ILLINOIS POLLUTION CONTROL BOARD
December 20, 1973
)
ARTHUR
MURPHY
)
)
)
v.
)
PCB 73-535
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF THE BOARD (by Mr. Dumelle)
Petition filed December 17, 1973 is inadequate in that it
does not state whether the proposed sewer connection from Vermount
Avenue to Northern Avenue would connect to a sewer in Waukegan
with inadequate transport capacity.
Petitioner is ordered to supply such information within
35 days from the date of this order. A waiver of the 90-day
decision period shall be executed and the decision period shall
run from the filing of the additional information.
Failure to timely file this information shall render the
petition liable to dismissal for inadequacy.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
~c~’
day
of December, 1973 by a vote of
.S—ø
Christan L. Moffett4~lerk
Illinois Pollution ~ôntrol Board
10
—
479