1. ENVIRONMENTAL PROTECTIONAGENCY,Complainant,
      2. 16 —345
      3. least one occasion when he could smell sulfur fumes inside
      4. All of the residents indicated that the conditions of
      5. which they complain are most severe during and after the
      6. conducting of soot—blowing operations at the generating
      7. station. They also relate the conditions to when wind is
      8. blowing from the south. Furthermore, in a stipulation and
      9. proposal for settlement submitted by the parties at the
      10.  
      11. collected in the affected area indicate that the apparent
      12. source of emissions of which the residents complain is the
      13. coal-fired boilers of the generating station. On these
      14. facts and evidence we feel a violation of Section 9(a) is
      15. clearly established as alleged in the complaint.
      16. of constructing the stack as provided in paragraph (h). An
      17. Agency Motion for Oral Argument on this issue, filed on
      18. March 31, 1975, was denied in an Order dated April 4, 1975.
      19. In that Order we requested written briefs on the question of
      20. time required to construct the stack. In a Supplemental
      21. Brief filed on April 7, 1975, settlement as proposed would
      22. necessitate additional discovery and relitigation, resulting
      23. in possible extension of the final construction of the stack
      24. past the date agreed to by the parties. As a result, the
      25. complaining citizens would face another summer or two without
      26. any remedial steps having been taken. In lieu of a reply
      27. brief, Peru filed a letter on April 8, 1975 seconding the
      28. Agency position and requesting immediate Board approval of
      29. the settlement proposal. We find the Agency reasoning
      30. persuasive. Prolonged litigation would only postpone the
      31. relief entitled the residents of the area. For this reason
      32. we accept the proposed settlement.
      33. We also recognize that the proposed settlement is not a
      34. foolproof plan to abate all possibilities of future nuisance.
      35. Interconnection with Illinois Power will allow Peru to place
      36.  
      37. emissions during those times when peak performance requirements
      38. necessitate renewed operation. We do not condone tall
      39. stacks as an effective means of abating pollution. But in
      40. this limited instance, where no emissions violations are
      41. involved, where the affected citizens reside on a bluff
      42. located above the lip of the stacks and where the plan
      43. includes a wind speed and direction anemometer to facilitate
      44. timely boiler blowdowns, we conclude that the taller stack
      45. should help to alleviate many of the citizens’ complaints.
      46. We would have wished more information on the parties’ considerations
      47. of alternatives, including electrostatic precipitators, but
      48. the record does not provide us with such.
      49. While the Agency admits that ,~articulate~andsulfur.
      50. dioxide emissions are within currently applicable limitations,
      51. there is no indication in the record as to whether such
      52. emissions will meet the requirements to go into effecton
      53. May 31, 1975. Accordingly, our acceptance of this stipulation
      54. should in no way be construed as a variance from or approval
      55. of a compliance plan for, the requirements of Rules 203(g)
      56. and 204. On the contrary, in the past we have twice had the
      57. occasion to deny petitions for variance from the Board’s
      58. regulations by municipalities intending to achieve compliance

ILLINOIS POLLUTION CONTROL BOARD
April
10,
1975
ENVIRONMENTAL PROTECTION
AGENCY,
Complainant,
PCB
73~5l6
CITY
OF
PERU,
A
Municipal Corporation,)
Respondent
Mr~Marvin N~Benn and Mr~
Marvin
I. Medintz, Attorneys of
Record for Complainant;
Mr~Charles
W, Heimig and Mr~Eugene H~Bernstein, Attorneys of
Record for Respondent~
This action involves a complaint filed by the Attorney
General on behalf of the Environmental Protection Agency on
Decemb..er
7,
1973.
The City of Peru
(Peru)
is charged with
causing air pollution in violation of Section 9(a) of the
Environmental Protection Act by unreasonably interfering
with the lives and property of individuals residing near its
elect~..icalgenerating facility.
