1. Illinois Pollution

ILLINOIS POLLUTION CONTROL BOARD
February
7,
1974
CHICKASAW HILLS UTILITY COMPANY
ENVIRONMENTAL
PROTECTION
AGENCY
Petition
filed
January
31,
1974
is
inadequate
in
that
it
does
not
state
(in
paragraph
4)
why
construction
of
the
sewer
line
and
homes
cannot
begin.
It
is
not
clear
whether
an
Illinois Environmental Protection Agency ban
is in effect
and if
so for what reason,
The extent of the hardship upon
the Pebble Creek entrepreneurs
is not detailed in any way and
the statements
of the petition on this topic appear to be
conclusory~
Petitioner
is directed to
amend the petition within 45 days
from the date of this order to provide the needed information
listed above.
A waiver of the 90-day decision period shall be
filed from the date
of the filing of the original variance
petition until
the date of the filing of the amended variance
petition~
Failure
to timely file the amended petition shall
make the
petition
liable
to dismissal for inadequacy~
IT
IS SO ORDERED.
I,
Christan
L, Moffett,
Clerk of the Illinois Pollution Control
Board, hereby certify the above Ord~erwas adopted on the
7~’1
day
of February, 1974 by
a vote of
~S-O
Illinois Pollution
11 -~2O9

Back to top