ILLINOIS POLLUTION CONTROL BOARD
December
5,
1974
)
IN THE MATTER OF
)
PERMIT NO.
LM 21
)
from U.S.
STEEL CORPORATION
)
PCB 74-424
to ILLINOIS DEPARTMENT OF
)
TRANSPORTATION
)
)
)
ORDER OF THE BOARD
(by Mr. Dumelle):
The permit application basically covers the dredging
of two existing slips
and the replacing of riprap at an existing
breakwater.
No new work
is included that might interfere
with lake currents
or with
the environment in any other way.
The Chairman of the Pollution Control Board is authorized
to sign the permit signifying concurrence
by the Board with
its issuance.
IT
IS SO ORDERED.
I, Christan
L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify the above Order was adopted on the
~
day of December,
1974 by
a vote of
‘~t~—~
Christan
L. Moffe
Illinois Pollution
t~ontro1
Board
14
—647