More particularly,
the
complaint alleges that emissions from the facility’s boilers
cause
e..ye discomfort and pain, increased cleaning and maintenance
cost•••~s~and the prevention
of out-door enjoyment~
The
iacuity includes three coal-f.ired boilers, numbered
3 through 5~ The boilers exhaust by~productsof combustion
through stacks of heights 139.5, 141.5 and 116 feet, respectively.
The by-products include particulates and sulfur
oxides.
Boilers
4 and 5 are the subject of presently
valid operating
permits granted by the State of Illinois.
Boiler number
3
was previously granted a
one year variance on November
8,
1973, which required that it remain on coal stand—by and
that it be run for emergency purposes only
(PCB 73—255,
10
PCB 25)
It has not been operated since
January,
1974.
Units
4 and
5
are spreader stoker boilers which burn Illinois
coal with an average sulfur content
of
2.17.
The units are
equipped with Western Precipitator
multiclone collectors
whose original
stated collection
efficiencies were
93.2
and
92.6
respectively.
Peru admits the efficiencies of these
collectors may have degraded since installation.
Generator
ratings of the turbines associated with these boilers are
4,000 kw and 7,500 kw, respectively,
The Agency admits that
particulate and sulfur dioxide emissions are within currently
16 —345

—2—
applicable limitations.
In addition to the coal generating
units, the facility also has a diesel engine generator and a
gas turbine generator with ratings of 6,250 kw and 11,500
kw, respectively.
The total system peak electrical demand
was 18,100 kw, established in July,
1974.
To the north of the generating station and located on a
bluff rising from the Illinois River above the lip of the
stacks is a residential area containing single family residences.
Several residents from this area testified at hearings held
in this
case on June 5 and December 16,
1974.
These residents
uniforftbl.y complained of the emissions from the facility’s
stacks.
Irritation ~f the eyes was attributed to the emissions
by several of the witnesses
(June
5
R.
9,
48,
57; December
16 -R.
37,
80).
A physician,
Dr. Assalley, described the
effect of sulfur dioxideon the lungs and muscosa of the
eyes,
and attributed his treatment of two area residents for
bronchitis and pharyngitis to times of increased “sulfur
dioxide and general alfelon
(sic)
and aromatic hydrocarbon”
resulting from the power plant emissions
(June
5
-
R.
56-7,
60)
The witnesses also described the deleterious effects of
the particulate matter on houses, automobiles and other
personal property
(June
5
-
R. 25,
33,
49;
December 16
-
R.
75).
Photographs admitted as exhibits reveal accumulations
of fly ash and soot on, and resultant paint damage to,
a
picnic table,
house eave, wood siding and an aluminum storm
window (December 16 —R. 75—78).
Many of the witnesses also complained that the particulates
and odor from the emissions prevented them from enjoying
their property.
One resident testified that she is forced
to keep her southern windows closed
(June
5
-
R.
29)
while
another refrained from using her backyard and screened—in
porch
(June 5
-
R.
41).
Another resident testified to at
least one occasion when he could smell sulfur fumes inside
his house
(June
5
-
R.
50)
-
All of the residents indicated that the conditions
of
which they complain are most severe during and after the
conducting of soot—blowing operations
at the generating
station.
They also relate the conditions
to when wind is
blowing from the south.
Furthermore,
in a stipulation and
proposal for settlement submitted by the parties at the
second hearing, Peru admits that analysis of dust samples
collected in the affected area indicate that the apparent
source of emissions of which the residents complain is the
coal-fired boilers of the generating station.
On these
facts and evidence we feel a violation of Section 9(a)
is
clearly established as alleged in the complaint.
16
—~
346

—3—
According to the stipulation, both parties feel substantial
relief can be provided the residents by reducing the emissions
from coal—fired boilers through reduced operation of boilers
4 and
5,
by enhancing the dispersion
of the emissions,
by
limiting soot-blowing operations
to times of optimum meteoro-
logical conditions,
or by
a combination of any or all of
these strategies.
