ILLINOIS POLLUTION CONTROL BOARD
December 20, 1973
UNION CARBIDE CORPORATION,
Petitioner,
v.
)
PCB 73—313
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr. Henss)
It is
the order of the Pollution Control Board that:
Petitioner Union Carbide Corporation be granted variance
from Rules 103(b) (2),
103(b) (6) (E)
,
104, and 203(a)
of
the Illinois Air Pollution Control Regulations until
December 20,
1974,
for the purpose of installing control
equipment which will ultimately bring Petitioner into
compliance with the 23.72 lb./hr.
particulate emission
standard of Rule 203(a)
.
This variance is granted on
condition that:
1)
Petitioner shall file
a Compliance Plan and
Project Completion Schedule with this Board
and the Illinois Envitonmental Protection
Agency by January 31,
1974 which shall assure
Petitionerts compliance with the particulate
standard of Rule
203(a) by June
1,
1975.
2)
Petitioner shall by January
31,
1974 post
a
bond in the amount of $150,000 in
a form
acceptable
to the Environmental Protection
Agency, such bond to be forfeited in the event
Petitioner fails to meet the construction deadlines
of the Compliance Plan and Project Completion
Schedule.
The bond shall be mailed to:
Fiscal
Services Division, Illinois EPA,
2200 Churchill
Road,
Springfield,
Illinois 62706.
I, Christan L. Moffett, Clerk of the Illinois Pollution Contr 1 Board,
hereby certify the above Order was adopted this ~c~~”day
of
1973 by a vote of~ toe’
*
___
10 —421