ILLINOIS POLLUTION CONTROL BOARD
March 13, 1975
SAMUEL BINGHAM COMPANY,
Petitioner,
v.
)
PCB 74—426
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD (by Mr. Duinelle):
The Motion for Modification filed March 3, 1975 is allowed.
The Order of February 14, 1975 is modified and Paragraphs 3 and
4 are changed to read as follows:
3. Petitioner shall submit a revised compliance
plan to the Agency by March 15, 1975 which shall
detail a program for achieving compliance with
Rule 205(f) of the Air Pollution Control Regulations.
Said compliance plan shall be submitted to:
Environmental Protection Agency
Division of Air Pollution Control
Control Program Coordinator
2200 Churchill Road
Springfield, Illinois 62706
4. Petitioner shall execute a Performance Bond in
a form acceptable to the Agency in the amount of
$1,000. The purpose of this bond is to insure timely
installation of the hydrocarbon vapor recovery system
or any other system or method of complying with Rule 205(f).
IT IS SO ORDERED.
—
Mr. Henss abstained.
—
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
73~’
day
of March, 1975 by a vote of
2—c
Christan L. Moff ~I%lClerk
Illinois Pollution ‘control Board
16
—
118