In addition, Peru has been negotiating
for an agreement for the purchase of sufficient firm electric
power from Illinois Power to permit it to place both boilers
4 and 5 on cold stand-by.
The construction and installation
of permanent interconnection facilities is estimated to cost
$990, 000.
The stipulation further states that dispersion of
emissions can be enhanced by erection of
a single tall stack
through which all the coal-fired boilers would vent, and
engineered in conformity with a dispersion analysis based
upon modeling techniques agreed to by both parties.
The
cost of such a stack is estimated at $750,000.
The purpose
would be to reduce plant emissions during the interim period
of change—over to purchased power.
Also,
installation of
a
wind speed and direction anemometer with a chart recorder
and smokedensity monitors,
at a cost of $6,500, would
permit soot-blowing operations to be conducted so as to
minimize emissions to the affected residential areas.
After considering alternatives, including backfitting
electrostatic precipitators downstream from the existing
dust collection equipment,
and after considering difficulties
in financing and increases
in electric rates, both parties
jointly concluded that the program described above represented
the optimum solution.
Accordingly,
they entered a proposed
settlement consisting of the following terms:
a)
Respondent shall immediately upon approval of this
settlement take steps to install
a stack with
a height
to be determined by dispersion modeling based upon
generally accepted modeling techniques.
Both the
dispersion modeling and the dimensions of the stack
shall be as agreed upon by representatives of the
parties to this Stipulation.
The stack, which will be
completed as soon as feasible, but not later than
October
31,
1976, will have a height of 300 feet or
greater in order to alleviate,
as nearly as may be,
problems experienced by nearby residents with respect
to the emission of particulate matter and sulfur dioxide
during periods of normal operation of the coal—fired
boilers.
16—347

—4—
b)
Respondent, within
3 months of the signing of this
Stipulation by the parties, shall install a wind speed
and direction anemometer
in a suitable location with a
chart recorder in the boiler control room.
Boiler
blowdown shall
then only be conducted when the wind
is
from a favorable direction unless continuous southerly
winds for an extended period reasonably require otherwise.
c)
Respondent, within three months of the signing of
the Stipulation by the parties, shall install smoke
density monitors downstream of pollution control equipment
on Boiler Nos.
4 and 5 with a chart recorder in the
boiler room.
The information thereby provided with
respect to the effect of boiler operating conditions
on
emissions and as to emission rates from the boilers
will be made available to the Agency.
d)
Respondent, within one month of the signing of
this Stipulation by the parties,
shall order an inspection
of the multiclone collectors by the manufacturer.
Respondent shall diligently act,
as mutually agreed
upon
by
the
parties
to
this
Stipulation,
to incorporate
any suggestions by
the
manufacturer
of
the
multiclone
collector
which
would
reasonably
increase
the
eif:Lciency
of the collector,
~ieasonab1yu
is
here
used
to
mean
a
significant
anticipated benefit
on
account
of
an
increase
in
efficiency
in
Light
of
the
cost
of
upgrading
and
anticipated period of benefit.
e)
Respondent shall diligently
act
to establish a
permanent
interconnection
with lll~nois Power Company
and shall diligently construct and .instail p.ermanent
interconnection facilities.
:E)
Respondent
shall
diligently
negotiate for a firm
purchase
power
agreement
on
reasonable
terms and
con-
ditions
which
provides
for
purchase by Respondent
of
suffiqient
amounts
of
power
to
permit Boiler Nos.
4 and
5
to
:be
placed
on
co:Ld
stand—by
and
to he utilized only
when
purchase
power
is
unavailable,
‘~Reasonabie~is
here
used
to
mean
in
line
with
other
similar
purchase
power
agreements.
Pursuant
to
the
above
program
Re-
spondent
shall
use
all reasonable efforts and due
diligence to place Boiler Nos.
4 and 5 on cold stand-
by,
to be used only when purchase power is unavailable.
