ILLINOIS POLLUTION CONTROL BOARD
    March
    26, 1975
    )
    )
    REVEREND ARTHUR STEVENSON,
    )
    )
    Petitioner,
    )
    )
    )
    v.
    )
    PCB 75-121
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    )
    Respondent.
    )
    )
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    Petition filed March
    19,
    1975
    is inadequate in that
    no
    information
    is given as
    to the timetable
    for the remedying
    of inadequate
    capacity at the North Shore Sanitary District
    Sewage Plant in North
    Chicago.
    Petitioner shall supply the needed information with
    45 days.
    Failure to timely file the needed information shall make~the
    petition liable to dismissal for inadequacy.
    The 90-day
    decision period set by statute shall
    run from the date
    of
    filing the additional
    information.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board,
    hereby certify the above Or er was adopted on the
    ~
    day of March,
    1975 by
    a vote of
    —tb
    ristan L.
    Mo
    e
    ler
    Illinois Pollution
    ontrol Board
    16
    —249

    Back to top