ILLINOIS POLLUTION CONTROL BOARD
    May 8,
    1975
    MASON
    & MEENTS CONSTRUCTION COMPANY,
    Petitioner,
    v.
    )
    PCB 75—178
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    INTERIM ORDER OF THE BOARD
    (by
    Mr.
    Goodman):
    Mason
    & Meents Construction Company
    (Mason)
    filed its
    petition for an air variance on April
    28,
    1975.
    Mason’s petition is insufficient
    in that it fails to
    adequately state:
    1)
    the hardship encountered as provided
    in rule 401(a) (2); and
    2)
    type of emissions;
    and
    3)
    a show-
    ing by Petitioner as to whether the ambient air quality of
    the area effected by the variance meets the national ambient
    air quality standards as adopted by the Board;
    and
    4)
    if the
    ambient air quality does not meet those standards, whether
    the granting of the variance would contribute
    to the area’s
    failure
    to meet such standards;
    and 5)
    if ambient air
    quality does meet said standards,
    whether the variance would
    cause the ambient air quality to fail
    to meet said standards.
    It is the order of the Board that Petitioner shall
    amend its petition within 45 days of this order to provide
    the above described information.
    Failure to timely file the
    amended petition shall cause
    the petition to be dismissed for
    inadequacy.
    The 90—day decision period set by statute shall
    run from the date of filing the amended petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on
    the
    ________________
    day of
    /77
    ,
    1975 by
    a vote
    of ~
    Q~L~4n
    ~
    Christan L. Moffe~t~.q2?~Aerk
    Illinois Pollution Control Board
    16 —663

    Back to top