ILLINOIS POLLUTION CONTROL BOARD
    October 11,
    1973
    )
    GENERAL ELECTRIC, MIDWEST
    )
    FUEL
    RECOVERY
    PLANT
    )
    )
    )
    v.
    )
    PCB 72-477
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF
    THE
    BOARD
    (by
    Mr.
    Dunielle):
    Motion to Modify and Amend the Order of the Board of March
    8,
    1973 filed October
    1,
    1973 by General Electric Company and accompanied
    by
    a stipulation executed by the Environmental Protection Agency on
    September 17, 1973
    is
    approved.
    Paragraph
    3 of the Board Order of March
    8,
    1973 now reads,
    “3.
    Petitioner shall supply,
    install and maintain
    a chemuluminescent nitrogen oxide ambient air monitor
    at the Dresden on-site No,
    3 location on
    or before
    August 17,
    1973.
    dourly average concentration data
    is
    to be submitted to the Agency on
    a monthly basis.
    Meteorological data gathered at the site will
    also
    be submitted
    to the Agency by General Electric,
    as
    it
    becomes available to General Electric,
    in
    a form
    and on a schedule mutually agreed upon
    by
    General
    Electric and the Agency.t’
    IT
    IS SO ORDERED.
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution Control
    Board hereby certify the above Order was adopted on the
    //~‘
    day
    of October,
    1973 by a vote of _____________________________________
    QIL~
    ~‘)
    ~4LdL
    Christan
    L. Moffett,
    rk
    Illinois Pollution C
    rol Board
    g
    4~g

    Back to top