16
-~
34~

—5—
g)
Respondent shall at all times act diligently to
purchase from Illinois Power Company as much power as
is required to adequately supply its customers and is
available to Respondent under Sections
1,
2, and
4 of
Article IV of Exhibit A hereto,
save for that power
which Respondent is reasonably required to generate
itself in compliance with Section
5 of Article V of
Exhibit A.
(Exhibit A constitutes
a temporary inter-
connection contract dated August 19, 1974.)
h)
In the event it shall appear reasonably certain
that Boilers
4 and 5 will be placed on cold stand-by
prior to the time work necessary to install a tall
stack
[as
provided
in
subparagraph
(a)
hereof]
can be
completed
and
it
shall
further
appear
that
Respondent
has diligently
and in good faith
pursued
the
timely
installation of the tall stack, then such tail stack
installation shall not be
required
by
the
terms hereof.
In the event that Respondent shall be relieved under
this subparagraph
(h)
of the requirement to
install
the
tail
stack, Respondent, whenever generating electrical
energy,
shall,
to the extent the appropriate fuel
is
available
to
it, utilize either
the
gas
turbine
generator
or
the
diesel
engine
generator,
both
as
described
in
paracraph
9,
prior
to
the
uti:Lization
of
the
coal
fired
units.
I)
Respondent
shall
file
with
the
Agency
quarterly
crogress
reports
detailing
its
progress
in
completing
the
program
herein
provided
for,
including
but
not
limited
to
both
the
financing
of
the
program
and
the
steps
taken
to
accouplish
the
necessar~
const.ruction.
The
reports
shall
be
sent
to
Control
Program
Cocrdinator,
Division
of
Air Pollution
Control,
2200
Churchill
Road,
Springfield,
I:LljT1O~S.
Such
reports
shall
cover
the
calendar
quarters
and
shal:1.
he
due
within
21
days
•of
the
final
day
of
each
such
calendar
quarter.
A
final
report
shall
he filed
upon
completion
of
the
proeram
herein
provided
for.
j)
Nothing
herein
shall
be
construed
to he
an
ad-
mission by Respondent of the existence of a violation
of Section
9(a)
of the Act
(Ill.
Rev.
Stat,,
ch, 111-
1/2, ~
1009(a)
(1971)).
In order to avoid the expense,
inconvenience
and
diversion
of
City
officials
from
more
constructive duties which could accompany protracted
hearings to determine whether such a violation might
exist, Respondent agrees that in the event the Board
finds a violation of Section 9(a)
of the Act, Respondent
shall remit and shall pay the sum of $1,500 to the
State of Illinois
(remitted to the Fiscal Services
Section, Environmental Protection Agency).
Such pay-
ment
is in consideratioi~of settlement of the issues
raised in the Agency’s complaint.

—6—
We have reservations about the length of time set out
in paragraph
(a)
of the settlement agreement for the completion
of the stack.
We feel that one year would probably be an
adequate period of time within which to construct the stack.
Apparently, Peru desires the extra time in order to effect
the interconnection agreement
--
thus eliminating the obligation
of constructing the stack as provided in paragraph
(h).
An
Agency Motion for Oral Argument on this issue,
filed on
March
31,
1975, was denied in an Order dated April
4,
1975.
In that Order we requested written briefs on the question of
time required to construct the stack.
In a Supplemental
Brief filed on April
7,
1975, settlement as proposed would
necessitate additional discovery and relitigation, resulting
in possible extension of the final construction of the stack
past the date agreed to by the parties.
As a result, the
complaining citizens would face another summer or two without
any remedial steps having been taken.
In lieu of
a reply
brief, Peru filed a letter on April
8,
1975 seconding the
Agency position and requesting immediate Board approval of
the settlement proposal.
We find the Agency reasoning
persuasive.
Prolonged litigation would only postpone the
relief entitled the residents of the area.
For this reason
we accept the proposed settlement.
We also recognize that the proposed settlement is not a
foolproof plan to abate all possibilities of future nuisance.
