ILLINOIS POLLUTION CONTROL BOARD
    Apr11
    18, 1974
    )
    CITY OF
    VLALVERLY
    )
    )
    )
    )
    PCB 74-129
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    CITY OF EUREKA
    )
    )
    PCB 74-132
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    VILLAGE OF NEW BERLIN
    )
    )
    v.
    PCB 74-133
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    Petitions
    for variance filed in the above-listed cases
    are
    inadequate in that
    they do not give the 1973 experience
    in actual
    copper levels resulting at
    the raw water intake.
    Petitioners
    (City of Waveriy and City of Eureka) are ordered
    to supply to the Board within 45 days
    from the date of this order
    the information requested in Board orders #3 and #4 in City of WaveriL
    v.
    EPA (PCB 73-127);and in City
    of Eureka v. EPA (PCB
    73-206).
    The Village
    of New Berlin shall
    file
    the data giving actual
    copper concentrations
    in its water systc~nafter copper sulfate dosing,
    if available.
    12—
    123

    -2-
    The 90-day decision period required by statute shall run
    from the date of filing of the amended petition.
    Failure
    to
    timely
    file
    the requested information will make
    the petitions
    liable
    to dismissal for inadequacy.
    IT
    IS SO ORDERED.
    I, Christan
    L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on the
    J~i~
    day
    of April, 1974 by
    a vote
    of
    ~
    ~hristan
    L.
    Moffet’t, ~Clerk
    Illinois Pollution Control Boird
    12— 124

    Back to top