ILLINOIS POLLUTION CONTROL BOARD
    August 30, 1973
    OWENS-ILLINOIS, INC.
    SHABBONA SAND PLANT,
    Petitioner,
    v.
    )
    PCB 73—237
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    OPINION AND ORDER OF THE BOARD (by Mr. Seaman):
    Petition for variance was filed by Owens-Illinois, Inc. alleging
    that Petitioner owns and operates a sand plant in Serena, Illinois,
    as part of its Glass Container Division. The plant produces
    two types of sand used for the manufacture of glass containers
    and for other purposes. Sixteen people are employed at the plant.
    The plant was originally constructed in 1965, but the equip-
    ment used in the plant, including the dryer, was more than fifty
    years old and in a bad state of repair. Petitioner purchased the
    plant in January of 1971. Within the plant, the principal emis-
    sion source is a direct rotary dryer for sand drying on a con-
    tinuous basis, which emits silica sand dust and which is heavy
    particulate matter. Presently, the dryer processes 90 tons of
    sand per hour for sixteen hours each day, and emits approximately
    623 pounds of particulate matter per hour.
    Because of uncertainty as to what route to follow in updat-
    ing its equipment, Petitioner was granted a 60 day extension of
    the March 1, 1973 filing date for operating permit pursuant to
    Rule 103(b) (2) (A) of the newly adopted Air Pollution Regulations.
    Under Rule 203(a) of the Regulations, the dryer is permitted an
    emission of only 28.02 pounds per hour and a control program
    has been initiated. At the present time, there is no control
    equipment installed for abatement of particulate emissions, A
    program for installation of a scrubber to control these emissions
    at a total cost of $7,500 plus $3,500 installation charge has been
    embarked upon as follows:
    9
    169

    —2—
    Date Activity Will Be
    Completed
    Date the applicant will apply
    Being submitted
    for a construction permit for
    simultaneously with
    this item of equipment or
    this variance petition
    modification of equipment
    Date the applicant will enter
    6/1/73
    into a binding agreement to
    purchase or modify this item
    of equipment
    Date this item of equipment
    10/1/73
    will be delivered to the
    applicant’s facility
    Date construction or modifica-
    1/1/74
    tion of equipment will be
    completed
    Date applicant will test equip-
    2/1/74
    ment to demonstrate compliance
    with the Environmental Pro-
    tection Act and substantive
    regulations promulgated there-
    under
    Date equipment will be fully
    3/1/74
    operational
    Computations based upon micron size of emissions of particles,
    the configuration of the plant site and contingous property and
    the prevailing wind have enabled Petitioner to compute that sub-
    stantially all of the particulates will settle out before reaching
    the nearest residence, most of which will settle on Petitioner’s
    property. No complaints have been received from the neighbors.
    Petitioner seeks a variance to March 1, 1974 from Rule 203(a)
    (Particulate Emission Limitations for New Process Emission Sources),
    Rule 203(i) (2) (December 31, 1973 Compliance Date), Rule 104 and
    104 (b) (Compliance Program and Project Completion Schedule)
    ,
    and
    Rule 114, presumably relating to the limitations presently
    embodied in the Rules and Regulations Governing the Control of Air
    Pollution.
    9
    170

    —3—
    The Agency recommends that the variance be granted subject
    to certain conditions hereinafter specified. The Agency states
    that the rotary dryer is presently in violation of Rule 3-3.111
    of the Rules and Regulations Governing the Control of Air Pollu-
    tion, which requires it to comply with the more stringent regula-
    tions contained in Rule 203(a) of the newly adopted Regulations by
    December 31, 1973. The present allowable standard under Rule
    3—3.111 is 50.2 lb/hr, whereas Rule 203(a) will limit emissions
    as above noted to 28.1 lb/hr effective December 31, 1973. The
    Agency states that it believes the equipment will be effective
    in bringing the Petitioner’s facility into compliance with Rule
    203(a) and likewise believes that the time schedule proposed for
    compliance is reasonable. It states that variances from Rules
    104, 104(b) and 114 are unnecessary and inappropriate. However,
    in view of the need to obtain an operating permit to
    assure the plant’s continuing operation, we believe a variance
    from Rule 104 is appropriate. The variance from Rule 114 is in
    effect a request for variance of Rule 3—3.111 of the present Air
    Rules. The Agency recommends that the variance of Rule 3-3.111
    of the Rules and Regulations Governing the Control of Air Pollu-
    tion (old rules) and Rules 203(a) and 203(i) (2) of the Air Pollution
    Rules (new rules) be granted subject to the following conditions:
    a) On August 1, 1973, November 1, 1973 and January 1, 1974,
    Petitioner shall submit to the Agency progress reports
    indicating progress made towards completion of the project.
    b) Petitioner shall apply for and obtain all necessary permits
    from the Agency.
    c) Within thirty-five (35) days from the date of a Board Order
    in this case, Petitioner shall submit a performance bond in
    a form satisfactory to the Agency and in an amount deemed
    appropriate by the Board to ensure compliance with this Order
    and the Rules and Regulations.
    d) Within thirty (30) days of the completion of this project,
    Petitioner shall have performed a stack test. Petitioner
    shall submit the results of the stack test to the Agency.
    Within five (5) days of the date of said test, Petitioner
    shall notify the Agency of the time and place of said test
    and allow Agency observation if it is desired.
    We grant the variance as requested subject to the terms and
    conditions proposed by the Agency.
    This Opinion constitutes the findings of fact and conclusions
    of law of the Board.
    9
    171

    —4—
    IT IS THE ORDER of the Pollution Control Board that Petitioner,
    Owens—Illinois, Inc. be granted a variance until March 1, 1974 from
    Rule 3-3.111 of the Rules and Regulations Governing the Control of
    Air Pollution and from Rules 104, 104(b), 114, 203(a) and 203(i) (2)
    of Chapter 2: Air Pollution, Illinois Pollution Control Board kules
    and Regulations to enable installation of a W. W. Sly scrubber for
    control of particulate emissions at its Shabbona Sand Plant located
    at Serena, Illinois subject to the following terms and conditions:
    a) On November 1, 1973 and January 1, 1974, Petitioner shall
    submit to the Agency progress reports indicating progress
    made towards completion of the project.
    b) Petitioner shall apply for and obtain all necessary permits
    from the Agency.
    c) Within thirty-five (35) days from the date o~this Order,
    Petitioner shall submit a performance bond in the amount of
    $11,000 in form satisfactory to the Agency to ensure the installa-
    tion and operation of the aforementioned control equipment.
    d) Within thirty (30) days of the completion of this project,
    Petitioner shall have performed a stack test. Petitioner
    shall submit the results of the stack test to the Agency.
    Within five (5) days of the date of said test, Petitioner
    shall notify the Agency of the time and place of said test
    and allow Agency observation if it is desired.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, certify that the above Opi ion and Order was adopted by the
    Board on the
    ~
    day of
    ____________,
    1973, by a vote of
    3
    to
    b.
    9