ILLINOIS POLLUTION
    CONTROL
    BOARD
    January
    31,
    1974
    FERGUSON
    & LANGE FOUNDRIES,
    INC.
    )
    PCB 73~474
    ENVIRONMENTAL PROTECTION AGENCY
    Stanley
    J. Wozniak, Morgan, Lanoff, Cook and Madrigan,
    appeared for Petitioner;
    Michael A,
    Benedetto,
    Assistant Attorney General,
    appeared
    for
    Respondent.
    OPINION AND ORDER OF THE BOARD
    (by Mr, Dumelle):
    On November
    8,
    1973, Petitioner filed
    a Variance
    Petition from Rule 3~3~l1lof the Rules and Regulations
    Governing the Control of Air Pollution and Rule 203(a)
    of
    the Air Pol.lution Regulations~ Petitioner seeks these
    variances until February 28,
    1974,
    The Agency filed a
    recommendation to grant the variance on January
    29,
    1974.
    Petitioner has installed an emission control system
    to eliminate particulate matter, which was designed by
    Combustion Engineering Associates,
    Inc.
    (CEA)~ A design
    error by CEA, necessitates the replacement of
    a large motor
    and modification~of
    a portion of the baghouse filter system~
    The Board finds that this delay was not caused by Petitioner
    and will result in limited particulate emissions~ The
    control system is currently operable and will achieve a
    99,9
    reduction
    in. particulate emissions once the corrections
    are
    made,
    The
    above
    consists
    of
    the
    Board~s
    findings
    of
    fact
    and
    conclusions
    of
    law.
    The
    Board
    hereby
    grants
    Petitioner
    a
    variance
    from
    Rules
    3~3~llland
    203(a)
    until
    February
    28,
    l974~
    IT
    IS SO
    ORDERED~
    I,
    Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, certify that the above Opinion and Order
    was adopted on
    this
    ~
    day
    of
    ~
    by
    a
    vote
    of
    ~
    11
    103

    Back to top