ILLINOIS POLLUTION CONTROL BOARD
    May 17, 1973
    C-W ENTERPRISES, INC.
    #73—205
    v.
    ENVIRONNENTAL PROTECTION AGENCY
    )
    ORDER OF THE BOARD (BY MR. DUMELLE):
    The petitioner’s letter of May 14 is not clear in its fourth
    paragraph as to whether a variance is needed from an existing Agency
    sewer ban; from a ban because of an overloaded sewer or
    whether
    a
    routine sewer permit requiring no variance is what is desired.
    Petitioner shall amend his petition within 15 days to clarify
    what it is that the variance is desired from. If no clarification
    is received, the petition shall be subject to dismissal for inade-
    quacy.
    IT IS SO ORDERED.
    I, Christan Moffett, Clerk of the Pollutio~ Control Board, certify
    that the above Order was adopted on the
    11
    ‘~dayof May, 1973, by a
    vote of
    _______
    to ~
    8 —47

    Back to top