ILLINOIS POLLUTION CONTROL BOARD
April 25, 1974
)
PRBMONT SCHOOL DISTRICT 79
)
3
vs
)
PCB
74-144
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF THE BOARD
(by Mr. Dumelle):
Petition filed April 23, 1974 is inadequate.
The exact
rules and regulations from which variance is desired are not given.
No factual data are given as to the “excessive” costs for equip-
ment or contracting and this allegation is wholly conclusory.
No data are presented giving effluent strengths of the
discharge of the sewage plant nor
is a description of the receiving
water and the effects of the discharge upon it given.
Petitioner is ordered to submit an amended petition within
45 days from the date of this order providing the required infor-
mation.
Failure to timely file the material required shall make
the petition liable to dismissal for inadequacy.
The 90-day decision period provided
by,, statute shall run
from the date of filing of the amended petition.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
a..’’
day
of April, 1974 by a vote of
.J-•~
Christan L. Moifett, Clerk
—
Illinois Pollution Control Board
12—lfl