ILLINOIS POLLUTION CONTROL BOARD
July 11, 1974
ENVIRONMENTAL PROTECTION AGENCY
V.
)
PCB73—282
ADOLPH
RAYMOND and JOSEPH NOVELLE
INTERIM ORDER OF THE BOARD (by Mr. Dumelie):
The Stipulation
and Proposal for Settlement contained
in the transcript
of
May
28, 1974 would have the respondent
agree to a penalty of $1,700 for the violations admitted to
in Paragraph 7. This Paragraph reads as follows:
Respondents admit they constructed, in-
stalled and operated the aerated holding
tank and. septic tank system from April 16,
1972 to June 1, 1973
without construction
or operating oerrnits having been granted
by the Illinois Environmental Protection
Agency (hereinafter “Agency”), havinq only
secured a permit to construct such facilities
from the Public Health Depar~tment of McHenry
County.
Reading this paragraph with Paragraphs No. 8-15 inclusive
indicates that the septic tank system violations alleged were
separate and distinct from the aerated holding tank violations.
The parties are ordered to file within 60 days any
showing of the necessity to obtain Dermits, whether con-
struction or onerating, for a septic tank system, under the
Water Pollution Regulations of the Board or under any regulations
still in effect as adopted by the Sanitary Water Board. The Agency
shall state the number of septic tank system permits it has
granted since the adoption of the Water Pollution Regulations and
give the size of the facitity served in terms of population
equivalents (P.E.).
If the parties do not find a legal basis for requiring
septic tank system permits, then in the alternative, they may
propose to the Board an amended stipulation.
IT IS SO ORDERED.
13—7
—2—
I, Christan L. Moffett, hereby certify that the Board adopted
the above Interim Order this //t1 day of July, 1974 by
a vote of
_____
Christan L. Moffe~.t’, 9M~k
Illinois Pollution CoW~ol Board