragraph as to whether a variance is needed from an existing Agency
sewer ban; from a ban because of an overloaded sewer or
whether
a
routine sewer permit requiring no variance is what is desired.
Petitioner shall amend his petition within 15 days to clarify
what it is that the variance is desired from. If no clarification
is received, the petition shall be subject to dismissal for inade-
quacy.
IT IS SO ORDERED.
I, Christan Moffett, Clerk of the Pollutio~ Control Board, certify
that the above Order was adopted on the
11
‘~dayof May, 1973, by a
vote of
_______
to ~
8 —47