ILLINOIS POLLUTION CONTROL BOARD
January 31, 1974
)
WILLIAM McKINLEY, JR.
)
)
)
v.
)
PCB 74-47
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF THE BOARD (by ~r.
Dumelle)
Petition filed January 28, 1974 is inadequate in that the
location of the lot for which a sewer connection is desired
is
not given.
Petitioner also should state whether his connection,
if granted, would
be to an overloaded
sewer. Petitioner is asked
to review the Board’s recent order in PCB 73-134, North Shore
Sanitary District v. EPA to determine whether he
can
now secure
a permit for connection after July 1, 1974.
Petitioner
is ordered to amend his petition within 35 days
from date of this order to provide the
information listed above.
A waiver of the 90-day decision period for the period elapsing
between the date of order and the filing of the amended petition
shall be made.
Failure to timely file the information requested shall render
the petition liable to dismissal as inadequate.
IT IS SO ORDERED,
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
~J/”~
day of January, 1974 by a vote of
~S’-o
Christan L. Moffe t,~lerk
Illinois Pollution~-tontrol Board
ii — 127