    E. I. DU PONT DE NEMOURS MID COMPANY, INC.
    PET~LTIONER
    v.
    )
    PCB 73—325
    ENVIRONMENTAL PROTECTION AGENCY
    RESPONDENT
    ORDER OF THE BOARD (by Mr. Marder)
    ORDER
    IT IS THE ORDER of the Pollution Control Board that Order #5
    issued October 18, 1973, in this matter is amended to read as follows:
    5) Respondent shall, within 35 days from the date of this Order,
    post a performance bond in a
    form
    satisfactory to the Agency,
    in the amount of $100,000 guaranteeing construction and in-
    stallation of the equipment herein required, by the expira-
    tion date of this variance or any subsequent variance rela-
    ting to this matter, which In
    form
    would be a continuation
    of the present variance; or
    abatement of the violation in
    the time
    prescribed by this variance.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois
    Pollution Control
    flr~ard, certify that the above Order was adopted by the Board on the
    24th day of January, 1974, by a vote of
    4~
    to ~