ILLINOIS POLLUTION CONTROL BOARD
    December
    5,
    1974
    )
    IN THE MATTER OF
    )
    PERMIT NO.
    LM 21
    )
    from U.S.
    STEEL CORPORATION
    )
    PCB 74-424
    to ILLINOIS DEPARTMENT OF
    )
    TRANSPORTATION
    )
    )
    )
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    The permit application basically covers the dredging
    of two existing slips
    and the replacing of riprap at an existing
    breakwater.
    No new work
    is included that might interfere
    with lake currents
    or with
    the environment in any other way.
    The Chairman of the Pollution Control Board is authorized
    to sign the permit signifying concurrence
    by the Board with
    its issuance.
    IT
    IS SO ORDERED.
    I, Christan
    L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on the
    ~
    day of December,
    1974 by
    a vote of
    ‘~t~—~
    Christan
    L. Moffe
    Illinois Pollution
    t~ontro1
    Board
    14
    —647

    Back to top