ILLINOIS POLLUTION CONTROL BOARD
    November 29, 1973
    )
    FANSTEEL, INCORPORATED
    )
    )
    v.
    )
    PCB 73-423
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF THE BOARD (by Mr. Dumelie):
    Fansteel’s Motion to Amend Order in PCB 72-76 is denied
    because of the length of time which has transpired since the
    October 31, 1972 order. However, Fansteel’s Motion will be
    construed as a Petition for Variance from the compliance dates
    set forth in the Board’s Order in Environmental Protection
    Agency v. Fansteel, Inc. and the City of North Chica~o, decided
    October 31, 1972. The October 26, 1973, date of filing of the
    construed variance petition will start the 90-day decision
    period running. The variance petition will be held for
    Agency recommendation and will he decided without a hearing.
    Fansteel is seeking to extend the October 31, 1973
    compliance date contained in the previous Board Order, PCB 72-76,
    until May 1, 1974. No hearing will be held because Fansteel
    is in substantial compliance with the Board’s Order and because
    the delay in the implementation of the compliance program was
    caused by the withdrawal of Fansteel’s consultant and delay in
    delivery of a major piece of pollution control equipment.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the ‘~v
    day
    of November, 1973 by a vote of _______________________________________
    (\L~.
    ‘I
    Christan L. Moffett, Clerk
    Illinois Pollution- Control Board
    10— 175

    Back to top