ILLINOIS POLLUTION CONTROL BOARD
April
 24, 1975
HOUSING AUTHORITY OF NORTH CHICAGO,
Petitioner,
v.
 )
 PCB 75—153
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
INTERIM ORDER OF THE BOARD
 (by Mr.
 Dumelle):
Petition filed April
 11,
 1975
 is inadequate in that no
date
 is given
 as to when the proposed 102-unit home for the
elderly will be completed and attached to the sewer system.
 In
addition,
 the most up-to-date estimated completion time for the
North Shore Sanitary District~sGurnee Plant is not given.
Petitioner shall amend its petition within
 45 days from the
date of this Order to provide
 the needed additional information.
Failure to timely file the needed information shall make the
petition liable
 to dismissal for inadequacy.
 The 90—day decision
period set by statute
 shall run from the date of filing the
additional information.
IT IS SO ORDERED.
I, Christan L. Moffett,
 Clerk of the Illinois Pollution Control
Boar
 hereby certify the above Interim Or
 r was adopted on the
~_day
 of April,
 1975 by
 a vote of
 o
 —.
Christan L. Moffett~4X~?rk
Illinois Pollution ~c?~roi
 Board
16
 —503