Interconnection with Illinois Power will allow Peru to place
its remaining boilers on cold stand-by, but will not prevent
emissions during those times when peak performance requirements
necessitate renewed operation.
We do not condone tall
stacks as an effective means of abating pollution.
But in
this limited instance, where no emissions violations are
involved, where the affected citizens reside on a bluff
located above the lip of the stacks and where the plan
includes a wind speed and direction anemometer to facilitate
timely boiler blowdowns,
we conclude that the taller stack
should help to alleviate many of the citizens’
complaints.
We would have wished more information on the parties’ considerations
of alternatives,
including electrostatic precipitators, but
the record does not provide us with such.
While the Agency admits that ,~articulate~andsulfur.
dioxide emissions are within currently applicable limitations,
there is no indication
in the record as to whether such
emissions will meet the requirements to go into effecton
May 31,
1975.
Accordingly, our acceptance of this stipulation
should in no way be construed as a variance from or approval
of
a compliance plan for, the requirements
of Rules 203(g)
and 204.
On the contrary,
in the past we have twice had the
occasion to deny petitions for variance from the Board’s
regulations by municipalities intending to achieve compliance
16—350

—7—
by interconnection with Illinois Power, City of Highland v.
EPA,
PCB 73-288,
13 PCB 167
(1974) and City of Carlyle v.
EPA,
PCB 73-264
(January 16, 1975).
We hold here only that the
proposed settlement plan should help alleviate many of the
nuisance complaints at issue in this cased
Although Peru denies admission of a violation of Section
9(a)
in the proposed settlement
(paragraph
j),
we have found
sufficient evidence in the record to warrant such a finding.
We accept Peru’s agreement to pay the sum of $1,500 as a
penalty for this violation.
To help ameliorate citizen
fears of stalled implementation of the plan proposed herein,
we feel a cease and desist order is appropriate.
This Opinion constitutes the Board’s findings of fact
and conclusions of law.
ORDER
It is the Order of the Pollution Control Board that:
1.
Respondent, the City of Peru,
shall immediately
undertake to implement paragraphs
(a)
through
(j)
of the
stipulated settlement contained herein.
2.
Respondent, the City of Peru, except in accordance with
the provisions
of this Order, shall cease and desist from
further violations of Section
9(a)
of the Environmental Protection
Act.
3.
Respondent, the City of Peru,
shall pay the sum of
$1,500 as
a penalty for the violations of Section 9(a)
of the
Environmental Protection Act found herein.
Penalty payment by
money order or certified check shall be made payable to:
Fiscal Services, Environmental Protection Agency,
2200 Churchill
Road,
Springfield, Illinois
62706, within 35 days of this Order.
4.
If repair of the multiclone collectors and construction
of the tall stack are deemed necessary
a performance bond in the
amount of $100,000 shall be filed with the Agency within 35
days.
5.
Within
35
days
of
the
adoption
of
this
Order,
the
City
of
Peru shall execute and forward to the addresses noted below,
a certificate of acceptance
in the following form:
16
351

—8—
I
(We)
having read and fully understood the Order of
the Illinois Pollution Control Board in PCB 73-516,
hereby accept said Order, understanding that such
acceptance is irrevocable and renders binding
all
terms
and conditions thereof.
Signed:
____________
__________________________
Title:
__________
________________________
Copies
of
such
certificate
shall
be
submitted
to
the
Illinois
E.nvironmental
Protection
Agency,
Air
Division,
2200
Churchill
Road,
Springfield,
Illinois
62706
and
the
Office
of
the
Attorney
General,
Environmental
Control
Division,
188
West
Rando.lph
Street,
Chicago,
Illinois
6C6Ol.
I,
Christan
L.
Moffett,
Clerk
of
the
Illinois
Pollution
Control
Board,
.hereby
certify
the
above
Opinion
and
Order
were adopted
on
the
J~~~day
of
April,
1975
by
a
vote
of
Christan L. Moffétt, C
Illinois Pollution Co
ol Board
16
—352