ILLINOIS POLLUTION CONTROL BOARD
    May 23, 1974
    )
    FERGUSON ~ LANGE FOUNDRIES,
    INC.
    )
    )
    )
    v.
    )
    PCB 74-181
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition for extension of variance filed May 17, 1974
    is. in-
    adequate
    in that it does not stipulate to the inclusion of the record
    of the earlier proceeding
    (PCB 73-474)
    into this one.
    Petitioner shall so stipulate within
    35 days from the date of
    this order.
    Failure to timely file the stipulation shall make
    the instant petition liable
    to dismissal for inadequacy.
    If
    the tests alluded to on page
    2 of the petition
    (No.
    5)
    are not
    part of the prior record then they shall be submitted with the
    stipulation.
    The 90-day decision period set by statute
    shall run from the
    date of filing of the stipulation and additional material.
    IT
    IS SO ORDERED.
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution ~ontrol
    Board, hereby certify the above Order was adopted on the
    ~
    day
    of May,
    1974 by
    a vote of
    ________________________
    Christan L. Mof~ett,/9.~.erk
    illinois Pollution ~4~trol Board
    12—401

    Back to top