BETH-MOR MOBILE HOME PARK
)
)
)
)
PCB 74-449
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF THE BOARD (by Mr. Dumelle):
Petition filed December 2, 1974 is inadequate in that
the environmental effects of the proposed variance grant are
not delineated. The strength of the Bethalto sewage treatment
plant effluent before and after the proposed connection of
the mobile home park to it are not given nor is the condition
described of the receiving stream (dissolved oxygen, bottom
deposits, algae, etc.) below the discharges.
Furthermore, the petition seems to be internally
inconsistent in that it refers to a “late 1974” date for
completion of the interceptor sewer (1(d)) and yet at another
point discusses a “December 15, 1975” completion date (5).
An amended petition providing the information detailed
above shall be submitted within 45 days of the date of this
order to both the Board and Agency. Failure to timely file
the needed information shall make the petition liable to
dismissal for inadequacy. The 90-day decision period set by
statute shall run from the date of filing the additional
information.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify the above Order was adopted on
the
~
day of December, 1974 by a vote of
b~—o
Cr\ ~
Christan L. Moffett, ~er1c
14—659