ILLINOIS POLLUTION CONTROL BOARD
    December 5, 1974
    )
    BETH-MOR MOBILE HOME PARK
    )
    )
    )
    )
    PCB 74-449
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed December 2, 1974 is inadequate in that
    the environmental effects of the proposed variance grant are
    not delineated. The strength of the Bethalto sewage treatment
    plant effluent before and after the proposed connection of
    the mobile home park to it are not given nor is the condition
    described of the receiving stream (dissolved oxygen, bottom
    deposits, algae, etc.) below the discharges.
    Furthermore, the petition seems to be internally
    inconsistent in that it refers to a “late 1974” date for
    completion of the interceptor sewer (1(d)) and yet at another
    point discusses a “December 15, 1975” completion date (5).
    An amended petition providing the information detailed
    above shall be submitted within 45 days of the date of this
    order to both the Board and Agency. Failure to timely file
    the needed information shall make the petition liable to
    dismissal for inadequacy. The 90-day decision period set by
    statute shall run from the date of filing the additional
    information.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on
    the
    ~
    day of December, 1974 by a vote of
    b~—o
    Cr\ ~
    Christan L. Moffett, ~er1c
    14—659

    Back to top