ILLINOIS POLLUTION CONTROL
March
 21, 1974
V.
ENVIRONMENTAL PROTECTION AGENCY
ORDER OF THE BOARD
 (by Mr. Dumelle):
5
PCB 74-97
Petition filed March
 18, 1974
 is inadequate
 in that
 it
does not report the results
 of copper sulfate dosages
 of the pre-
vious
 variance, PCB 73-170, granted May 31,
 1973.
Petitioner is ordered
 to supply to the Board within
 30 days
from the date
 of this order the copper concentrations actually
achieved in the raw water intake to
 the treatment plant when
dosing with copper sulfate under the conditions specified in
PCB 73-170, especially Condition Nos.
 3 and
 4.
Failure
 to timely file the information requested
 shall
make the petition liable
 to dismissal
 for inadequacy.
 The
90-day decision period specified under the Act shall
 run from
the date of filing the additional inform~ationrequested.
IT
 IS SO ORDERED.
I, Christan
 L. Moffett, Clerk of the
 Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
 ~
 ~
 day
of March,
 1974 by
 a vote of
 ‘..~-O
BOARD
Illinois Pollution
 rol Board
1~1
—651