ILLINOIS POLLUTION CONTROL BOARD
July II, 1974
MACEDONIA BAPTIST CHURCH
)
)
PCB74-246
ENVIRDNbCNTAR PROTECTION AGENCY
ORDER OF THU BOARD (by Mn Dumelle):
Petition filed July 1, 1974 is inadequate in that it
does not gibe the rEasons for, the
ban
on sewer construction
nor does it give the extent and frequency of downstream
basement flooding, if anyr nor does it explore alternatives
such as holding tanks for use during wet weathen
Petitioner shall file an amended petition within 45 days
fror tie date of thas Order pro .r3,ds-g
rrfcrrancr as nsted
above~ The 9elday period set by stat.ute ft.r decision shall.
no from tie dete of fn~~mgof toe arenled per~nor Patire
to timely file the amended petition shall.. make~td:elldtitl.on
liable to dismissal for inadeciuacy~
IT IS S•O OPdDEP~EDe
I, Christen
ha
Moffett, Clerk of the Illinois Pollution
COntrol Board, hereby certify that the above Order was adopted.
thisj~fl
day of July, 1974 by a vote of
SIC
13
—
53